Loading...
ST9302-UP000301 (2)LEGEND PROPOSED BACK Of CURB EXISTING PAVEMENT BOTH NORTH SIDES LANE ( MOORE TO SAMUEL ) HALF OF THE NORTH LANE ( SAMUEL TO MACARTHUR ) HALF OF THE SOUTH LANE ( SAMUEL TO MACARTHUR ) BOTH SOUTH SIDE LANES ( DENTON TAP TO SAMUEL ) REMAINDER OF NORTH LANES ( SAMUEL TO MACARTHUR ) REMAINDER OF SOUTH LANES (MOORE TO MACARTHUR ) SANDY LAK_E ROAD SANDY LAKE ROAD SANDY LAKE ROAD PROPOSED SANDY LAKE ROAD PAVING SEQUENCE MARCH, 2000 LEGEND PROPOSED BACK OF CURB EXISTING PAVEMENT BOTH NORTH SIDES LANE ( MOORE TO SAMUEL ) HALF OF THE NORTH LANE ( SAMUEL TO MACARTHUR ) HALF OF THE SOUTH LANE ( SAMUEL TO MACARTHUR ') BOTH SOUTH SIDE LANES ( DENTON TAP TO SAMUEL ) REMAINDER OF NORTH LANES ( SAMUEL TO MACARTHUR ) REMAINDER OF SOUTH LANES (MOORE TO MACARTHUR ) PROPOSED SANDY LAKE ROAD PAVING SEQUENCE N.T.S. MARCH, 2000