Loading...
Villas at LV-LR050624 ALPHA TESTING, INC. 2209 W/econ.~n ~X: ~72/4~3 TE~TEO FOR: WPC 2004 COPPE~L, L.P CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, REPORT OF FIELD COMPACTION TESTS DATE: 06124105 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO,: 05152-7 TEST DATA: 85 08/24105 FG-4,0 4 23.5 95.5 244 94 97 1-A 88 06~24/0§ FG-35 4 23 5 96,5 22 § ,95 99 1-A 87 06124/05 FG-3,0 4 23,5 96,5 23.3 94 97 1-A 88 06f24105 FG-2.$ 4 23.5 965 25.2 8g 08124/05 FG-2,0 4 23,5 965 24.2 94 98 1-A 90 08/24/05 FG-1 5 4 23,5 96.5 259 g5 98 1-A 91 06/24/05 FG-1,0 4 23.5 96.5 24.4 94 97 ,1-A TEST LOCATION: UTILITIES 85 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 0+50 88 WATER LINE ALONG SANITARY SEWER L~NE C AT PAVING STATION 0+50 87 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 0+50 88 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 0+50 89 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 0+50 90 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 91 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 0*50 ALPHA TESTING, INC, REPORT OF FIELD COMPACTION TESTS 220~ Wisconsin St,, Suite F~. TESTED FOR: WPC 2004 COPPELL, L,P C/O DOWDEY, ANDERSON & ASSOCIATES P~NO, TE~S DATE: 06/24/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 05152-7A TEST DATA: 92 06/24/05 FG-05 4 23,5 965 23,8 95 98 1-A 93 06/24105 FG 4 23,5 96.5 233 94 97 1-A 94 0§/24/05 FG-40 4 23~ 98,5 23.3 g§ 100 1-A 95 06124105 FG-3.5, 4 23,5 96,5, 248 94 g8 1-A g6 06/24105 FG-3.0 4 23.5 96,5 24.1 ~4 97 1-A 97 06124105 FG-25 4 23,5 g6.5 24.2 95 99 1-A 98 0§F24/05 FG-2,0 4 23.5 g6,5 25,1 94 98 1-A TEST LOCATION: UTILITIES 92 WATER LiNE ALONG SANITARY SEWER LINE C AT PAVING STATION 0+50 g3 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 0+50 94 WATER LINE ALONG SANITARy SEWER LINE ¢ AT PAVING STATION 3*50 g6 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 3*50 98 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 3+50 97 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 3+50 98 WATER LINE ALONG SANITARY SF~WER LiNE C AT PAVING STATION 3+§0 ALPHA TESTINg, INC. 220~ VVIscor~sln St, Softie DO#as, T~ ~ ~STED FOR: WPC 2004 COPPELL, L,P. CIO DOWDEY, ANDERSON & ASSOCIATE~ P~NO, REPORT OF FIELD COMPACTION TESTS DATE: 06124105 PROJECT VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.; 05152-7B TEST DATA 99 06/24105 FG-1.5 4 , 23,5 96.5 23.1 94 98 1-A 100 06/24105 FG-1,0 ,4 23.5 ~18.5 23.7 95 99 1-A 101 06/24105 FG-05 4 23.5 96.5 24.8 94 97 1-A t02 05/24/05 FG 4 235 98,5 24,2 94 98 '~-A TEST LOCATION: UTILITIES 99 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 3','50 100 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 3+50 101 WATER LINE ALONG SANITARY SEWER LINE C AT PAVING STATION 3+50 1D2 WATER LINE ALONG SANITARY SEWER LIN,E C AT pAVING ~iTATION 3*50 Gaalechni~el Engineering /~: Construc~op Mate~iJl$ Tesl~9 ~?~ Envlronrnenlal Engtnee~hO ~ G~nsult~g