Loading...
Villas at LV-LR050321ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallos, Texos 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/21/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-63 TEST DATA: TEST CATE ~ELEV SOIL ID OPTIMUM MAXIMUM LAB IN PLACE :N PLACE MOISTURE DRY DENSITY MOISTURE DRY DENSITY PERCENT COMMENT* NO.DEPTH ~ NUMBER % PCF % PCF COMPACTION 639 03/21/05 FG~,.5 4 23.5 96.5 28.7 92 95 1-A 640 03/21105 FG-4.0 4 23.5 96.5 31.0 89 93 1-A 641 03/21/05 FG-3.5 4 23.5 96.5 31.5 91 94 1-A 642 03/21/05 FG-3.0 4 23.5 96.5 29.2 94 97 1-A 643 03/21/05 FG-4.5 4 23.5 96.5 30.7 91 94 1-A 644 03/21/05 FG-4.0 4 23.5 96.5 29.6 90 94 1-A 645 03/21/05 FG-3.5 4 23.5 96.5 31.4 89 93 1-A TEST LOCATION: BUILDING PAD 639 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 5 640 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 5 641 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 5 642 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 5 643 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 6 644 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 6 645 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 6 1 FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENTTREATED *A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully SuS~itted, D. RETEST CHARLES WILLIAMS ALPHA TESTING, INC Geotechnical Engineering / Construction Materials Teshng /: Environmental Engineering /.'~ Consulting ALPHA TESTING, INC. :2209 Wisconsin St., Suite 100 Do#as, Texas 75229 972/620-8911 - 972/263-4~37 (Metro) FAX: 972/406~023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS DATE: 03/21/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-63A TEST DATA: TEST ~ ELEV. SOIL ID OP1~Mui~ M~(IMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY OENSITY COMPACTION COMMENT* NO. DATE~EPTH~ NUMBER % PCF % PCF 646 03/21/05 FG-3.0 4 23.5 96.5 29.6 90 93 1-A 647 03/21/05 FG-4.5 4 23.5 96.5 30.3 90 93 1-A 648 03/21/05 FG-4.0 4 23.5 96.5 30.7 90 93 1-A 649 03/21105 FG-3.5 4 23.5 96.5 28.6 92 96 1-A 650 03/21/05 FG-3.0 4 23.5 96.5 30.4 90 94 1-A 651 03/21/05 FG-4.5 4 23.5 96.5 29.2 91 95 1-A 652 03/21/05 FG-4.0 4 23.5 96.5 29.7 90 93 1-A TEST LOCATION: BUILDING PAD 646 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 6 647 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 7 648 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 7 649 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 7 650 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 7 651 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 8 652 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 8 I FILL 2 NATURALSUBGRADE 3 LiME STABILIZED 4 CEMENTTREATED B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST · A iN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS Respectfully Subm~te~L CHARLES WILLIAMS ALPHA TESTING, INC Geotechmcal Engineering /~ Construction Materials Testing /? Environmental Engineering /~' Consulting ALPHA TESTING, INC. 2209 Wisconsin St,, Suite Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972~g~,..8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03121/05 OUR REPORT NO.: 04773-63B TEST DATA: TEST DATE ~ELEV SOIL ID OPTIMUM I~LAXIMUM LAB IN PLACE IN PLACE PERCENT COMMENT* MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION NO.DEPTH ~,~,h NUMBER % PCF % PCF 653 03/21/05 FG-3.5 4 23.5 96.5 29.2 92 95 1-A 654 03/21/05 FG-3.0 4 23.5 96.5 28.5 93 96 1-A 655 03/21/05 FG-2.5 5 16.5 110.5 21.4 103 93 1-A 656 03121/05 FG-2.0 5 16.5 110.5 20.2 104 94 1-A 657 03121/05 FG-I.5 5 16.5 110.5 18.6 107 97 1-A 658 03/21/05 FG-I.0 5 16.5 110.5 20.1 103 94 1-A 659 03/21/05 FG-2.5 5 16.5 110.5 18.4 107 97 1-A TEST LOCATION: BUILDING PAD 653 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 8 654 20' S AND 20' E FROM THE NW CORNER OF BLOCK A, PAD 8 655 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 7 656 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 7 657 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 7 658 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 7 659 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 8 1 FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENTTREATED B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D RETEST · A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS Respectfully SubmRted. CHARLES WILLIAMS ALPHA TESTING. INC Geotechnical Engineering / Construction Materials Testing /. Environmental Engineering ½~ Consulting ALPHA TESTING, INC, 2209 Wisconsin St., Suite 100 Do#os, Texos 75229 972/620-8¢11 - 972/263-4937 (Meh'o) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/21105 PROJECT: VILLAS AT IAKEVISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-63C TEST DATA: TEST DATE ~)E~ SOIL ID OPTIMUM MAXIMUM LAB IN pLACE IN PLACE PERCENT MOISTURE DRY DENSI~' MOISTURE DRY DENSITY COMMENT* NO. NUMBER % PCF % PCF COMPACTION 660 03/21/05 FG-2.0 5 16.5 110.5 20.2 106 96 1-A 661 03121/05 FG-1.5 5 16.5 110.5 21.5 105 95 1-A 662 03/21/05 FG-1.0 5 16.5 110.5 17.8 106 96 1-A 663 03/21/05 FG-2.5 5 16.5 110,5 19.3 107 97 1-A 664 03/21/05 FG-2.0 5 16.5 110.5 19.0 108 98 1-A 665 03/21/05 FG-1.5 5 16.5 110.5 20.2 104 94 1-A 666 03/21/05 FG-I.0 5 16.5 110.5 21.4 105 95 1-A TEST LOCATION: BUILDING PAD 660 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 8 661 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 8 662 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 8 663 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 9 664 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 9 665 ;'0' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 9 666 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 9 1 FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENTTREATED · A INPLACEPERCENTMOISTUREANDPERCENTCOMPACTIONCOMPLYWITHSPECIFtCATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully S u bmiffed, D RETEST CHARLES WILLIAMS ALPHA TESTING~ lNG Our test/esul(s and repods are for the exclusive use of the Client (and their designated recJpienls on file in our office) and shall not be reproduced and/or distnbuted except w]th express approval of ALPHA The use of our name and test cesults must recelve our wntten approval Te$t resu~ and rep~rts app~y ~n~y ~ the sampies te$ted and/~r ~b~e~ed~ and are n~t ~ndicati~e ~f the qua~ities ~f apparently identical or $i~lll&r specimens Geotechnical Engineering / Construction Materials Testing /, Environmental Engineering /, Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallos, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P, CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/21/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-63D TEST DATA: TEST DATE ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAJ~ IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT* NO.DEPTH~ NUMBER % PCP % PCF COMPACTION 667 03/21/05 FG-2.5 5 16.5 110.5 19.2 106 96 1-A 668 03121/05 FG-2.0 5 16.5 110.5 20.t 104 95 1-A 669 03/21/05 FG-I.5 5 16.5 110.5 19.3 106 96 1-A 670 03/21105 FG-I.0 5 16.5 110.5 19.8 105 95 1-A 671 03/21/05 FG-2.5 5 16.5 110.5 19.7 106 96 1-A 672 03/21/05 FG-2.0 5 16.5 110.5 20.3 105 95 1-A 673 03121/05 FG-I.5 5 16.5 110.5 21.2 106 96 1-A TEST LOCATION: BUILDING PAD 667 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 10 668 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 10 669 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 10 670 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 10 671 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 11 672 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 11 673 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 11 1 FILL 2 NATURALSUBGRAOE 3 LIME STABILIZED 4 CEMENTTREATED · A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submiaed, CHARLES WILLIAMS ALPHA TESTING, INC Geotechnicat Eng/neenng I Construction Mater/als Testing I Environmental Englneenng I? Consulting ALPHA TESTING, INC. 3209 Wlscon~in St,, Suite 100 Dallos, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/21/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-63E TEST DATA: TEST DATE ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PL~,CE IN PLACE PERCENT COMMENT* MOISTURE DRY OENSITY MOISTURE DRY DE NSI'P¢ COMPACTION NO,DEPTH ~,,h NUMBER % PCF % PCF 674 03/21/05 FG-1.0 5 16.5 110.5 20.3 105 95 1-A 675 03/21/05 FG-4.0 5 16.5 110.5 20.1 104 94 1-A 676 03/21/05 FG-3.5 5 16.5 110.5 19.2 103 93 1-A 677 03/21/05 FG-3.0 5 16.5 110.5 19.1 105 95 1-A 678 03/21/05 FG-2.5 5 16.5 110.5 20.5 105 95 1-A 679 03121/05 FG-2.0 5 16.5 110.5 19.8 104 94 1-A 680 03/21/05 FG-1.5 5 16.5 110.5 19.4 103 93 1-A TEST LOCATION: BUILDING PAD 674 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 11 675 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 12 676 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 12 677 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 12 678 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 12 679 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 12 680 20' S AND 20' E FROM THE NW CORNER OF BLOCK B, PAD 12 1. FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED iN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully SubmRted, RETEST ,- CHARLES WILLIAMS ALPHA TESTING, INC Our test results and repofls are for the exclusive use of the Client {and their designated recJpients on file in our office) and shall not be reproduCed and/or distributed except wittl express approval of ALPHA The use of our name and test results must receive our wntten approval Tes~ ¢esu~s and rep~r~s app~y ~n~y t~ ~he s~mp~e$ tes~ed and~r ~bsecved and are n~t ~ndicative of ~he quai~t~es ~f apparently identical od sim~la~ specimens Geotechnical Englneenng I Construction Materials Testing I Environmental Engineering /; Consulting