Loading...
Villas at LV-LR050305ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dalk~ Texas 75229 972/620-8911 - 972_j263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS - WELWOOD HOMES, LP. DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS DATE: 03/05/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE (Mass grading only) COPPELL, TEXAS OUR REPORT NO.: 04773-26 TEST DATA: TEST DATE __~... ELEV. SOIL ID Ore, MUM MAXIMUM LAB IN PLACE IN PLACE PERCENT · MOIS~JRE DRY DEENSFT'Y MOISTURE ORY DENSrTY COMMENT* COMPACTION NO.DEFTH ~,,~ NUMBER % PCF % PCF 128 03~05~05 FG-2.5 2 21.0 103 23.0 100 97 1-A 129 03/05/05 FG-2.0 2 21.0 103 22.8 99 96 1-A 130 03~05~05 FG-I.5 2 21.0 103 22.2 100 97 1-A t 31 03/05/05 FG-2.5 2 21.0 103 23.5 99 96 1-A 132 03/05/05 FG-2.0 2 21.0 103 22.0 100 97 1-A 133 03~05~05 FG-1.5 2 21.0 103 22.5 101 98 1-A 134 03/05/05 FG-2.5 2 21.0 103 22.3 101 98 1-A TEST LOCATION: BUILDING PAD 128 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 25 129 .)0' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 25 130 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 25 131 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 26 132 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 26 133 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 26 134 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 27 FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED · A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECiFICATiONS B PERCENTCOMPACTIONDOESNOTCOMPLYWITHSPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WiTH SPECIFICATIONS Respectful¥ Submitted. CHARLES WILLIAMS ALPHA TESTING. INC. Geotechnical Engineering /~ Construction Materials Testing/~ Environmental Engineering /;~ Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite I00 Dollas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FA)C' 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOP,: HAWKINS - WELWOOD HOMES, L.P. DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS DATE: 03/05/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE (Mass grading only) COPPELL, TEXAS OUR REPORT NO.: 04773-26A TEST DATA: TEST DATE _'~._.. ELEV. SOIL ID OPTIMUM MAXIMUM LA~ IN PLACE IN PL~E PERCENT COMMENT* · MOiS~JRE DRY D~NSITY MOISTURE DRY DENSITY COMP~-~TiON NO.DEPTH "~ NUMBER % PCF % PCF 135 03/05/05 FG-2.0 2 21.0 103 24.4 98 95 I*A 136 03/05/05 FG-1.5 2 21.0 103 23.9 99 96 1-A 137 03~05~05 FG-2.5 2 21.0 103 22.7 100 97 1-A 138 03/05/05 FG-2.0 2 21.0 103 22.0 100 97 1-A 139 03/05/05 FG-I.5 2 21.0 103 23.2 99 97 1-A 140 03~05~05 FG-2.5 2 21.0 103 22.3 100 97 1-A 141 03105/05 FG-2.0 2 21.0 103 23.4 99 96 1-A TEST LOCATION: BUILDING PAD 135 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 27 136 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 27 137 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 28 138 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 28 139 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 28 140 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 29 141 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 29 1 FiLL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED · A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENTCOMPACTION DOES NOTCOMPLYWITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE OOES NOT COMPLY WITH SPECIFICATIONS Respectfully Subm~ted. CHARLES WILLIAMS ALPHA TESTING, INC Geotechnical Engineering /;J Construction Materials Testing ~ Environmental Engineering ,:~ Consulting ALPHA TESTING, INC. 2209 VVlscon$1n St., Suite 100 Dallas, Texas 75229 972/620.8911 - 972/263-4c/37 [Metro) FAX: 972/406-~1__~.'~ REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS DATE: 03/05/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE (Mass grading only) COPPELL, TEXAS OUR REPORT NO.: 04773-26B TEST DATA: 142 03/05/05 FG-1.5 2 21.0 103 25.0 98 95 1-A 143 03/05~05 FG-2.5 2 21.0 103 22.4 100 97 1-A 144 03/05/05 FG-2.0 2 21.0 103 24.4 99 96 1-A 145 03/05/05 FG-I.5 2 21.0 103 22.0 100 97 1-A TEST LOCATION: BUILDING PAD 142 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 29 143 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 30 144 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 30 145 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 30 FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENTINPLACEMOISTUREDOESNOTCOMPLYWITHSPECIFICATIONS R especffully S ubmitt ed, D RETEST CHARLES WILLIAMS ALPHA TESTING, Geotechnical Engineering F~ Construction Materials Testing /~ Environmental Engineering /~ Consulting