'REPORT OF FIELD
COMPACTION TESTS
TESTED FOR:
WPC 2004 COPPELL. LP,
CIO DOWDEY, ANDERSON & ASSOCIA~S
PIANO, TEXAS
DATE: 08f20/0~t
PROJECT:
VILLAS AT LAKE VISTA PHASE oNE
COPPELL, TEXAS
OUR REPORT NO.: 05152-41
TEST DATE NUM6E~. I'~ '~ ~-~
NO,
476 08/2010G FG-2.0 04773/4 23.S 98.5 24,$ 94 98 1-A
477 0W20105 FQ-1,5 0477314 23.5 96.5 25.2 94 97 1-A
478 08/20105 FG-1.0 0477314 23.5 ~.5 24.2 94 98 1-A
479 ~8f20105 FG-2.0 0477314 23.5 96.5 , 25.5 92 95
490 0812,0105 FG-1.5 04773/4 23.5 96.5 25.4 93 96 1-A
481 08/20105 , FG-I.0 04773~4 23.5 96,5 23.7 92 95 1-A
482 08/20105 FG-2.0 0477314 23.5, 96,5 24,8 93 97 1-A
RANCHISE UTILITIES
476 GAS TEL, EpHONE AND m ~TRIC CROSSING FROM BLOCK C, PAD 5XTO BLOCKA, PAD 25
477 GAS, TELEPHONE AND ELECTRIC CROSSING FROM BLOCK C, PAD 5X TO BLOCK^, PAD 2,6 , ,
478 GA~ TELEPHONE AND ELECTRIC CROSSING FROM BLOCK C~ PAD 5X TO BLOCK A~ PAD 25
479 GAS CROSS NG FROM BLOCK C PAD 12 TO BLOCK C~ PAD 14
480 i~ CROSSING FROM BLOCK Ct PAD 12 TO BLOCK C, PA.D, ,,1,4
461 3AS CROSSING FROM BLOCK C, PAD 12 TO BLOCK C~ PAD 14
482 ELECTRIC AND GAS CROSSING FROM BLOCK S, PAD lX TO BLOCK A~ PAD 5X
Geotechnical Englhee~ing /& Constrvction Materials Te$ling ~' Envfl'onmetlfa! EflgiAeering ,.~i Consulting
05/i$/2002 02;07 20i296~290 ALPHA
ALPHA TESTINg, INC.
220~ V~con.~ln St., Su~ 7~
~ Te~ 7~
972/~11 ' ~7~37 (Me~)
TESTED FOR; WPC 2004 COPPELL, L.P.
CfO DOWDEY. ANDERSON ~ ASSOCIATES
P~NO. TE~S
REPORT OF FIELD
COMPACTION TESTS
DATE: 08/20105
PROJECT:
VILLAS AT LAKE ~S'T'A PHASE ONE
COPPELL, TEXAS
OUR REPORT NO.: 05152-41A
PAGE 10/11
TEST DATA:
483 0~120105 FG-I .$ 0477314 23.5 98.5 24.4 94 98 I..A
484 08/20105 FG-I.0 0477314 23,5 96.5 23,7 95 100 I-A
485 0~20/05 FG-2,0 ,0477314 23.5 96,$ 25.2 94 g7 1-~, .
486 08/20/05 FG-1,5 0477314 23,.5 96.5 25.8 92 96 1-A
48.7 08/20!.05 FG-1,0 04773/4 23,5 96.5 23.2 94 98 1-A
488 08/20/0~ FG-2,0 0477314 23.5 96.5 23.3 94 97 I-A
489 08/20105 FG-1,5 04773~4 23~5 96.5 24,6 95 , 9~ 1-A
TEST LOCATION: FRANCHISE UTILITIES
483 E,LECTRIC AND GAS CROSSING FROM,~LOCK B~ PAD lX TO BLOCK A~ PAD 5X
484 ELECTRIC AND GAS CROSSING FROM BLOCK B~ PAD lX TO BLOCK A~ PAD 5X
485 GAS CROSSING FROM BLOCK B. PAD 1570 BLOCKA, PAD 1
486 GAS CROSSING FROM BLOCK B. PAD 15 TO BLOCK Ar PAD 1
487 GAS CROSSING FROM BLOCK B. PAD 15 TO BLOCK Ar PAD 1 , ,
488 GAS CROSSING FROM BLOCK B, PAD 1 TO BLOCK A, PAD 10
469 IGA$ CROSSING FROM BLOCK B~ PAD 1 TO BLOCK A, PAD 10
· A IN PLAGE PERCENT MOIS'P~REAND PF. RCENTCOMPAC~ON COMPLY WITH SPECIFICATIONS
Geotechnicel Enginee~ng t~, Construction Ma($~al$ Testing ~)~ Environmental Engineering /J~ Consu/tin[7
85/16/2882 02:07 2812962298 ALPHA PAGE 11/11
ALPHA TESTING, INC.
220; W~scon$!n SL Suite 100
Oallo~, Texas 7,5229
~'~2/620.8~; l · ~72/263.4~37 (Metro)
FAX: 972/406-8023
TESTED FOR;
WPC 2004 COPPELL, L.P.
C/O DOWDEY, ANDERSON & ASSOCIATES
PLANO, TEXAS
PROJECT:
VILLAS AT I.~KE VISTA PHASE ONE
COPPELL, TEXAS
REPORT OF FIELD
COMPACTION TESTS
DATE: 08/20105
OUR REPORT NO.: 05152-41B
TEST DATA;
,,490 08/20/05 FG-I.0 0477314 23,5 96,$ 24,2 94 98 1-A
491 08/20/05 FG-2,0 0477314 235 96.5 24,$ , 96, , 99 1-~
492 08/20/05 FG-1 .$ .... 0477314 23.5 98.5 256 94 ,,, 98,, 1-A
493 08/20/05 FG-1,0 0477314 23.5 96,5 24,4 93 97 1-A
TEST LOCATION: FRANCHISE UTILITIES
490 3AS CROSS!NG FROM BLOCK B. PAD TO BLOCKA~ PAD 10
491 3AS~ ELECTRIC AND TELEPHONE CROSSING FROM BLOCK B, PAD 1 TO BLOCK A, PAD 12
492 3AS, ELECTRIC AND TELEPHONE CROSSING FROM BLOCK, B, PAD 1 TO BLOCK A, PAD 12
493 ;A$~ ELECTRIC AND TELEPHONE CROSSING FROM BLOCK B~ PAD 1 T0 B,L,0,C,,K, A, P_.A,,D 12,