Villas at LV-LR050405ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 ~zll~, Texas 75229 972/620-8911 - 972/263-4~37 (Metro) FAX: ~72/406-8023 TESTED FOR: HAWKINS-WELWOOD HOMES, LP C/O DOWDEY, ANDERSON AND ASSOCIATES PLANO, TEXAS PROJECT: VILLAS AT LAKE VISTA PHASE I COPPELL, TEXAS IN-SlTU SWELL POTENTIAL DATE: 04/05/05 OUR REPORT NO.: 04773-83 TEST METHOD: ASTM D 4546 METHOD B TEST DATE SAMPLE MATERIAL INITIAL FINAL HAND DRY UNIT TOTAL NO. SAMPLED LOCATION DESCRIPTION PERCENT PERCENT PENETRO- WEIGHT PERCENT MOISTURE MOISTURE METER (~CF) SWELL QC-42 04/05/05 BLOCK B PAD 19 (FG-1.0') DARK BROWN CLAY 30.8 31.0 1.25 90.9 0.36% QC-43 04/05/05 BLOCK B PAD 4 (FG-I.0') DARK BROWN CLAY 29.8 30.3 1.25 90.9 0.47% QC-44 04/05/05 BLOCK B PAD 5 (FG-I.0') DARK BROWN CLAY 30.9 31.6 1.25 91.1 0.41% QC-45 04/05/05 BLOCK B PAD 3 (FG-1.0') DARK BROWN CLAY 30.3 30.7 1.50 93.0 0.52% QC-46 04/05/05 BLOCK B PAD 1 (FG-4.0') DARK BROWN CLAY 30.4 30.8 1.25 91.4 0.31% SPECIFICATIONS: MAXIMUM SWELL OF 1% OR LESS NOTES: Respectfully Submitted, CHARLES WILLIAMS ALPHA TESTING, INC. Geotechnical Engineering /,~ Construction Materials Testing /,! Environmental Engineering /~ Consulting ALPHA TESTING, INC. 2209 Wiscon~n St., Su~te ~:~las, Texas 75229 972/620-8911 - 972/263.4'37 (Metro) FAX: 972(406-8023 TESTED FOR: HAWKINS -WELWOOD HOMES, L.P. DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 04/05/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE (MASS GRADING ONLY) COPPELL, TEXAS OUR REPORT NO.: 04773-92 TEST DATA: TEST DATE __~ ELEV SOIL ID o~n~uu M~tlMUM L~B IN ~ IN PLACE PE~CE~T COMMENT' ' MO~TURE ~ ~ MOISTURE DRY DEN81~ COMPACTION NO.DEFTH ~ NUMBER % PCF % I:'CF 949 04105105 FG-0.5 2 21.0 103 21.3 104 100 1-A 950 04/05105 FG 2 21.0 103 22.1 101 98 1-A 951 04105/05 FG-O.5 2 21.0 103 21.0 100 97 1-A 952 04/05105 FG 2 21.0 103 21.7 101 98 1 -A 953 04/05/05 FG-0.5 2 21.0 103 22.3 100 97 1-A 954 04/05/05 FG 2 21.0 103 21.9 102 99 1-A 955 04/05/05 FG-0.5 2 21.0 103 21.0 103 100 1-A TEST LOCATION: BUILDING PAD 949 ~0' N AND 20' E FROM THE SW CORNER OF BLOCK D~ PAD 1 950 20' N AND 20' E FROM THE SW CORNER OF BLOCK D, PAD 1 951 20' N AND 20' E FROM THE SW CORNER OF BLOCK D, PAD 2 952 20' N AND 20' E FROM THE SW CORNER OF BLOCK D, PAD 2 953 20' N AND 20' E FROM THE SW CORNER OF BLOCK D~ PAD 3 954 20' N AND 20' E FROM THE SW CORNER OF BLOCK D, PAD 3 955 20' N AND 20' E FROM THE SW CORNER OF BLOCK D, PAD 4 1 FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED · A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECiFICATiONS B PERCENT COMPACTION [X~S NOT COMPLY WITH SPECIFICATIONS C PERCENT IN P[.ACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST Respect~JIl¥ Submitted, CHARLES WILLIAMS ALPHA TESTING, INC Geotechnical Engineering /~ Construction Materials Testing/~ Environmental Engineering/~ Consulting ALPHA TESTING, INC. REPORT OF FIELD COMPACTION TESTS 2209 Wisconsin St., Suite Do#os, Texas 75229 972/620-8911 - 972/263~37 (Metro) FAX: 972~406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, UP. DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS DATE: 04/05/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE (MASS GRADING ONLY) COPPELL, TEXAS OUR REPORT NO.: 04773-92A TEST DATA: TEST DATE ~ELEV SOIL ID O;mUUU MAXJMUM LAB IN PLACE IN ~ PERCENT MO~TURE DRY (~"N~ITY MOIS"PJRE DRY DENSI'P( COMMENT* NO.DEFrrH~ NUMBER % ~cF % ;,CF COMPACnOr~ 956 04/05/05 FG 2 21.0 103 22.1 101 98 I-A 957 04/05/05 FG-0.5 2 21.0 103 21.8 102 99 I-A 958 04/05105 FG 2 21,0 103 23.9 100 97 1-A TEST LOCATION: BUILDING PAD 956 20' N AND 20' E FROM THE SW CORNER OF BLOCK D, PAD 4 957 20' N AND 20' E FROM THE SW CORNER OF BLOCK D~ PAD 5 958 20' N AND 20' E FROM THE SW CORNER OF BLOCK D, PAD 5 I FILL ° A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3 LIME STAI~ILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4 CEMENTTREATED D. RETEST ALPHA TESTING, INC Geotechnical Engineering ~ Construction Materials Testing /~ Environmental Engineering /~ Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 DolIOS, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 04/05105 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-88 TEST DATA: TEST ~ELEV SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATEDEPTH ~,,h NUMBER MOISTURE% DRY PcFIDENSI~ MOISTURE% DRY PcFDENSITY COMPACTION COMMENT* 899 04/05/05 FG-0.5 4 23.5 96.5 24.4 94 97 1-A 900 04~05~05 FG 4 23.5 96.5 24.1 94 98 1-A 901 04/05/05 FG-0.5 4 23.5 96.5 23.5 97 100 1-A 902 04/05~05 FG 4 23.5 96.5 25.3 93 96 1-A 903 04/05/05 FG-0.5 4 23.5 96.5 24.9 95 98 1-A 904 04/05/05 FG 4 23.5 96.5 25.9 92 96 1-A 905 04/05/05 FG-05 4 23.5 96.5 26.7 92 95 1-A TEST LOCATION: BUILDING PAD 899 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 2 900 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 2 901 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 3 902 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 3 903 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 4 904 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 4 905 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 5 FILL NATURALSUBGRADE LIME STABILIZED CEMENTTREATED *A INPLACEPERCENTMOISTUREANDPERCENTCOMPACTIONCOMPLYWITHSPECIFICATIONS S PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT iN PLACE MOISTURE DOES NOT COMPLY W~TH SPECIFICATIONS D RETEST Respectfully Submitted, CHARLES WILLIAMS ALPHA TESTING, INC. Our test results and reports are for the exclusive use of the Cl~enl (and their designated recJpie[~s on file in our off, ce) and sharl ~lot be reproduced and/or distnbuted except With express app¢oval of ALPHA Theuseofournameandtestresutlsmustrecelveourwril~enapproval Testresu~tsandrep~rtsappty~n¥t~thesamp~estestedand/~r~bser~edandaren~tindicative~fthequa~lties~f apparently identiCal or sit,Jla r specimens Geotechnical Engineering / Construction Materials Testing I Environmental Engineering /;- Consulting ALPHA TESTING, INC. 3209 Wisconsin St., Suite 100 Dollos, Texas 75229 972/620-8911 - 972/263-4¢37 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 04/05/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-88A TEST DATA: TEST ~ELEV SOIL ID CPTIMUM MAXIMUM ~ IN PLACE IN PLACE PERCENT NO. DATEDEPTH~ MOISTURE DRY DENSITY MOISTURE DRY DENSI~' COMMENT* NUMBER % PCF % PCF COMPACTION 906 04/05/05 FG 4 23.5 96.5 24.9 94 98 1-A 907 04/05/05 FG-0.5 4 23.5 96.5 26.3 92 95 1-A 908 04/05/05 FG 4 23.5 96.5 24.3 94 97 1-A 909 04/05105 FG-0.5 4 23.5 96.5 25.7 93 97 1-A 910 04/05~05 FG 4 23.5 96.5 26.7 92 95 1-A 911 04/05/05 FG-0.5 4 23.5 96.5 24.2 94 98 1-A 912 04/05/05 FG 4 23.5 96.5 25.6 93 96 1-A TEST LOCATION: BUILDING PAD 906 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 5 907 Z0' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 6 908 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 6 909 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 7 910 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 7 911 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 8 912 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 8 I FILL 2. NATURAL SUBGRADE 3 LIME STABILIZED 4. CEMENT TREATED *A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST Respectfully Subm~ted, CHARLES WILLIAMS ALPHA TESTING, INC Geotechnical Engineering I; Construction Materials Testing f? Environmental Engineering /.'~ Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dollos, Texos 7522~ 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, LP, CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 04/05/05 PROJECT: VILIAS ATIAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-88B TEST DATA: TEST DATE DE~ SOIL ID OP'nMUM MAXIMUM LAB iN PLACE IN PLACE ' MOISTURE DRY DENSITY MOISTURE DRY DENSITY PERCENT NO, NUMBER % I=CF % PCF COMPACTION COMMENT* 913 04/05~05 FG-0.5 4 23.5 96.5 24.2 95 98 1-A 914 04/05/05 FG 4 23.5 96.5 26.0 93 97 1-A 915 04/05/05 FG-0.5 4 23.5 96.5 24.1 94 97 1-A 916 04/05105 FG 4 23.5 96.5 24.6 96 99 1-A 917 04/05/05 FG-0.5 2 21.0 103 23.4 99 96 1-A 918 04/05/05 FG 2 21.0 103 23.5 98 95 1-A TEST LOCATION: BUILDING PAD 913 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 9 914 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 9 915 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 10 916 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 10 917 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 21 918 20' N AND 30' E FROM THE SW CORNER OF BLOCK A, PAD 21 FILL NATURALSUBGRADE LIME STABILIZED CEMENTTREATED B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST · A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS Respectfully SubmRled, CHARLES WILLIAMS ALPHA TESTING, INC. Our test results and reports are for the e xc~usive use of the Crient (and their designated recipients on file in our office) and sha~l not be reproduced and/or distributed except ~th express approval of ALPHA The use el our name and [est results must receive our written approval Test results and reporis apply on~y to the samples tested ancO/or observed and are riot indicative of the qual~JeS of Geotechn/cal Engineering /. Construction Materials Testing /. Environmental Engineering /~ Consulting