Loading...
Villas at LV-LR050319ALPHA TESTING, INC. 220~ Wisconsin St.. Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406~023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS DATE: 03/19/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-61 TEST DATA: TEST DATE ~ELEV SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT COMMENT* MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION NO.DEPTH ~ NUMBER % pcF % PCF 595 03/19/05 SG 2 21.0 103 24.0 100 97 2-A 596 03/19/05 SG 2 21.0 103 22.3 100 97 2-A 597 03/19/05 SG 2 21.0 103 22.5 104 101 2-A 598 03/19/05 SG 2 21.0 103 22.9 99 97 2-A 599 03/19/05 SG 2 21.0 103 24.5 99 96 2-A 600 03/19/05 SG 2 21.0 103 23.7 100 97 2-A 601 03/19/05 SG 2 21.0 103 24.0 99 96 2-A TEST LOCATION: BUILDING PAD 595 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 1 596 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 2 597 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 3 598 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 4 599 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 5 600 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 6 601 20' N AND 20' E FROM THE SW CORNER OF BLOCKA, PAD 7 FILL NATURALSUSGRADE LIME STABILIZED CEMENTTREATED * A tN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, D RETEST CHARLES WILLIAMS ALPHA TESTING, INC Geotechnical Engineering / Construction Materials Testing / Environmental Engineering // Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas. Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX; 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS DATE: 03/19/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-61A TEST DATA: TEST ~. ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENStTY klOISTURE ORY DENSITY COMPACTION COMMENT* NO. DATEDEPT~....% NUMBER % PCF % PCF 602 03/19/05 SG 2 21.0 103 22.7 100 97 2-A 603 03/19/05 FG-2.5 3 11.5 121 13.9 117 96 1-A 604 03/19/05 FG-2.0 3 11.5 121 13.3 118 98 1-A 605 03/19/05 FG-1.5 3 11.5 121 13.2 117 97 1-A 606 03/19/05 FG-1.0 3 11.5 121 11.8 116 96 1-A 607 03/19/05 FG-2.5 5 16.5 11Q5 18.8 108 97 1-A 608 03/19/05 FG-2.0 5 16.5 110.5 19.9 103 94 1-A TEST LOCATION: BUILDING PAD 602 20~ N AND 20! E FROM THE SW CORNER OF BLOCK A, PAD 8 603 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 13 604 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 13 605 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 13 606 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 13 607 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 14 608 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 14 1 FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENTTREATED *A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, D RETEST CHARLES WILLIAMS ALPHA TESTING, INC Geotechnlcal Engineering / Construction Matenals Testing / Environmental Engineering /;' Consulting ALPHA TESTING, INC. ~209 Wisconsin ~t., Suite Dallas, Texas 75229 972/620-8911 - 972/263-4937 [Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, bP. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/19105 PROJECT: VILLAS ATLAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-61B TEST DATA: TEST DATE ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAS IN PLACE IN PLACE PERCENT COMMENT* MOISTURS DRY DENSITY MOISTURE DRY DENSITY COMPACTION NO.~EPTH '~ NUMBER % Pcr % PCF 609 03/19/05 FG-1.5 5 16.5 110.5 18.1 106 96 1-A 610 03/19/05 FG-1.0 5 16.5 110.5 19.5 107 96 1-A 611 03/19105 FG-2.5 5 16.5 110.5 17.9 107 97 1-A 612 03/19/05 FG-2.0 3 11.5 121 14.3 118 98 1-A 613 03/19/05 FG-I.5 3 11.5 121 13.7 116 96 1-A 614 03/19/05 FG-1.0 3 11.5 121 13.3 119 98 615 03/19/05 FG-2.5 3 11.5 t21 12.8 119 98 1-A TEST LOCATION: BUILDING PAD 609 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 14 610 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 14 611 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 15 612 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 15 613 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 15 614 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 15 615 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 16 I FILL 2 NATURAL SUBGRADE 3 LIME STABILIZED 4 CEMENT TREATED · A INPLACEPERCENTMOISTUREANDPERCENTCOMPACTIONCOMPLYWITHSPECiFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, D RETEST CHARLES WILLIAMS ALPHA TESTING, INC Geotechnical Engineering I Construction Materials Testing I Environmental Engineering I' Consulting ALPHA TESTING, INC. ~209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/19/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-61C TEST DATA: TEST DATE ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO.3EPTH ~..~ NUMBER % PCF % PCF 616 03/19/05 FG-2.0 5 16.5 110.5 17.8 105 95 1-A 617 03119/05 FG-1.5 5 16.5 110.5 20.4 105 95 1-A 618 03/19/05 FG-I.0 5 16.5 110.5 19.6 104 94 1-A 619 03/19/05 FG-4.0 3 11.5 121 13.2 119 98 1-A 620 03/19/05 FG-3.5 3 11.5 121 14.0 118 97 1-A 621 03/19/05 FG-4.0 4 23.5 96.5 30.8 90 93 1-A 622 03/19105 FG-3.5 4 23.5 965 29.2 93 96 1-A TEST LOCATION: BUILDING PAD 616 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 16 617 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 16 618 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 16 619 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 9 620 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 9 621 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 10 622 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 10 I FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENTTREATED · A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respect fully Submitted, D RETEST CHARLES WILLIAMS ALPHA TESTING, INC Geotechnical Engineering / Construction Materials Testing / Environmental Engineering / Consulting ALPHA TESTING, INC. ~20~ Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PIANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/19/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-61D TEST DATA: TEST DE~ SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT COMMENT* NO. DATE NUMBER MOISTURE% DRYPcFOENSITY MOISTURE% DRYPcFDENSITY COMPACTION 623 03/19/05 FG-4.0 2 21.0 103 23.0 100 97 1-A 624 03/19/05 FG-3.5 2 21.0 103 22.8 98 96 1-A 625 03/19/05 FG-4.0 4 23.5 96.5 28.8 92 96 1-A 626 03/19/05 FG-3.5 4 23.5 96.5 28.5 91 95 1-A 627 03/19/05 FG-4.5 5 16.5 110.5 18.7 106 96 1-A 628 03/19/05 FG-4.0 5 16.5 110.5 19.2 105 95 1-A 629 03/19/05 FG-3.5 5 16.5 110.5 20.0 103 93 1-A TEST LOCATION: BUILDING PAD 623 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 11 624 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 11 625 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 12 626 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 12 627 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 1 628 20' N AND 20' E FROM THE SW CORNER OF BLOCKA, PAD 1 629 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 1 I FILL 2 NATURALSUBGRADE 3 LiME STABILIZED 4 CEMENTTREATED * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, D RETEST CHARLES WILLIAMS ALPHA TESTING, INC Geotechnical Engineering / Construction Materials Testing / En vlronmental Eng/neenng /, Consulting ALPHA TESTING, INC. 3209 Wisconsin St., Suite 100 Da//as, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 REPORT OF FIELD COMPACTION TESTS TESTED FOR: HAWKINS - WELWOOD HOMES, LP. C/O DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS DATE: 03/19/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-61E TEST DATA: TEST ~ ELEV SOIL ID OPTIMUM MAXIMUM LAB IN PLACE ~N PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT* NO DATE NUMBER % PCF % PCF COMPACTION 630 03/19/05 FG-4.5 5 16.5 110.5 19.1 105 95 1-A 631 03/19/05 FG-4.0 5 16.5 110.5 18.7 105 95 1-A 632 03/19/05 FG-3.5 5 16.5 110.5 18.4 106 96 1-A 633 03/19/05 FG-4.5 5 16.5 110.5 19.8 103 93 1-A 634 03/19/05 FG-4.0 5 16.5 110.5 17.5 107 97 1-A 635 03/19/05 FG-3.5 5 16.5 110.5 17.5 105 95 1-A 636 03/19/05 FG-4.5 5 16.5 110.5 18.1 105 95 1-A TEST LOCATION: BUILDING PAD 630 20' N AND 20' E FROM THE SWCORNER OF BLOCKA, PAD 2 631 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 2 632 20' N AND 20' E FROM THE SW CORNER OF BLOCKA, PAD 2 633 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 3 634 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 3 635 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 3 636 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 4 1 FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENTTREATED · A INPLACEPERCENTMOISTUREANDPERCENTCOMPACTIONCOMPLYWITHSPECIFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respect fully Submitted, D RETEST CHARLES WILLIAMS ALPHA TESTING, iNC. Geotechnical Engineering ' Construction Mater/als Testing / Environmental Engineering / Consulting ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallos, Texos 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR: HAWKINS - WELWOOD HOMES, L.P. CIO DOWDEY, ANDERSON & ASSOCIATES PLANO, TEXAS REPORT OF FIELD COMPACTION TESTS DATE: 03/19/05 PROJECT: VILLAS AT LAKE VISTA PHASE ONE COPPELL, TEXAS OUR REPORT NO.: 04773-61F TEST DATA: TEST DATE ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB tN PLACE tN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT* NO.;3EPTH '~ NUMBER % PCF % PCF COMPACTION 637 03119/05 FG-4.0 5 16.5 110.5 18.0 107 97 1-A 638 03/19/05 FG-3.5 5 16.5 110.5 19.9 106 96 1-A TEST LOCATION: BUILDING PAD 637 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 4 638 20' N AND 20' E FROM THE SW CORNER OF BLOCK A, PAD 4 I FILL 2 NATURALSUBGRADE 3 LIME STABILIZED 4 CEMENTTREATED * A INPLACEPERCENTMOISTUREANDPERCENTCOMPACTIONCOMPLYWITHSPEClFICATIONS B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, O RETEST ALPHA T[STING, lNG Our test results and reports are for the exclusive use of the Chent (and their designated recipients on file in our office} and sholr not be reproduced and/or distributed except with express approval of ALPHA Theuseofournameandtest(esultsmus~rece~veourwrlttenapproval Tes~resullsandreportsappl¥onlytothesamp~estestedandlorobserved andarenolindJcativeoflhequalitiesof Geotechmcal Engineering / Construction Materials Testing ,/ Environmental Engineering /, Consulting