Loading...
Villas at LV-LR050307ALPHA TESTINg, INC. 220~ Wisconsin St,, Suite 100 ~ll~Ts, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: PROJECT: HAWKINS-WELWOOD HOMES, LP CIO DOWDEY, ANDERSON AND ASSOCIATES PIANO, TEXAS VILLAS AT LAKE VISTA PHASE I COPPELL, TEXAS IN-SlTU SWELL POTENTIAL DATE: 03/07/05 OUR REPORT NO.: 04773-31 TEST METHOD: ASTM D 4546 METHOD B TEST DATE SAMPLE MATERIAL INrrlAL FINAL HAND DRY UNiT TOTAL NO. SAMPLED LOCATION DESCRIPTION PERCENT PERCENT PENETRO- ~NEIGHT PERCENT M(NSTURE MOISTURE METER (PCF) SWELL QC-~ 03/07/05 BLOCK A PAD 26 (FG-I.0') DARK BROWN CI~Y 26.7 27.1 1.25 95.2 0.23% QC-7 03/07/05 BLOCK A PAD 31 (FG-1.0') DARK BROWN CLAY 26.0 26.8 1.75 96.2 0.55% QC-8 03107105 BLOCK A PAD ~ (FG-4.0') DARK BROWN CLAY 27.4 27.7 1.75 95.5 0.51% SPECIFICATIONS: MAXIMUM SWELL OF 1% OR LESS NOTES: Respectfu I~ Submitted, CHARLES WILLIAMS ALPHA TESTING, INC. Our [est ~esults and tepo~ts are for the exclusive use of the Client (and ~t3eir designated ~pients on file in our office] and shall not be reproduced and/or distributed except ~*~th express approval of ALPHA The use of our Geotechnical Engineering /~ Construction Materials Testing /~ Environmental Engineering /,~ Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Do#as, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS DATE: 03/07/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE (Mass grading only) COPPELL, TEXAS OUR REPORT NO.: 04773-27 TEST DATA: TEST DATE ~ ELEV. SOIL ID O~nUuu MAXIMUM Le~ IN KE IN PL~E PERCENT COMMENT* NO.DEI~TH "~ NUMBER % PCF % PCF 146 03/07~05 SG 2 21.0 103 22.6 101 98 2-A 147 03/07/05 SG 2 21.0 103 24.2 98 95 2-A 148 03107~05 SG 2 21.0 103 21.2 101 98 2-A 149 03/07~05 SG 2 21.0 103 23.9 98 96 2-A 150 03107105 FG-4.5 2 21.0 103 22.6 100 97 1 -A 151 03~07~05 FG-4.0 2 21.0 103 24.1 98 95 1-A 152 03/07/05 FG-4.5 2 21.0 103 23.5 100 97 1-A TEST LOCATION: BUILDING PAD 146 20' N AND 20' E FROM THE SW CORNER OF BLOCKA, PAD 17 147 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 18 148 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 19 149 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 20 150 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 17 151 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 17 152 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 18 I FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED · A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COM PLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, Geotechnical Engineering /~ Construction Materials Testing /~ Environmental Engineering/:~ Consulting ALPHA TESTIN( , INC. 220~ Wlscor~n St., Suite I00 Doffos, Texos 7522~ 972/620-8911 * 972/2d3-~37 (Metro) FAX: TESTED FOR: HAWKINS - WELWOOD HOMES, LP. DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03~07~05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE (Mau grading only) COPPELL, TEXAS OUR REPORT NO.: 04773-27A TEST DATA: TEST DATE _~ ELEV. SOIL ID O~IMUM MAXJMUM LAB IN PEACE ~N PLACE FERCE~rr COMMENT* NO.DEPTH ~,t NUMBER % ~=CF % ~ 153 03/07/05 FG~,.0 2 21.0 103 22.0 101 98 1-A 154 03/07/05 FG-4.5 2 21.0 103 24.1 99 96 1-A 155 03107/05 FG-4.0 2 21.0 103 23.8 99 96 1-A 156 03/07/05 FG-4.5 2 21.0 103 24.1 100 97 1-A 157 03/07105 FG-4.0 2 21.0 103 23.7 99 96 1-A TEST LOCATION: BUILDING PAD 153 20' N AND 20' E FROM THE SW CORNER OF BLOCKA, PAD 18 154 20' N AND 20' E FROM THE SW CORNER OF BLOCKA, PAD 19 155 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 19 156 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 20 157 !0' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 20 FILL NATURAL SUBGRADE LIME STABILIZED CEMENT TREATED · A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, CHARLES WILLIAMS ALPHA TESTING, ~NC Geotechnical Engineering F~ Construction Materials Testing/:~ Environmental Engineering/~ Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 DO#os, Texos 75229 972/620~911 - 972_/263-4~37 (Mefro) Fa, X: 972/405-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS DATE: 03~07~05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE (Mass grading only) COPPELL, TEXAS OUR REPORT NO.: 04773-29 TEST DATA: TEST DATE __~._.. ELEV I SOIL ID o~nuuu MAXIMUM ~B IN PLACE IN PLACE PERCENT COMMENT* NO.3EPTH ~ NUMBER % Pc~ % PCF 158 03/07/05 FG-I.0 2 21.0 103 24.4 98 95 1-A 159 03~07~05 FG-1.0 2 21.0 103 24.7 98 95 1-A 160 03~07~05 FG-1.0 2 21.0 103 24.2 98 95 1-A 161 03/07/05 FG-1.0 2 21.0 103 24.0 98 95 1-A 162 03107/05 FG-1.0 2 21.0 103 22.9 100 97 1-A 163 03107/05 FG-1.0 2 21.0 103 22.0 101 98 1-A 164 03~07~05 SG 2 21.0 103 23.1 100 97 2-A TEST LOCATION: BUILDING PAD 158 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 27 159 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 28 160 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 29 161 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 30 162 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 31 163 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 32 164 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 9 FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED · A IN PLACE PERCENT MOISTURE AND P~RCENT COMPACTION COMPLY WITH SPECIFICATIONS {~ PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOEE NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, CHARLES WILLIAMS ALPHA TESTING, INC Geotechnical Engineering /~ Construction Materials Testing /~ Environmental Engineering /:b Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Do#as, Texas 75229 972/620-8911 - 972_/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS DATE: 03/07/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE (Mass grading only) COPPELL, TEXAS OUR REPORT NO.: 04773-29A TEST DATA: TEST DATE _ ~ ELEV SOIL ID OPTIMUM lU~,XJMUM LAB IN PLACE IN PLACE PERCENT COMMENT' NO.3EPTH ~ NUMBER % Pc~ % PcF 165 03/07/05 SG 2 21.0 103 23.6 99 96 2-A 166 03/07/05 SG 2 21.0 103 23.1 99 97 2-A 167 03/07105 SG 2 21.0 103 23.2 98 96 2-A 168 03/07105 SG 2 21.0 103 23.1 100 97 2-A 169 03/07~05 SG 2 21.0 103 22.6 100 97 2-A 170 03/07~05 SG 2 21.0 103 24.0 98 95 2-A 171 03/07/05 SG 2 21.0 103 23.7 98 96 2-A TEST LOCATION: BUILDING PAD 165 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 10 166 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 11 167 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 12 168 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 13 169 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 14 170 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 15 171 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 16 I FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED · A INPLACEPERCENTMOISTUREANDPERCENTCOMPACTIONCOMPLYWITHSPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respect/ully Subm~ted, CHARLES WILLIAMS ALPHA TESTING, rNC Geotechnical Engineering /~ Construction Materials Testing /~ Environmental Engineering /~ Consulting