Loading...
Villas at LV-LR05081885/14/2882 23:51 2812962298 ALPHA PAGE 82/84 ALPHA TESTING, INC. :2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 62.0-8911 Concrete Compression Test Report Tested For; WPC 20(~4 COPPELL, L,P % DDWDEY~ ANDERSON & ASSOCIATES AT'TN: RODNEY LOUVIERE 5225 V}LLAGE CREEK DRIVE, SUITE 200 pIANO, TX 75093 Fax Number: (214) 520-0229 Our Repo~ No.: 05152-27 Issue Date: OB)1812005 proJeat Des¢: VILLAS AT LAKE VISTA PHASE ONE SE CORNER OF M^CARTHUR BLVD & I_GKE VISTA OR placement Location; [}ate placed: Time Placed: Slump (ASTM Co143): Delivery Method: Field Oa~ Submit:ad By: Mix Data Submitted By; FIELD DATA INLET WALLS, LAKE VISTA PLACE @ STATION 4+00 Plant Number: 14,1.60 SK 06/05/05 Delivery Ticket No.: 9677~ 2!30 PM Made By: ALPHA 4,(} NIA Cured SpecifieaUon: ASTM C-31 90 06109/05 PICKED UP BY ALPHA RANJFJARAN, JAMSHID ~ CYLINDER COMPRESSION TEST RESULTS Lab Cate Age Avg. Avg. AyS Depth/ Area: qo.; Tested: (Oa~/s): Length Width Diameter Sq, ln. Load: PSI:, 5 08115/05 7 17. N/A 6 26.27 160620 5680 CC: Cure Cap Ty~e: Spec: LArt C.1231 LAS 09/05/05 28 12 N/A 6 28,27 0 7 LAB 09/05f05 28 12 N/A 6 28.?.7 0 LAB HOLD HOLD 12 Sp;clflcetlona: 26 Results* ~.o Data: N/A 6 2627 D WPC 200a COPPELL, L,P,, HAWKINS - WELWOOD HOMES. L P., CITY OF COPPELL Respecl~ully Submitted By: ~'~..,,~ ~ of Alpha TeSting. Inc, Geoteehnloel Engineering ' Construction Mal~rlale Testing ' I=nvlronmental Englnaaring ' Consulting 46835 05/87/2882 83:39 2812962298 ALPHA PAGE 03/89 ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas. Texas 75229 (972) 620-8911 Concrete Compression Test Report Tested For: WI~C 2004 COPPELL, LP % DOWOEY, ANDERSON & ASSOCIATES A'I-TN; RODNEY LOUVIERE 5225 VILLAGE CREEK DRIVE, SUITE 200 PLANe, TX 75093 Fax Numbel': (214) 520-02~.9 Our Report I~1o.: 0515P.-25 I~sue Date: 08/1SI2005 Project Oesc; VILLAS AT LAKE VISTA PHASE ONE SE CORNER OF MACARTHUR BL~./D & LAKE VISTA DR FIELD DA TA pla(;It~qent Locatioll; MANHOLE, LINE C I~ STATION Date Ple(;ed; 08105105 Time Placed: 3:15 PM Slump (A~TM C-143): 4 0 Air centent: N/A Air Temperature: 92 Specimen Tam peratur r~: 91 Dale Received; 0610610.5 DeliYer7 Method: PICKED UP BY ALPHA Field Data Submittt~d Ely: RANJBARAN, JAMSHID Mix Data SubmRted By; TXI Plant Number: 141-6,0 SK Dellveqt Ticket No.: 95151 Made By: ALPHA Cured Specification: ASTM C-31 CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Ave De~thl Area: Mag Ho,: Type: Spec: ,Tested: (Days): Lenglh Width Diameter Sq, In. Lead: LAB C-1231 08/1~/05 7 12 N/A 6 2827 133140 2 LAB 0§/02105 28 12 NIA 6 28.27 0 3 LAS 09/(]2105 28 12 NIA 6 25.27 0 4 LAG HOLD HOLD 12 NIA 6 25.27 0 4710 Speclticatlons.: ;z8 3000 Results to Date: N/A CC: WPC 2004 COPPELL. L.P., HAWKINS. WELWOOD HOMES, LP, CITY OF COPPELL Respectfully Subr~ltled Sy~4'~ ~ of'Alpha Testing, Inc, 05/07/2002 83:39 2812962298 ALPHA PAGE 08/09 ALPHA TESTING, INC. :~209 wisconsin St., Suite 100 Dallas. Texas 75229 (972) 620-8911 Concrete Compression Test Report Te.~ted For: WPC 2004 COPPELL, LP % DOWDEY. ANDERSON & ASSOCIATES Al-TN RODNEY LOUVIERE 8225 VILLAGE CREEK DRIVE, SUITE 200 PLANO, TX 75095 Fax Number: (21,3) 520.0229 project De,c: VIU-AS AT LAKE VISTA PHASE ONE SE CORNER OF MACARTHUR BLVD & LAKE VISTA OR FIELD DA TA Placement Location: Date Placed: Time Placed: Slump (ASTM C.143): Air Co~ent: Air Temperature: MANHOLE SANITARY SEWER LINE A @ STATION 1.40 05130/05 Plant Number; N/A N/A Delivery Ticket No.; N/A N/A Made By: CONTRACTOR NIA Cured Specification; ASTM C-31 N/A Specimen Temperature: N/A Date Received: 08/11/05 Delivery Me{hod: PICKED UP BY ALPHA Field Dab Submitted By: CONTRACTOR CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area: Max No,; T~ Spec: Testqd: (Days,): , L,en. gth Width Diameter Sq, In, Load: PSi: 27 LAIB C-123t 08/1~/05 43 12 NIA 6 282'/ 155770 5510 28 LAS C-1231 08/12/05 43 12 NIA 6 28,27 147180 5210 29 LAB C-1231 08/1:~105 43 12 N/A 6 28.27 145250 5'140 30 LAB HOLD HOLD 12 N/A $ 28.27 0 PA$$ CC; WPC 2004 COPPELL. LR., HAWKINS - WELWOOO HOMES. LP., CiTY OF COPPELL Respectfully Submitted By: ,,,,-'/'/'/'/"~,..,/~ E.--*"*"- of Alpha Tesling, inc. Geo~chnlcal Engineering * Construction Mate~ale Testing ' Environmental Engltteeril~g ' Consulting 45~91 85/07/2882 63:39 2B129G229B ALPHA P~GE 09/89 ALPHA TESTING, INC. 2209 Wisconsin St., Suite 1 00 Dallas, Texas 75229 (972) 620-891 1 Concrete Compression Test Report Tested For; WPC 2004 COPPELL L,P, % DOWDEY, ANDERSON & ASSOCIATES ATTN: RODNEY LOUVIERE 5225 VILLAGE CREEK DRIVE, SUfTE 200 PIANO, TX 75093 Fa~ Number= (214) 826-0229 Project Pes¢: VILLAS AT LAKE VISTA PHASE ONE SE CORNER OF MACARTHUR BLVD & LAKE VISTA DR Our Report No.', 05152-36 Iseue Date: 08/1 $/2005 ~ELD DATA Placement LOCation: MANHOLE, SANITARY SEWER LINE B ~ STATION 1.-90 23 Date Placed: 07101105 Time Placed: N/A Slump (A~TM C-~43): NIA Air Content: Air Temperature'. NIA ~pecimen Temperature: N/A Date Re~eived: 08/11/05 Delivery M~hod: PICKED UP BY ALPHA Field Data Submitted By: CONTRACTOR Mix Data Sol)miffed By; N/A Plant Number: N/A Delivery Ti;ket NO.: N/A Made Dy: CONTRACTOR Cored Specification: ASTM C-31 CYLINDER COMPRESSION TEST RESULTS Lab Cure Cap Date Age Avg. Avg. Avg Depth/ Area; Max No.; Type; , $~ec: Tested: [Days); Length Width Di&meter S(]. In~ Load: PSI: ~ LAB C-1231 05112105 42 12 N/A 6 28,27 165120 5840 32 LAS C-'1231 06112/05 4;~ 12 NIA 9 26.2;' 162860 5;'60 33 LAB C-1231 08112/05 42 12 N/A 6 28.27 166959 5910 34 LAB HOLD HOLD 12 NIA 6 26 27 0 R~sults to Date: PAss CC: WPC Z[~04 COPPELL, LP,. HAWKINS - WELWOOD HOMES. LP. C)TY OF COPPELL Respectfully Submitted By: ~.~.~ ~ of Alpha Testing, Inc Our test r~dls ami tep~lt~, ore tog tl3e exclusive une el Ihe Client (~nd Iheit de~ig~eted recepienla on roe in our o~ceI end ~11 not be reproduced ~nd/or dlRIH b~j!.~d Geate~h~tical Engineering ' Construction Materials Testing ' EnvirOilmental Engineering '; ~onsulttng 46892