Loading...
Gateway BP (1.1)-LR 900813 GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS TERRA-lIAR ' 7679 LOMBARDY, DALLAS,~X 7~ PHONE:214-352-g352 . SOI. L~ MOISTURE ;r~ENS1TY TEST REpoRT IN PLACE TESfT~ NUCLEAR. ]~I~THOOS To: City of CoppelI ..... C/O Engineering Deptartme~ 732 Deforest Road P.O.Box 478 SPEC~CA~ONS REPORT DATE: 08/13/90 TMI REPORT NO.: DC90 - 147 - 3 REPORT DISTRIBUTION: Catellus Development Corp., Albert H.Halff Assoc. Inc. L.H.Lacy Co. TEST DATA Percent Compaction: 95-100 MffmmreConmnt(%): Opt. +5 Date Teste~ 08/09/90 Tech~/dan: R.C. Dygert MATERIAL REFERENCE CURVE DATA CURVE TEST MATERIAL DESCRIFI~ON MA~ DRY OPTIMUM NO. M~THOD DF, NSITY(pcr') MOISTURE(%) 1 ASTM D698 Dark Gray Brown Clay w/Calc. 90.3 27.8 IN - PLACE TEST RESULTS DENSITYANO MOISTURE TESTS ARE PER ASTM 02922, 03017, RESPECTIVELY TEST LIFT OR LOCATION REF. DRY DENSrl~ MOISTUP,~ % OF MAX. NO. ELEVATION CURVE (p.c.f.) (%) DRY DENSrl'Y 1 1st Backfill Around Manhole Ln.B @ Sta.0+00 1 88.0 32.0 97.5 2 2nd Backfill Around Manhole Ln.B @ Sra.0+00 1 86.0 32.3 95.2 3 3rd Backfill Around Manhole Ln.B @ Sra.0+00 1 89.0 30.1 98.6 NUCLP2& EQUIPMENT I.D. #6 STD. DENSITY COUNT 2610 AN "WAFTER TH E TEST NUMB ER INDICATES RETEST. TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED BELOW: StD. MOISTURE COUNT 576 Remarks: TERRA-lqAR DalM$ · Fort Worth · Houston * Austin 7679 LOMBARDY, DALLAS, TX~.g~20 PHONE:214-352-8352 SOIL MOISTURE~D~Ns1TY TEST_ REPORT Z(c: Lo~j ._ _-.:,:-=-tN_~_PLACK-TESTS BY NUCLEAR METHODS C/J]EN~' Catellus Developme~ Corp., REPORT DATE: 08/13/90 PRO~CT: Gateway Business ~k Phase I ~ REPORT NO.: DC90-147~4 ~ / REPORT DISTRIBUTION: To: ~ ~'~ Catellus Development Corp., City of CoppeI1-- Albert H.Halff Assoc. Inc. c/o Engineering Deptartment L.H.Lacy Co. 732 Deforest Road P.O.Box 478 Coppell,TX 75019 SPECIFICATIONS Percent Compaction: 95-100 Moisture Content(%): Opt. +5 TEST DATA Date T~st~d: 08/09/90 T~lmi~ia.: R.G. Dygert MATERIAL REFERENCE CURVE DATA CURV~ TEST MATERIAL DESCRIFIION MAX. DRY OPTIMUM NO. METHOD DENSITY(pc/) MOISTURE(%) i ASTM D698 Dark Gray Brown Clay w/glae. 90.3 27.8 IN - PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2E22, D3017, RESPECTIVELY TEST L1Fr OR LOCATION RE~. DRY DENSITY MOISTURE % OF MAX. NO. ELEVATION CURVE (p.c.f.) (%) DRY DENSITY 1 6th Backfill at Manhole Line "B" @ Sta.0+00 1 76.7 32.9 85.1 ** 2 6th Retest of #1 dated 8-09-90 @ Sra. 0+00 1 89.4 29.7 99.1 3 7th Backfill at Manhole Line "B" @ Sta.0+00 1 90.3 30.0 100.0 4 8th Backfill at Manhole Line "B" @ Sra.0+00 1 90.0 28.0 99.9 5 9th Backfill at Manhole Line "B" @ Sra.0+00 1 87.6 30.3 96.9 6 10th Backfill at Manhole Line "B" @ Sra.0+00 1 87.8 32.9 97.3 7 Final Backfill at Manhole Line "B" @ Sra.0+00 1 86.0 33.5 95.2 NUCLEARF~)UIPMENTI.D. #6 Sq"D. DENSITY COUNT 2610 STD. MOISTI3RECOUNT 576 AN #R'AFTER TN E TEST NUMBER INDICATES RETEST, TEST RESULT8 COMPLY WITH PROJ E CT SPECIFICATIO NS UNLESS INDICATED BELOW: ** PERCEN'r OF MAXIMUM DRY DENsfI'¥ (COMPACrlONr) DOES NOT COMPLY WITH PROJECT SPECIFICATIONS. R~m~: Clyde Murray requested that the TMI representative stay on site until backfill operations were completed.