Lam Lee-CS000119 214 ~Oa
01/19/00 15:0B CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO.??~ ~01
DEVELOPMENT FEES
PROJECT NAME:
IENGINEER:
~REVlSION DATE:
SENT
3/9/1999
3/9/1999
3/9/1999
ASSESSMENT
Park Fee
Water Impact Fee
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection
Roadway Impact-Zone 4
Street Cut Permit
Overtime Inspection
Water Tap Inspection
Wastewater Tap Inspection
Water Meter (Domestic)
Water Meter (Fire/Irrig)
Meter Deposit (Domestic)
Meter Deposit (Fire/trrig)
Utility Final Inspection
TOTALS
Lam Lee Addition No. 1
Pacheco Koch Consulting Engineers, Inc.
1/19/2000
ASSESSED FEE
AMOUNT PAID DATE
$8,325.00
$3,600.00
$8,32500 5/11/99
$3,600.00 5/11/99
notify street dept.
$66,398.00 $66,398.00 5/11/99
$200.00
$50.00
$192.15
$5,956.65
$35.00
$90.00
$50,00
TotalFees
$84,896,80
$200.00 1/19/00
$50.00 1/19/00
$192.15 1/19/00
$5,956,65 1/19/00
$35.00 1/19/00
$9000 1/19/00
$50.00 1/19/00
Fees Paid Amount Owed
$84,89680 $0.00
NOTES
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Irri~atlon Plan Recd.
Prior To Final Acceptance
As Built Plan Recd,
Paving Bond Recd.
Utilities Bond Recd.
Irrigation I~lar} ApproveO
Erosion Control Maint.
214 304 35?0
01/19/00 13:55 CITY OF COPPELL ENGINEERING -~ CITY OF COPPELL NO.??i
PROJECT: ~ ~ A~ No. I ~ ~ ' -~ --~:' "
OATE: 3191~
Water Impact Fee:
Domestic Meter(s):
Irrigauon Meter(s):
Flreline Meter(s):
_ I - 2 inch
= 8 ESU's
1 o 2 inch
.., 0 ' 8 -- ESU's
_ ~ -- 0 ESU's
__ 2 - ~ inch - -- 2.5 --ESU'a
Total#: 18.S ESu's~$450.00ea.
(10~ue prior to Council approval of the final P/at)
Water Tap Inspection Fee:
Total ii: 4 Connections
family Clue I~ri~ to issuance of building pe~nit)
other developments clue prier to issuance of meter)
Dom~iie Water Meter Fee:
To~al #: 1 Domestic Meter(s)
~family clue $192.15
prior to issuance of bu~ing ~rmit)
(A]I other cleveloPments Clue prior to issuance of meter)
IrrigatiooJFireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) ~
Total #: ~ AdClitional Irrigation Meter(s)
Total #: ~ Fireline Met
~ue prior to i:eur(Sa: )ce@of Water meters)
Dome. sUe Water Meter Deposit Fee:
Total #: 1 Meter(s) ~ $35.00 aa.
~ua pri~. to issuance of wate~ metes)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) ~!0. .
~ ~ OOea
(1 uo '~, due prior to iSSuance of water meters)
Wastewater Impact Fee:
Total Domestic Maters ESU's:__ 8
Wastewater Tap laspectJon Fee:
@ ~4~0.00 ea.
S192.15
Total #: . 1 Connections ~ $50.00 ea. ·
( 100% clue Prior to issuance of building permit)
UfiUty Final Inspection Fee (All developments):
Total #: I Lots ~ $50.00 ea.
(~oo~, aue prior to issuance of bui/dlng perm/t)
_ $8,325.00
_ ~200.00
_ $192,15
_ $1~.15
Page 1 'I~'AL: ~ (o5-'/5. ~0
01×19×00 1J:56 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL NO.771 ~02
BUILDING PERMIT APPLICATION
Print or Type in a Clear, Legible Manner
Lot: ~; ~ Block:
Suhdi~Jsinn:
Phase or Secti.n Number:
I~' ,? i: ,,,, ,,
D~cripibn of Work lo ~ Done Class of ~ork: ~ew ~ Addition ~ ANerali~n ~ Repair ~ Demotitioe
Area Of ~uilding in Square Feet
Ficst FI~ -
Garage
Se~nd Floor
Other
NOTICE
Value of Work
Io be Performed
GRAY AREA FOR OFFICE USE ONLY
Receipt Number:
Occupancy Cfassi~cafion:
Date:
BUILDING INSPECTION - WHITE, APPRAISAL -YELl.OW, CUSTOMER . PINK