Villas at LV-LR050618ALPHA TESTING, INC.
REPORT OF FIELD
COMPACTION TESTS
220~ W~scon~/n St., Su/te I~
~72/~11 - 972/2~9~7
~/~'~ I1 Illl
TE~ED FOR: WPC 20~ COPPELL, L,P,
CIO ~WDEY, ANDERSON &
DATE: 06H~/05
PROJECT:
~LLASATLAKEVISTA PHASE ONE
COPPELL, TEXA$
OUR REPORT NO,: 05152-4
TEST DATA:
i~-
NO. rlATE NUMbeR ~ PCP ~ pcs
21 06/16/05 FG-3.0 0477314 23.5 96.5 24.4 04 ;)B 1-A
22 08/18/05 FG-2.5 0477314 23.5 96,6 26,6 92 95 I-A
23 06/16/05 FG-2.0 0477314 23.5 96,5 26,7 92 96 1-A
24 06/16/05 FG,.1.5 04773/4 23,8 9(~.5 24.8 94 96 1-A
25 06/18/05 FG-1.0 04773/4 23,5 96.5 27.3 94 97 1-A
26 06/16/05 FG~O.$ 0477314 23.5 96.5 26.8 93 97 I*A
27 0B118tq5 FG 0477314 235 96.~; 25,0 95 99 1-A
TEST LOCATION: UTILITIES
21 SANITARY SEWER LINE O AT PAVING $TATION 3+50
22 SANITARY SEWER LINE D AT PAVING STATION 3+50
23 SANITARY SEWER L!NE D AT PAVING STATION 3+50
24 SANITARY SEWER LINE D AT PAVING STATION 3+50
25 SANITARY sEW.E,R., LINE D AT PAVIMG STATION 3+50
26 SANITARY SEWER LINE D AT PAVING STATION 3+50
27 SANITARY,SEWER LINE D AT PAVING STATION 3+50
Geote~hnleal Engineering ~ CanMruclion Mefenel$ Te$fmg 7~ J~nvironmenlel Engmoering /.~ Consulring
ALPHA TESTING. INC,
REPORT OF FIELD
COMPACTION TESTS
220~ Wisconsin S~,. Sure 100
TES~D F~: WPC 2004 COPPELL, L,P.
CiO DOWDEY, ANDERSON & ASSOCIATES
P~NO, TEXAS
DATE: 06119105
PROJECT:
VILLAS AT LAKE VISTA PHASE ONE
COPPELL, TEXAS
OUR REPORT NO.: 05152-4A
TEST DATA;
26 06118105 FG-4,5 0477314 23.5 90,5 26.8 95 08 t-A
29 06/18105 FG-4.O 0477314 23.5 96;~ 27.0 96 100 I~A
30 ~6/18105 FO-3.5 0477314 23.5 665 25.6 94 97 1-A
31 06/18105 FO-3.0 0477~/4 23.5 96.5 ,2..5:6 94 98 1-A
32 061191D5 FG-2.5 0477314 23,5 96.5 24.4 93 66 1-A
33 06/18105 FO-2,0 O4773/4 23.5 96.5 25,1 92 95 1-A
~4 00118105 FG-1.5 0477314 23.5 96.5 25.4 03 96 1-A
TEST LOCATION: UTILITIES
26 WATER LINE ALONG SANITARY SEWER ~INE D, AT PAVING STATION 0+50
29 NATER LINE ALONG ,SANITARY SEWER LINE D AT PAVING STATION 0+50
30 WATER LINE ALONG SANITARY SEWER LINE, .OAT PAVING STATION 0*50
31 ,W,A~ER LINE ALONG SANITARYSEWER LINE D AT PAVING STATION 0+50
32 WATER LINE ALONG SANITARY SEWER LINE O AT PAVING, STATION 0+50
33 WATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION 0+50
~.4 WATER LINE ALONG SANITARY SEWER LINE O AT PAVING STATION 0+50
ALPHA TESTING, INC.
TESTED FOR:
WPC 20~1COPPELL, L.P.
CIO DOWDEY, ANDERSON & ASSOCIATES
~'LANO, TEXAS
REPORT OF FIELD
COMPACTION TESTS
DATE: 06118105
PROJECT:
VILLAS AT LAKE VISTA PHASE ONE
COPPELL TEXAS
OUR REPORT NO: 05152-48
TEST DATA:
35 06/18/05 , FG. T1.0 04773/4 23,5 g6.$ 24,1 94 08 1-A
38 06/15105 FG-0.5 04773/4 23.5 96.5 24,9 95 99 1-A
37 08/18105 FG 04773/4 23.5 96.5 25.5 93 87 I-A
38 06/15105 FG*4.5 D4,773/4 23.5 9~,5 24.3 93 06 1-A
39 06118105 FG-4,0 0477.3/4, 23.5 965 27.1 93 97 1-A
40 05115/D5 FG-3.5 0477314 23,8 96.5 26.2 62 95 , ~,-A
41 08118105 FG-3.0 04773/4 235 96.5 273 9,2 ._ 96 1-A
TEST LOCATION: UTILITIES
.3_5 WATER LINE ALONG SANITARY SEWER ,I:.!NE D AT PAVING STATION 0+80
35 WATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION
37 WATER LINE ALONG SANITARY ,SEWER LINE D AT PAVING STATION 0+50
.3~1 /VATER LINE ALONG SANITARy,SEWER LINE D AT PAVING STATION 3+50
39 WATER LINE ALONG SANITARY SEWER LINE O AT PAVING STATION 3+50
4.0 ,,WATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION 3+50
41 WATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION 3+50
1, I~lg[. * A, IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WiTt-I SPECIFICATIONS
· eol~ahn~cal Enginee~ng /a Construction M~lenal~ Te~ting ~o Environmental E~ginee~ng ,~ Conzulting
ALPHA ESTING, INC.
REPORT OF FIELD
COMPACTION TESTS
2,200 Wlscomln St., Suite 100
Do#a~ Texas 7,~.929
972/620~t! . 972/2~7 (Me~)
FOR: WPC 2004 COPPELL,
CIO DOWDEY, ANOERSON & ASSOCIATES
P~NO, TE~S
DATE: 06115105
PROJECT:
VILLAS AT LAKE VISTA PHASE ONE
COPPELL, TEXAS
OUR REPORT NO.: 05152-.4C
TEST DATA:
42 ,06/18/05 FG.2.5 04773/4 23,6 965 25.3 95
43 06/18/05 FG-20 04773/4 23.5 g6.5 24.6 68 100 1-A
44 06/18/05 FG-1 5 0477,3/4 23,5 96.5 24.7 94 97 1-A
45 g6/1B/05 FG-1.0 04773/4 23.5 96.5 26.8 94 98 1-A
46 06118105 FG-D. 5 0~77314 23.5 96.5 270 93 96 1-A
47 (~115105 FG 04773/4 23.5 98.5 25.1 93 I)6 1-A
TEST LOCATION: UTILITIES
42 ~/ATER LINE ALONG SANITARY SEWER LINE O AT PAVING STATION 3+50
4,:3 ~/ATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION 3+50
44 NATER LINE ALONG SANITARY SE.W. ER LINE D AT PAVING STATION 3+50
45 ~WATER LINE ALONG SANITARy SEWER LINE D AT PAVING STATION
46 WATER LINE ALONG SANITARY SEWER LINE DAT PAVING STATION 3*50
47 WATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION 3+50
Geolechnlcel Engineering/6 Construction Meter;el= Tes#ng ~ Envimnmenfel Engineering ~ Con.sul(ing