Loading...
Villas at LV-LR05082285/13/2882 28:17 2812962298 ALPHA PAGE 82/83 ALPHA TESTING, INC. 2209 Wisconsin St, Suite 100 Dallas, Texas 75229 (972) 620-8911 Concrete Compression Test Report Vi/PC 2004 COPPELL, LP. % DOWDEY, ANDERSON & ASSOCIATES ATrN; RODNEY LOUVIERE 5225 VILLAGE CREEK DRIVE, SUITE :200 PIANO, TX ?SOg3 (214)520-0229 Our Repo~ Nod 05152-$? lieu® Data: 08/22/2005 VILLAS AT LAKE VISTA PliSSE ONE SE CORNER OF MAC, ARTHUR BLVD & LAKE VISTA DR FIELD DA TA * PM~M LeeMIm1: INLET WALLS. SNOWSHILL TRAIL ~ STATION ~ lelM:~l: 08~11A~S Plant Numl~r:. 131Ja.0 SK ~lumfl (A~I C-t4,1): 4.0 Made By: ALPHA ~',", Cured 8peclacaeon; AS]M C-~I Air TImEMIlum: .,~: . Dam ReeM~d: 08/t2/05 D~ MMI~M: PICKED UP BY ALPHA FiMd ~ Sale. Ileal By: RANJBARAN, JAMSHID Mb~ O~ll Su~nl~ed By: 'TXI CYLINDER COMPRESSION TEST RESULTS L~b Cum Cap Oat~ A~e Avg, AV~I, Av9 Dep~/ Ama: Max ~ ~B C-1231 0~1~08 ? 12 NIA 6 28,2T 140780 49~ ~6 LAB 09KI8/05 28 12 NIA G 282? 37 LAB 09/08/05 28 12 NIA 6 28,27' 38 LAB HOLD HOLD t2 NIA 6 28.27 Sl~elReatl~: Date: WPC 2004 COPPELL, LP., HAWKINS - WELWOOD HOMES, L.P., CITY OF COPPELL Req~-cfully 8ubmllled ay: /,-,/~ .~- 0f Alpha Testis, Inc. 05/14/2002 23:5i 2812962298 ALPHA PAGE 03/04 ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (97'2) 620-891 1 Concrete Compression Test Report 'Tested For: WPC 2004 COPPELL, LP, % DOWDEY, ANDERSON & AssoCIATES A'rTN: RODNE¥ LOUVIERE 5225 VILLAGE CREEK DRIVE, SUITE ~00 pIANO, TX 75093 Fax Number: (214) 520.0229 Our Report No.: 05152-28 Issue Date; 0012212005 project Deec: VILI.AS AT LAKE VISTA PHASE ONE SE CORNER OF MACARTHUR PtLVD & LAKE VISTA DR FIELD DA TA Placement Location: MANHOLE TOP, L}HE C ~ STATION 0+00 Date Placed: 06109105 Time Placed: 1:15 PM Slump (ASTM C-'143): Air Content'. N/A Air Temperature: Specimen Temperature: 87 Date Received: 08/1 Delivery Methocl: PICKED UP BY ALPHA Field cate SubmlEed ay: RANJBARAN, JAMSHID Mix Data Submitted By; TXI plant Number: 11.6.0 SK Deliver/Ticket Ho.: 97431 Mede By; ALPHA Cu~ed Spe;iflcatlom A~e;TM C.31 CYLINDER COMPRESSION TEST RESUL TS -~' Cure Cap Date Age Avg, Avg. Avg Depth/ Area; Max No,; Type: Spec: Teated: ~Oa¥s); Length Width Diameter Sq. ln. Load: PSI; 9 LAB C-1231 08/16/05 7 1~ N/A ~ 29 27 139760 4910 10 LAB 09106105 26 12 N/A 6 2827 0 11 LAS 09/06/05 28 12 N/A 6 2827 0 12 LAB HOLD HOLD 12 NIA 6 2827 0 - 3000 Resul~ to Date: CC: wPC :~004 COPPELL, LP HAWKINS - WELW00D HOMES, LP., CITY OF COPPELL Submitted By:.j~,.,~ ~"'"' of Alp he Testing, I~c. Geolech~lical EflgineeHng * Construction Materials Test~flg ~ EnvirOnmental Engineering * Consulting 4(~8~5 85/14/2002 23:51 2012962298 ALPHA PAGE 04/04 ALPHA TESTING, INC. 2209 Wisconsin St.. Suite 100 Dallas. Texas 7522g (972) 620-8911 Concrete Compression Test Report Tested For: WPC 2004 COPPELL, LP % DOWDEY, ANDERSON & ASSOCIATEE ATTN', RODNEY LOUVIERE ~225 VILLAGE CREEK DRIVE, SUITE 200 pIANO, TX 75093 Fax Number: (214) 520-0229 Our Report No,: 05152-33 Issue Date: 08122/2005 Prelect Oesc: VILLAS AT LAKE VISTA PHASE ONE SE CORNER OF MACARTHUR BLVO & LAKE VISTA OR 141-6 0 SK FIELD DATA ~ S TR~IL ~ $ Placement Location: INLE'r WALL, SNOWHILL TATION 7+92,§0 Date Placed: 08/10/05 plant Numbe¢: Time Placed: 3:00 PM Slump (ASTM C.143): 40 Ail Centerll: N/A Ai~ Temperature: 91 Specimen Tem~emture; 88 Date Received: 08111105 Delive~ I~eth(~d: P1CKED UP BY ALPHA Field Data Submitted By: RANJBARAN. JAMSHID Mix Data Submitted By: TXI CYLINDER COMPRESSION TEST RESULTS Delivery Ticket No.: 98324 Made By; ALPHA Cured Specification: ASTM C-31 Lab Cure Cap Date A~e Ava, Avg. Ava DelsIhl Area: Max Ne.: TyI~,: Spec: Tested: (Days): Length Width Diemete~ , Sq. ln, , Lead: , PSI: 23 LAB C-1231 08117~5 ? 12 NIA S 28.27 121820 4310 24 tJ~-$ 09/07/05 28 12 NIA 6 28,27 0 25 LAB 09/07IO5 28 12 N/A 5 28,27 0 25 I-~B HOLD HOLD 12 N/A 300(} CC; WPC 2004 COPPELL. LP, HAWKINS - WELWOOD NOMES, LP,, CITY OF COPPELL Respect'fully Submitled By:..~--~ ~ ~f Alpha 'resting, Inc Geotechnical Englnse~;nS ° Construction Materials Testln9 ' Envlrenmentel E~CJIn~arlng * GodsU~flng 4~890 ALPHA TESTING, INC. ~OIIOS. TeXOS 972/620-~)~ I - 972/263.4~37 [Me#o) TESTED FOR: WPC 200~ COPPELL~ L.P CIO DOWOEY, ANDERSON & ASSOCIATES P~NO, TE~S REPORT OF FIELD COMPACTION TESTS DATE: 08/22105 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO 05152-5 TEST DATA: 46 06122105 FG-4 5 4 23.5 96.5 24,6 94 98 1-A 49 06/22105 FG-.~.0 4 23,5 96.5 257 94 g? t-A 50 06/~2/05 FG-35 4 23.6 95.5 23. T 95 99 1-A 51 08/2~/05 FG.3 ~0 4 23.5 96.5 24.6 93 96 1.A 52 06/2~105 FG-2,5 4 23.5 96.5 25.0 94 97 1-A 53 06122/05 FG-2.0 4 23.,5 96.5 23.7 92 95 1-A 54 05/22/05 ;G-1.5 4 23.5 96.5 22,9 92 9~ 1-A TEST LOCATION: UTiLITiES 48 WATER LINE ALONG SANITARY SEWER LINE O AT STATION 3+50 49 WATER LINE ALONG SANITARY SEWER LINE O AT STATION 3*50 50 WATER LINE ALONG SANITARY SEWER LINE D AT STATION 3+5D 51 NATER LINE ALONG SANITARY SEWER L~NE D AT STATION 3+50 52 WATER LINE ALONG SANITARY SEWER LINE O AT STATION 53 WATER LINE ALONG SANITARY SEWER LINE [:) AT STATION 3*50 54 WATER LINE ALONG SANITARY SEWER LINE [3 AT STATION 3+50