Loading...
Villas at LV-LR050329ALPHA TESTING, INC. 2209 WisConsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS o WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS DATE: 03/2g/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-78 TEST DATA: TEST DATE ~_ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PI.ACE IN PLACE PERCENT COMMENT* MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION NODEPTH '~ NUMBER % PCF % PCF 801 03/29/05 FG~3.0 5 16.5 110.5 18.5 106 96 1-A 802 03~29~05 FG-2.5 5 16,5 110.5 21.2 107 96 1-A 803 03~29~05 FG-2,0 5 16.5 110.5 17.5 109 98 1-A 804 03/29/05 FG-1.5 4 23.5 96.5 28.8 91 94 1-A 805 03~29~05 FG-1.0 4 23.5 96.5 29.5 92 95 1-A 806 03129105 FG-3.0 5 16.5 110.5 19.4 107 96 1-A 807 03/29/05 FG-2.5 5 16.5 110.5 19.1 105 95 1-A LOCATION: BUILDING PAD 801 25' N AND 25' E FROM THE SW CORNER OF BLOCK A, PAD 11 802 25' N AND 25' E FROM THE SW CORNER OF BLOCK A, PAD 11 803 25' N AND 25' E FROM THE SW CORNER OF BLOCK A, PAD 11 804 25' N AND 25' E FROM THE SW CORNER OF BLOCK A, PAD 11 805 25' N AND 25' E FROM THE SW CORNER OF BLOCK A, PAD 11 806 25' N AND 25' E FROM THE SW CORNER OF BLOCK A, PAD 12 807 25' N AND 25' E FROM THE SW CORNER OF BLOCK A, PAD 12 I FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST · A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS Respectfully Submitted, CHARLES WILLIAMS ALPHA TESTING, INC Our tesl results and reports are for the exclusive use of the Client (and their designated recipients on file in our office) and shall not be reproduced and/or distabuted except with express approval o¢ ALPHA The use of our name and test results must receive our written approval Test results and reports apply only to the samples tested and/or observed and are not indicative of/he qualitie s of apparertly identical or similar specimens Geotechnical Engineering / Construction Mater~als Testing / Environmental Engineering /; Consulting ALPHA TESTING, INC. 2209 Wisconsin St,, Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, LP. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/29/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-78A TEST DATA: TEST DATE ~ ELEV. SOIL ID OPTIMUM MA)(IMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO.DEPTH '~ NUMBER % PCF % PCF 808 03/29/05 FG-2.0 5 16.5 110.5 21.2 107 97 1-A 809 03~29~05 FG-1.5 4 23.5 96.5 30.4 92 96 1-A 810 03~29~05 FG-I.0 4 23.5 96.5 31.0 91 94 1-A 811 03/29/05 FG-4.5 4 23.5 96.5 28.7 93 96 1-A 812 03/29/05 FG-4.0 4 23.5 96.5 29.1 93 96 1-A 813 03/29/05 FG-4.5 4 23.5 96.5 30.0 91 95 1-A 814 03/29/05 FG-4.0 4 23.5 96.5 29.9 91 95 1-A T LOCATION: BUILDING PAD 808 25' W AND 25' E FROM THE SW CORNER OF BLOCK A, PAD 12 809 25' W AND 25' E FROM THE SW CORNER OF BLOCK A, PAD 12 810 25' W AND 25' E FROM THE SW CORNER OF BLOCK A, PAD 12 811 :)5' W AND 25' E FROM THE SW CORNER OF BLOCK B, PAD 1 812 25' W AND 25' E FROM THE SW CORNER OF BLOCK B, PAD 1 813 25' W AND 25' E FROM THE SW CORNER OF BLOCK B, PAD 2 814 :~5' W AND 25' E FROM THE SW CORNER OF BLOCK B, PAD 2 1 FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED · A INPLACEPERCENTMOISTUREANDPERCENTCOMPACTIONCOMPLYWITHSPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Subm~ted, Our test results and reports are for the exclusive USe of the Client (and their designated ¢eCiplent s on file in our office) and shall not be ?eproduced and/or distrlbutea except with express approval of ALPHA Theuseofournameandtestresultsmustrecelveourwn~tenapp¢oval Tes~resu~tsandrep~rt~ap~y~n~y~t~esamp~estested~nd~r~bser~$dandaren~tindicative~fthequa~i~es~f Geotechnical Engineering / Construction Materials Testing /, Environmental Engineering / Consulting ALPHA T£STING, INC. 220~ Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS DATE: 03/29/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-78B TEST DATA: TEST DATE ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT COMMENT* MOISTURE DRY OENSITY MOISTURE DRY DENSITY COMPACTION NO.3EPTH '-,,~ NUMBER % PCF % PCF 815 03/29/05 FG-4.5 4 23.5 96.5 31.3 90 93 1-A BUILDING PAD 815 25' N AND 25' E FROM THE SW CORNER OF BUILDING B, PAD 3 FILL NATURALSUBGRADE LIME STABILIZED CEMENTTREATED *A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATtONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIPICATIONS Respectfully Submitted, D. RETEST CHARLES WILLIAMS ALPHA TESTING, INC Our test results and reports are for the exclusive use o[ the Client (and their designated recipients on file in our office) and sha~l not be reproduced and/or distributed except with express approval of ALPHA The use of our name and lest results must recelve our written approvai Test resu[(s and reports apply only to the samples tested andlor observed anaarenotindiCativeofthequal~tie$of Geotechnical Engineering / Construction Materials Testing / Environmental Eng/neering / Consulting