Loading...
TR9701-CS 960726Post-it® Fax Note 7671 Date · ,.o ,=ro,,, Co.~Oept. ~ ?.~ co. =hone# ~,.? '~Z - ~,~,"~$ Phone July 26, 1996 Mr. Tony Trammell, P.E. Parsons Brinckerhoff CMAQ Program Office 1701 N. Market Street Suite 410 Dallas, TX 75202 Dear Mr. Trammell: We respectfully request the locations at Belt Line Road at Airline Drive and Belt Line Road at Lakeshore Drive to be included in the Dallas County CMAQ Program project #75. The project consists of signal timing improvements along the Belt Line Road/Denton Tap corridor. Please fred attached 24 hour ADT material at these two locations. We feel the signals are appropriate since they are in an industrial area that has experienced tremendous growth in the last couple of years, and are located between signals that are warranted along Belt Line Rd. The traffic signal at Lakeshore at Belt Line Road will be constructed in the next three to four months. The traffic signal at Belt Line Road at Airline Drive may be constructed in the next 18 months. We have conducted an analysis of the trips generated for an office/distribution building located at the northwest comer of Lakeshore Drive at Belt Line Road. Based on the fifth edition of the ITE Trip Generation book, the trip generation for the 217,000 SF office/distribution building with 350 employees is 1,368 trips/day. 5th Ed. ITE Trip Generation Warehousing Use: Weekday 24 hr. AM Pk. Hr. trips PM Pk. Hr. trips trips generated generated generated 217,000 SF office/warehouse 1,142 162 181 distribution bldg. 350 employees 1,368 186 212 Entrance for employees parking is anticipated to be fully off of Lakeshore Drive with only visitor and selected management parking entering from Belt Line Road. With the existing volume on Lakeshore being 321 vehicles per day, a total 24 hr. projected volume with the proposed development is 1,689 vehicles per day. Based on the projected 24 hr. volume, the traffic signal may meet the TxDOT abbreviated warrant criteria at Lakeshore/Belt Line Rd. The city is willing to contribute $500.00 into each of the two intersections requested to be included into the CMAQ Program. In order for the city to pay for the local funding match, an invoice from Dallas County will have to be submitted to us by September of this year. Please let me know if there is any further information needed. Thank you for your assistance in this matter. Sincerely, Ami Patel, E.I.T. Graduate Engineer Department of Engineering Attachment: Traffic counts on Airline Drive and Lakeshore Drive. -'l ! T I