Loading...
Villas at LV-LR050323ALPHA TESTIN( , INC. 220~ Wisconsin St., Suite 100 ~lld~ Texas 75229 972/620-8911 - 972/263-4937 (Metro*) FAX: 972/406-8023 TESTED FOR: HAWKINS-WELWOOD HOMES, LP C/O DOWDEY, ANDERSON AND ASSOCIATES PLANO, TEXAS PROJECT: VILLAS AT LAKE VISTA PHASEI COPPELL, TEXAS IN-SITU SWELL POTENTIAL DATE: 03/23105 OUR REPORT NO.: 04773-68 TEST METHOD: ASTM D 4546 METHOD B TEST DATE SAMPLE MATERIAL INITIAL FINAL HAND DRY UNIT TOTAL NO. SAMPLED LOCATION DESCRIPTION PERCENT PERCENT PENETRO- WEIGHT PERCENT MOISTURE MOISTURE METER (PCF) SWELL QC-30 03/23/05 BLOCK A PAD 2 (FG-4.0') DARK BROWN CLAY 30.7 31.3 1.25 93.4 0.36% QC-31 03/23/05 BLOCK A PAD 7 (FG-4.0') DARK BROWN CLAY 32.6 33.5 1.50 91.4 0.60% QC-32 03/23/05 BLOCK A PAD 34 (FG-I.0') TAN CLAY 23 23.5 1.75 98.4 0.32% QC-33 03/23/05 BLOCK B PAD 8 (FG-I.0') TAN CLAY 23.4 24.2 1.50 97.5 0.27% QC-34 03/23/05 BLOCK B PAD 15 (FG-4.0') )ARK BROWN CLAY 31.5 31.9 1.25 92.1 0.47% SPECIFICATIONS: NOTES: MAXIMUM SWELL OF 1% OR LESS Respecfful~ Submitted, CHARLES WILLIAMS ALPHA TESTING, INC. Geotechnical Engineering /,~ Construction Materials Testing /:b Environmental Engineering ~ Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dollos, Texos 75229 972/620-8011 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/23/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-72 TEST DATA: TEST DATE ~ELEV SOIL ID OPTIMUM MAXIMUM LAB iN pLACE IN PLACE PERCENT COMMENT* MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION NO.DEPTH "~ NUMBER % PCF % PCF 705 03/23/05 FG-4.5 4 23.5 96.5 29.1 92 95 1-A 706 03/23/05 FG-4.0 4 23.5 96.5 29.8 91 94 1-A 707 03/23/05 FG-3.5 5 16.5 110.5 22.0 104 94 1-A 708 03/23/05 FG-3.0 5 16.5 110.5 20.7 106 96 1-A 709 03/23/05 FG-2.5 4 23.5 96.5 30.4 90 93 1-A 710 03/23/05 FG-4.5 4 23.5 96.5 29.3 92 96 1-A 711 03/23/05 FG-4.0 4 23.5 96.5 29.2 91 94 1-A TEST LOCATION: BUILDING PAD 705 Z0' N AND 30' E FROM THE SW CORNER OF BLOCK B, PAD 13 706 "Z0' N AND 30' E FROM THE SW CORNER OF BLOCK B, PAD 13 707 :)0' N AND 30' E FROM THE SW CORNER OF BLOCK B, PAD 13 708 20' N AND 30' E FROM THE SW CORNER OF BLOCK B, PAD 13 709 :~0' N AND 30' E FROM THE SW CORNER OF BLOCK B, PAD 13 710 ~0' N AND 30' E FROM THE SW CORNER OF BLOCK B, PAD 14 711 20' N AND 30' E FROM THE SW CORNER OF BLOCK B, PAD 14 1. FILL 2 NATURALSUBGRADE 3. LIME STABILIZED 4 CEMENTTREATED *A IN PLACE PERCENT MOISTURE ANt:) PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B. PERCENT COMPACTION OOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectful~Submitted, D RETEST CHARLES WILLIAMS ALPHA TESTING, INC Our test results and reporls are for the exclusive use of the Client (and/heir designated recipients on file in our o~ce) and shall riot be reproduced aQd/or distributed except with express app¢oval of ALPHA The use of ou¢ name and test results must receive our written approval Test resutts and repons apply only to ~he samples tested and/or obsen~ed and are not indicative ol the qualities of apparently identiCal or similar specimens Geotechnical Englneenng I Construction Materials Testing I Environmental Engineering f~ Consulting ALPHA TESTING, INC. ~209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/23105 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-72A TEST DATA: TEST DATE ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT* COMPACTION NO, NUMBER % PCF % PCF 712 03~23~05 FG-3.5 5 16.5 110.5 18.2 106 96 1-A 713 03~23~05 FG-3.0 5 16.5 110.5 19.0 107 97 1-A 714 03/23/05 FG-2.5 4 23.5 96.5 29.2 91 95 1-A 715 03~23~05 FG~,.5 4 23.5 96.5 30.2 91 94 1-A 716 03/23~05 FG-4.0 4 23.5 96.5 30.9 91 95 1-A 717 03~23~05 FG-3.5 5 16.5 110.5 19.1 105 95 1-A 718 03~23~05 FG-3.0 5 16.5 110.5 18.3 106 96 1-A TEST LOCATION: BUILDING PAD 712 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 14 713 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 14 714 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 14 715 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 15 716 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 15 717 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 15 718 20' N AND 20' E FROM THE SW CORNER OF BLOCK lB, PAD 15 I FILL 2 NATURAL SUBGRADE 3. LIME STABILIZED 4 CEMENT TREATED B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST *A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS Respectfully Submitted, CHARLES WILLIAMS ALPHA TESTING. INC. Geotechnica/ Engineering / Construction Materials Testing / Environmental Engineering /. Consulting ALPHA TESTING, INC. ~209 Wisconsin St., Suite I00 Oollos, Texos 7~2.29 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/23/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-72B TEST DATA: TEST DATE ~ ELEV. SOIL ID OPT1MUM MAXIMUM LAB IN PLACE IN PLACE PERCENT COMMENT* MO~S31JRE DRY DENSITY MOISTURE DRY DENSI~' COMPACTION NO.DEPTH ~ NUMBER % PCF % PCF 719 03/23/05 FG-2.5 4 23.5 96.5 30.7 92 95 1-A 720 03/23~05 FG-2.5 4 23.5 96.5 30.5 90 93 1-A 721 03/23105 FG-2.5 4 23.5 96.5 28.5 92 95 1-A 722 03~23/05 FG-2.5 4 23.5 96.5 30.4 92 95 1-A 723 03/23/05 FG-2.5 4 23.5 96.5 29.8 91 94 1-A 724 03~23~05 SG 4 23.5 96.5 31.3 91 94 2-A 725 03~23~05 FG4.5 4 23.5 96.5 29.4 92 95 1-A TEST LOCATION: BUILDING PAD 719 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 15 720 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 16 721 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 17 722 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 18 723 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 19 724 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 6 725 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 6 I FILL 2 NATURAL SUBGRADE 3. LIME STABILIZED 4 CEMENT TREATED · A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, CHARLES WILLIAMS ALPHA TESTING, Geotechnical Engineering /' Construction Materials Testing /:' Environmental Engineering /-' Consulting ALPHA TESTING, INC. 2209 Wisconsin ~t,, Suite 100 Dollos, Texas 7522~ 972/620-8911 - 972/263-4937 CMetro) F~(: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/23105 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-72C TEST DATA: TEST DATE ~ELEV SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY OENSI3~f MOISTURE CRY DENSITY COMMENT* NO.DEPTH ~,,~ NUMBER % PCF % PCF COMPACTION 726 03~23~05 FG-4.0 4 23,5 96.5 28.8 92 95 1-A 727 03/23/05 FG-3.5 4 23.5 96.5 28.8 91 94 1-A 728 03/23/05 FG-3,0 4 23,5 96.5 29.6 90 93 1-A TEST LOCATION: BUILDING PAD 726 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 6 727 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 6 728 20' N AND 20' E FROM THE SW CORNER OF BLOCK B, PAD 6 1 FILL * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submrtted, 4 CEMENT TREATED D RETEST CHARLES WILLIAMS ALPHA TESTING, INC Our test results and reports are for the exclusive use of Ihe Client (and their designated recipients on file in our offce) and sha~l not be reproduced and/or diSl~lbuted except with express approval of ALPHA Theuseofournamearl~3testresultsmustreceiveourwriltenapprova~ Testresu~tsandre~rt$app~y~nlyt~thesampIestestedand~r~served~anda~n~tind~cative~fthequa~ities~f apparently idenaCal or similar specimens Geotechnical Engineer/rig / Construction Materials Test/rig / Environmental Engineering / Consulting