Loading...
Lam Lee-CS00092209×26×00 15:51 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.702 . COPPELL, TEXAS 75019 , RO, Box 478 CoDI~eII, Texas 75019 972-462~022 September 22, 2000 Scott & Reid Dan Lenox 12221 Merit Dr., 8250 Dallas, Texas 75251 RE: Lam Lee Final Acceptance Dear Mr. Lenox: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maiutenance bonds and as-built drawings have been receiv~ from the contractor. Maturity on the bonds will be two year~ from the date of this leller. Maturity on the Erosion Control Bond will also be two years from the d~t_e of this leUer. Sincerely, Cons/~uca~ CC: Chris Jones, P.E., Pacbeco Koch (fax 972-235-9544) Charles Hall, Pucheco Koch (fax 972-235-9544) Matt Petty, Blue Ridge Const. (fax 972-582-5180) Mike Martin, Assistant City Engineer Debi Ingrarn, Engineering Secretary Glenn Hollowe/], Director of Public Works Greg Jones, Chief Building Official Travis Cramp, Fire Marshal