Loading...
Villas at LV-LR050618ALPHA TESTING, INC. REPORT OF FIELD COMPACTION TESTS 220~ W~scon~/n St., Su/te I~ ~72/~11 - 972/2~9~7 ~/~'~ I1 Illl TE~ED FOR: WPC 20~ COPPELL, L,P, CIO ~WDEY, ANDERSON & DATE: 06H~/05 PROJECT: ~LLASATLAKEVISTA PHASE ONE COPPELL, TEXA$ OUR REPORT NO,: 05152-4 TEST DATA: i~- NO. rlATE NUMbeR ~ PCP ~ pcs 21 06/16/05 FG-3.0 0477314 23.5 96.5 24.4 04 ;)B 1-A 22 08/18/05 FG-2.5 0477314 23.5 96,6 26,6 92 95 I-A 23 06/16/05 FG-2.0 0477314 23.5 96,5 26,7 92 96 1-A 24 06/16/05 FG,.1.5 04773/4 23,8 9(~.5 24.8 94 96 1-A 25 06/18/05 FG-1.0 04773/4 23,5 96.5 27.3 94 97 1-A 26 06/16/05 FG~O.$ 0477314 23.5 96.5 26.8 93 97 I*A 27 0B118tq5 FG 0477314 235 96.~; 25,0 95 99 1-A TEST LOCATION: UTILITIES 21 SANITARY SEWER LINE O AT PAVING $TATION 3+50 22 SANITARY SEWER LINE D AT PAVING STATION 3+50 23 SANITARY SEWER L!NE D AT PAVING STATION 3+50 24 SANITARY SEWER LINE D AT PAVING STATION 3+50 25 SANITARY sEW.E,R., LINE D AT PAVIMG STATION 3+50 26 SANITARY SEWER LINE D AT PAVING STATION 3+50 27 SANITARY,SEWER LINE D AT PAVING STATION 3+50 Geote~hnleal Engineering ~ CanMruclion Mefenel$ Te$fmg 7~ J~nvironmenlel Engmoering /.~ Consulring ALPHA TESTING. INC, REPORT OF FIELD COMPACTION TESTS 220~ Wisconsin S~,. Sure 100 TES~D F~: WPC 2004 COPPELL, L,P. CiO DOWDEY, ANDERSON & ASSOCIATES P~NO, TEXAS DATE: 06119105 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 05152-4A TEST DATA; 26 06118105 FG-4,5 0477314 23.5 90,5 26.8 95 08 t-A 29 06/18105 FG-4.O 0477314 23.5 96;~ 27.0 96 100 I~A 30 ~6/18105 FO-3.5 0477314 23.5 665 25.6 94 97 1-A 31 06/18105 FO-3.0 0477~/4 23.5 96.5 ,2..5:6 94 98 1-A 32 061191D5 FG-2.5 0477314 23,5 96.5 24.4 93 66 1-A 33 06/18105 FO-2,0 O4773/4 23.5 96.5 25,1 92 95 1-A ~4 00118105 FG-1.5 0477314 23.5 96.5 25.4 03 96 1-A TEST LOCATION: UTILITIES 26 WATER LINE ALONG SANITARY SEWER ~INE D, AT PAVING STATION 0+50 29 NATER LINE ALONG ,SANITARY SEWER LINE D AT PAVING STATION 0+50 30 WATER LINE ALONG SANITARY SEWER LINE, .OAT PAVING STATION 0*50 31 ,W,A~ER LINE ALONG SANITARYSEWER LINE D AT PAVING STATION 0+50 32 WATER LINE ALONG SANITARY SEWER LINE O AT PAVING, STATION 0+50 33 WATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION 0+50 ~.4 WATER LINE ALONG SANITARY SEWER LINE O AT PAVING STATION 0+50 ALPHA TESTING, INC. TESTED FOR: WPC 20~1COPPELL, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES ~'LANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 06118105 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL TEXAS OUR REPORT NO: 05152-48 TEST DATA: 35 06/18/05 , FG. T1.0 04773/4 23,5 g6.$ 24,1 94 08 1-A 38 06/15105 FG-0.5 04773/4 23.5 96.5 24,9 95 99 1-A 37 08/18105 FG 04773/4 23.5 96.5 25.5 93 87 I-A 38 06/15105 FG*4.5 D4,773/4 23.5 9~,5 24.3 93 06 1-A 39 06118105 FG-4,0 0477.3/4, 23.5 965 27.1 93 97 1-A 40 05115/D5 FG-3.5 0477314 23,8 96.5 26.2 62 95 , ~,-A 41 08118105 FG-3.0 04773/4 235 96.5 273 9,2 ._ 96 1-A TEST LOCATION: UTILITIES .3_5 WATER LINE ALONG SANITARY SEWER ,I:.!NE D AT PAVING STATION 0+80 35 WATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION 37 WATER LINE ALONG SANITARY ,SEWER LINE D AT PAVING STATION 0+50 .3~1 /VATER LINE ALONG SANITARy,SEWER LINE D AT PAVING STATION 3+50 39 WATER LINE ALONG SANITARY SEWER LINE O AT PAVING STATION 3+50 4.0 ,,WATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION 3+50 41 WATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION 3+50 1, I~lg[. * A, IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WiTt-I SPECIFICATIONS · eol~ahn~cal Enginee~ng /a Construction M~lenal~ Te~ting ~o Environmental E~ginee~ng ,~ Conzulting ALPHA ESTING, INC. REPORT OF FIELD COMPACTION TESTS 2,200 Wlscomln St., Suite 100 Do#a~ Texas 7,~.929 972/620~t! . 972/2~7 (Me~) FOR: WPC 2004 COPPELL, CIO DOWDEY, ANOERSON & ASSOCIATES P~NO, TE~S DATE: 06115105 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 05152-.4C TEST DATA: 42 ,06/18/05 FG.2.5 04773/4 23,6 965 25.3 95 43 06/18/05 FG-20 04773/4 23.5 g6.5 24.6 68 100 1-A 44 06/18/05 FG-1 5 0477,3/4 23,5 96.5 24.7 94 97 1-A 45 g6/1B/05 FG-1.0 04773/4 23.5 96.5 26.8 94 98 1-A 46 06118105 FG-D. 5 0~77314 23.5 96.5 270 93 96 1-A 47 (~115105 FG 04773/4 23.5 98.5 25.1 93 I)6 1-A TEST LOCATION: UTILITIES 42 ~/ATER LINE ALONG SANITARY SEWER LINE O AT PAVING STATION 3+50 4,:3 ~/ATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION 3+50 44 NATER LINE ALONG SANITARY SE.W. ER LINE D AT PAVING STATION 3+50 45 ~WATER LINE ALONG SANITARy SEWER LINE D AT PAVING STATION 46 WATER LINE ALONG SANITARY SEWER LINE DAT PAVING STATION 3*50 47 WATER LINE ALONG SANITARY SEWER LINE D AT PAVING STATION 3+50 Geolechnlcel Engineering/6 Construction Meter;el= Tes#ng ~ Envimnmenfel Engineering ~ Con.sul(ing