Loading...
Villas at LV-LR050322ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Doll~.~ Texos 7522~ 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS-WELWOOD HOMES, LP CIO DOWDEY, ANDERSON AND ASSOCIATES PLANO, TEXAS PROJECT: VILLAS AT LAKE VISTA PHASE I COPPELL, TEXAS IN-SlTU SWELL POTENTIAL DATE: 03~2/05 OUR REPORT NO.: 04773-66 TEST METHOD: ASTM D 4546 METHOD B TEST DATE SAMPLE MATERIAL INITIAl. FINAL HAND DRY UNIT TOTAL NO. SAMPLED LOCATION DESCRIPTION PERCENT PERCENT PENETRO- WEIGHT PERCENT MOISTURE MOISTURE METER (PCF) SWELL QC-27 03/22/05 BLOCK B PAD 11 (FG-4.0') DARK BROWN CLAY 32.8 33.5 1.25 91.6 0.40% QC-28 03/22/05 BLOCK B PAD 8 (FG-4.0') )ARK BROWN CLAY 31.3 31.6 1.50 9!.9 0.43% QC-29 03/22/05 BLOCK A PAD 14 (FG-1.0') TAN CLAY 23.1 23.8 1,75 95.2 0.29% SPECIFICATIONS: NOTES: MAXIMUM SWELL OF 1% OR LESS Respectfully Submitted, CHARLES WILLIAMS ALPHA TESTING, INC. Geotechnical Engineering /2~ Construction Materials Testing lb Environmental Engineering ~ Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Da#os, Texos 75229 972/620~8911. 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS - WELWOOD HOMES, bP. CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS DATE: 03/22105 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-71 TEST DATA: TEST DATE ~ELEV SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN pLACE PERCENT COMMENT* MOISTURE DRY DENSITY MCISTURE DRY DENSITY COMPACTION NO.DEPTH ~..~ NUMBER % PCF % PCF 681 03/22/05 FG-2.0 5 16.5 110.5 19.9 105 95 1-A 682 03~22/05 FG-I.5 5 16.5 110.5 19.8 103 93 1-A 683 03/22105 FG-1.0 5 16.5 110.5 19.0 105 95 1-A 684 03/22/05 FG-2.5 5 16.5 110.5 20.1 106 95 1-A 685 03~22~05 FG-2.0 5 16.5 110.5 20.0 104 94 1-A 686 03~22~05 FG-I.5 5 16.5 110.5 18.5 108 97 1-A 687 03/22/05 FG-2.0 5 16.5 110.5 18.5 104 94 1-A TEST LOCATION: BUILDING PAD 681 20' N AND 30' W FROM THE SE CORNER OF BLOCK B, PAD 21 682 20' N AND 30' W FROM THE SE CORNER OF BLOCK B, PAD 21 683 20' N AND 30' W FROM THE SE CORNER OF BLOCK B, PAD 21 684 20' N AND 30' W FROM THE SE CORNER OF BLOCK B, PAD 22 685 20' N AND 30' W FROM THE SE CORNER OF BLOCK B, PAD 22 686 :)0' N AND 30' W FROM THE SE CORNER OF BLOCK B, PAD 22 687 20' N AND 30' W FROM THE SE CORNER OF BLOCK B, PAD 23 FILL 2 NATURAL SUBGRADE 3. LIME STABILIZED 4 CEMENT TREATED * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WiTH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Subm~ed, D RETEST CHARLES WILL~AMS ALPHA TESTING, INC Geotechmcal Engineering / Construction Materials Teshng /, Environmental Engineering /' Consulting ALPHA TESTING, INC. REPORT OF FIELD COMPACTION TESTS 2209 Wisconsin St,, Suite 100 Daflos, Texos 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972~406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. C/O DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS DATE: 03/22105 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-71A TEST DATA: TEST DATE ~ ELEV. SOfL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT COMMENT* MOISTURE DRY DENSITY MOISTURE ORY DENSITY COMPACTION NO.3EPTH ~..~ NUMBER % PCF % I=CF 688 03/22/05 FG-1.5 5 16.5 110.5 17.7 109 98 1-A 689 03/22/05 FG-1.0 5 16.5 110.5 19.9 106 96 1-A 690 03/22/05 FG-1.0 5 16.5 110.5 18.5 104 94 1-A 691 03/22/05 FG-1.0 5 16.5 110.5 20.3 105 95 1-A 692 03/22/05 FG-1.0 5 16.5 110.5 17.6 106 96 1-A 693 03/22/05 FG-1.0 5 16.5 110.5 20.5 106 96 1-A 694 03/22/05 FG-3.0 4 23.5 96.5 31.6 92 95 1-A TEST LOCATION: BUILDING PAD 688 20' N AND 30' W FROM THE SE CORNER OF BLOCK B, PAD 23 689 20' N AND 30' W FROM THE SE CORNER OF BLOCK B, PAD 23 690 20' N AND 30' W FROM THE SE CORNER OF BLOCK D, PAD 1 691 20' N AND 30' W FROM THE SE CORNER OF BLOCK D, PAD 8 692 20' N AND 30' W FROM THE SE CORNER OF BLOCK D, PAD 9 693 20' N AND 30' VV FROM THE SE CORNER OF BLOCK D, PAD 10 694 20' N AND 30' W FROM THE SE CORNER OF BLOCK A, PAD 1 1 FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENTTREATED PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS PERCENT IN PLACE MO~STORE DOES NOT COMPLY WITH SPECIFICATIONS RETEST · A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS Respectfully Submitted, CHARLES WILLIAMS ALPHA TESTING, INC Our test results and reporls are for the exclusive use of [ne C~ent (and their designated recipients on fi~e in our office) and shall not be reproduced and/or distributed except with express approval of ALPHA Theuseofoulnameandtestresultsmustrecelveourw'rlt~enapproval Testresu~tsandrep~ttsapp~y~n~yt~thesan3p~este$tedand/~r~$erved~andaren~t~ndicative~Ithequa~i~es~f apparently identiCal or sim/iai specimens Geotechmcal Enoineerino / Construction Materials Testmq / Envlronmental Enclmeerina /:' Consuftinq ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Do#os, Tex~ 7522~ 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, LP. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/22/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-71B TEST DATA: TEST DATE ~ ELEV. SOIL ID OPTIMUM MAXIMUM I.AB IN PLACE IN PLACE PERCENT COMMENT* MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION NO.DEPTH ~ NUMSER % PCF % PCF 695 03122~05 FG-2.5 4 23.5 96.5 30.3 90 93 1-A 696 03~22~05 FG-2.0 4 23,5 96.5 30.6 90 94 1-A 697 03/22/05 FG-3.0 4 23.5 96.5 31.5 90 94 1-A 698 03/22/05 FG-2.5 4 23.5 96.5 28.7 90 93 1-A 699 03/22105 FG-2,0 4 23.5 96.5 29.5 92 95 1-A 700 03/22/05 FG-3.0 4 23.5 96.5 30.1 90 94 1-A 701 03~22~05 FG-2.5 4 23.5 96.5 30.3 90 93 1-A TEST LOCATION: BUILDING PAD 695 20' N AND 30' W FROM THE SE CORNER OF BLOCK A, PAD 1 696 20' N AND 30' W FROM THE SE CORNER OF BLOCK A, PAD 1 697 20' N AND 30' W FROM THE SE CORNER OF BLOCK A, PAD 2 698 20' N AND 30' W FROM THE SE CORNER OF BLOCK A, PAD 2 699 20' N AND 30' W FROM THE SE CORNER OF BLOCK A, PAD 2 700 20' N AND 30' W FROM THE SE CORNER OF BLOCK A, PAD 3 701 20' N AND 30' W FROM THE SE CORNER OF BLOCK A, PAD 3 1. FILL 2. NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED *A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT iN pLACE MOISTURE DOES NOT COMPLY WITH SPECiFICATiONS Respectfully Submitted, D. RETEST CHARLES WILLIAMS ALPHA TESTING, INC. Geotechnical Eng¢neenng /, Construct/on Materials Testing /, Environmental Engineering /; Consulting ALPHA TESTING, INC. ~209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/22/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-71C TEST DATA: TEST DATE ~ ELEV, SOIL ID om-~Muta MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSI~ COMPACTION COMMENT* NO.DEPTH ~ NUMBER % PCF % ~CF 702 03122/05 FG-2.0 4 23.5 96.5 29.9 90 93 1-A 703 03/22/05 FG-3.0 4 23.5 96.5 29.4 91 95 1-A 704 03~22/05 FG-2.5 4 23.5 96.5 28.9 91 95 1-A TEST LOCATION: BUILDING PAD 702 20' N AND 30' W FROM THE SE CORNER OF BLOCK A, PAD 3 703 20' N AND 30' W FROM THE SE CORNER OF BLOCK A, PAD 4 704 20' N AND 30' W FROM THE SE CORNER OF BLOCK A, PAD 4 I FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED · A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS PERCENT IN pLACE MOISTURE DOES NOT COMPLY WITH SPEC~FICATIONS RETEST Respectfully Submitted, CHARLES WILLIAMS ALPHA TESTING, INC Our test results and reports are for the exclusive use of the Client {and their designated recipients on file in our office) arid shall riot 0e reproduced a/id/or distributed except W~th express approval of ALPHA The use of our name and test results must receive our wnlten approval Test results end reports apply only to the samples tested and/or obserVed, ana are not indicative of the Qualities of apparenlry identiCal or similar specimens Geotechnical Engineering I; Construction Materials Testing /;' Environmental Engineering f," Consulting