Loading...
Lam Lee-CS000119 214 ~Oa 01/19/00 15:0B CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO.??~ ~01 DEVELOPMENT FEES PROJECT NAME: IENGINEER: ~REVlSION DATE: SENT 3/9/1999 3/9/1999 3/9/1999 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone 4 Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/trrig) Utility Final Inspection TOTALS Lam Lee Addition No. 1 Pacheco Koch Consulting Engineers, Inc. 1/19/2000 ASSESSED FEE AMOUNT PAID DATE $8,325.00 $3,600.00 $8,32500 5/11/99 $3,600.00 5/11/99 notify street dept. $66,398.00 $66,398.00 5/11/99 $200.00 $50.00 $192.15 $5,956.65 $35.00 $90.00 $50,00 TotalFees $84,896,80 $200.00 1/19/00 $50.00 1/19/00 $192.15 1/19/00 $5,956,65 1/19/00 $35.00 1/19/00 $9000 1/19/00 $50.00 1/19/00 Fees Paid Amount Owed $84,89680 $0.00 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irri~atlon Plan Recd. Prior To Final Acceptance As Built Plan Recd, Paving Bond Recd. Utilities Bond Recd. Irrigation I~lar} ApproveO Erosion Control Maint. 214 304 35?0 01/19/00 13:55 CITY OF COPPELL ENGINEERING -~ CITY OF COPPELL NO.??i PROJECT: ~ ~ A~ No. I ~ ~ ' -~ --~:' " OATE: 3191~ Water Impact Fee: Domestic Meter(s): Irrigauon Meter(s): Flreline Meter(s): _ I - 2 inch = 8 ESU's 1 o 2 inch .., 0 ' 8 -- ESU's _ ~ -- 0 ESU's __ 2 - ~ inch - -- 2.5 --ESU'a Total#: 18.S ESu's~$450.00ea. (10~ue prior to Council approval of the final P/at) Water Tap Inspection Fee: Total ii: 4 Connections family Clue I~ri~ to issuance of building pe~nit) other developments clue prier to issuance of meter) Dom~iie Water Meter Fee: To~al #: 1 Domestic Meter(s) ~family clue $192.15 prior to issuance of bu~ing ~rmit) (A]I other cleveloPments Clue prior to issuance of meter) IrrigatiooJFireline Water Meter Fee: Total #: 1 Irrigation Meter(s) ~ Total #: ~ AdClitional Irrigation Meter(s) Total #: ~ Fireline Met ~ue prior to i:eur(Sa: )ce@of Water meters) Dome. sUe Water Meter Deposit Fee: Total #: 1 Meter(s) ~ $35.00 aa. ~ua pri~. to issuance of wate~ metes) Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) ~!0. . ~ ~ OOea (1 uo '~, due prior to iSSuance of water meters) Wastewater Impact Fee: Total Domestic Maters ESU's:__ 8 Wastewater Tap laspectJon Fee: @ ~4~0.00 ea. S192.15 Total #: . 1 Connections ~ $50.00 ea. · ( 100% clue Prior to issuance of building permit) UfiUty Final Inspection Fee (All developments): Total #: I Lots ~ $50.00 ea. (~oo~, aue prior to issuance of bui/dlng perm/t) _ $8,325.00 _ ~200.00 _ $192,15 _ $1~.15 Page 1 'I~'AL: ~ (o5-'/5. ~0 01×19×00 1J:56 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO.771 ~02 BUILDING PERMIT APPLICATION Print or Type in a Clear, Legible Manner Lot: ~; ~ Block: Suhdi~Jsinn: Phase or Secti.n Number: I~' ,? i: ,,,, ,, D~cripibn of Work lo ~ Done Class of ~ork: ~ew ~ Addition ~ ANerali~n ~ Repair ~ Demotitioe Area Of ~uilding in Square Feet Ficst FI~ - Garage Se~nd Floor Other NOTICE Value of Work Io be Performed GRAY AREA FOR OFFICE USE ONLY Receipt Number: Occupancy Cfassi~cafion: Date: BUILDING INSPECTION - WHITE, APPRAISAL -YELl.OW, CUSTOMER . PINK