Loading...
Hager Container-CS 880811GINN. INC. CONSULTING ENGINEERS Date: August 11, 1988 ,h,' ~J~'l.__ From: Kevin Peiffe Subject: Hager Containers Addition We have reviewed the preliminary/final plat and construction plans for the above referenced project. · nce and master thoroughfare plan, Per the sub-division.~d{n~ .... ~n~ thoroughfare and th~s Ro al Lane is classlIle~ u~ ~ ~2~, ri-bt-of-way currently re~lres a 110' righ~.-°f-~t%L ..~ ~%~,,te~ an additional 5' O~ ~4~tS. AS a result, the suu~ ~,~ ~2~3 ~-~nta~e. This reqUesu ~T-ii _~ .... to be dedicated along un~ ~ ~-~ Lane as each will be made to all properties fronting property goes through the platting process. · , eason the city requires 110' of rig~t- of-way vs. 100' is ~ =x~f ..~L~.= sidewalks and ~e,, ~tilities, other pub£1C uuxx~-,~ this additional and irrigation- Experlence--h~.d t~ ,,stack" utilities, etc. due greatly reduces the chance or u= to parkway width restrictions- The other comment we have is in regards to the construction plan~ The fire lane is required per the sub-division ordinance to be 6" of concrete (3000 psi) on a 6" lime stabilized subgrade. The staff does not support crushed stone as an acceptable alternative to this requirement- 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 ® Phone 2141248-4900