Loading...
Gateway BP(1.1)-AG 931012AGENDA REQUEST ITEM CAPTION: PU uC Consideration and approval of replat of Gateway Business Park, Lots I and 2, Block 2, located at the northwest corner of Freeport Parkway and Gateway Boulevard at the request of Albert Halff and Associates. SUBMITI'ED STA]~ REP.: Gury I,_ Ri~,h Director of l~nnln_o & Comm. Servic~ DATE: EVALUATION OF ITEM: Date of Planning and Zoning Commission: September 16, 1993 Decision of Planning and Zoning Commission: Approval (7-0) Please see attached staff report for further details. AMT. +/- BUDGET COMMENTS: AMT. ESTBiATED //~,// (9/2 . FINANCIAL RE~ B~ LEGAL RE~ BY: AGENDA REQUEST FORM REV~£D 2/93 REVIEWED BY CM, '¥J / CASE #: P & Z HEARING DATE: C. C. HEARING DATE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Replat of Gateway Business Park. Lots l&2. Block 2 September 16, 1993 October 12, 1993 LOCATION: At the northwest corner of Freeport Parkway and Gateway Boulevard. SIZE OF AREA: 70.38 acres of land. CURRENT ZONING: Light Industrial (LI) Approval of a replat. APPLICANT: Albert H. Halff Associates, Inc. Pat Acker, P.E. 8616 Northwest Plaza Drive Dallas, TX 75225 (214) 739-0094 Catellus Development Corp. 5429 LBJ Freeway Suite 600 Dallas, TX 75225 HISTORY: Gateway Business Park was approved by the City Council on June 12, 1990. The conditions of approval were as follows: 1) the landscaping of parkways shall be completed as the individual lots are developed, 2) all applicable fees shall be paid by the lot owner as the individual lots are developed, 3) that the owners maintain the temporary drainage easements, Item 13 4) that shrubs be provided along Freeport Parkway at a secondary image zone, 5) that the City ask for a hold harmless and indemnity agreement and, 6) that the director of Public Works will decide the requirements for and the timing of the sidewalks. TRANSPORTATION: Subject property is bound by Freeport Parkway (C4D/6) along its western boundary, Gateway Blvd. (C4U) to the south, I.H. 635 (LRI Freeway), and the St. Louis & Southwestern Railroad to the north. SURROUNDING LAND USE & ZONING: North - Vacant; Light Industrial (LI) zoning. South - Vacant; Light Industrial (LI) zoning. l~aat - Vacant; Light Industrial (LI) zoning. West - Vacant; Light Industrial CLI) zoning. COMP. PLAN: The comprehensive plan suggests light industrial as the highest and best use of the property. ANALYSIS: The site in its present configuration will not allow for Interceramic to situate their building according to their plans on the property. Therefore, a replat must occur prior to any development on the parcel. Immediate plans for this site include a 250,000 square foot building for Interceramic Tile Manufacturing. Phase I will occur on Lot I with future plans to expand to a 500,000 square foot building. Future expansion will occur on Lot 2. Additionally, the Engineering Department offers the following comments: 1) The current plat filed for record for Gateway Business Park shows a street running east to west through Block 2. This street is important in the fact that it was located generally in the area where the drainage would be conveyed. There was a proposed drainage system in the stzeet. By elimination the st~et, you are also eliminating the area to provide a drainage system. It is my understanding the athere is a facility to be constructed on Lot 1 that has a building approximately 1,000 feet long that could stretch from north to south on the lot and in essence block any opportunity to convey drainage through this site. A revised draingage plan sould be submitted for this site to insure that adequate provisions are being provided for the conveyance of drainage through the site. 2) The Master Plan shows that a 16" water line should be installed along Freeport Parkway. 3) A drainage study must be submitted to the Engineering prior to the City Council meeting. ALTERNATIVES: 1) Approve the replat 2) Deny the replat 3) Modify the replat. ATTACHMENTS: 1) Replat .stf