Lam Lee-CS00092209×26×00 15:51 CITY OF COPPELL ENGINEERING ~ CITY OF COPPELL N0.702
. COPPELL, TEXAS 75019 ,
RO, Box 478
CoDI~eII, Texas 75019
972-462~022
September 22, 2000
Scott & Reid
Dan Lenox
12221 Merit Dr., 8250
Dallas, Texas 75251
RE: Lam Lee
Final Acceptance
Dear Mr. Lenox:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maiutenance bonds and as-built drawings have been receiv~ from the contractor.
Maturity on the bonds will be two year~ from the date of this leller. Maturity on the Erosion
Control Bond will also be two years from the d~t_e of this leUer.
Sincerely,
Cons/~uca~
CC:
Chris Jones, P.E., Pacbeco Koch (fax 972-235-9544)
Charles Hall, Pucheco Koch (fax 972-235-9544)
Matt Petty, Blue Ridge Const. (fax 972-582-5180)
Mike Martin, Assistant City Engineer
Debi Ingrarn, Engineering Secretary
Glenn Hollowe/], Director of Public Works
Greg Jones, Chief Building Official
Travis Cramp, Fire Marshal