Loading...
Villas at LV-LR050804 American Rehab & Inspections, INC. ~:... '~)~.~ (214) 536-2915 [? ....... ^A,~ -~\ LOW PRESSURE AIR TEST FOR GRAVITY SANITARY/~$1;i4 k} Test Procedures ' Each section of sewer shall be tested between successive manholes. ~k~'& ~ _ , "7 Air shall be introduced into the pipeline until 4.0 psi gauge pressure has been reached. ~t t~t ti, m, e ~e~t_!_o,wt~Oj/ air shall be reduced and the internal air pressure shall be maintained between 3.5 and 4.5 psi gaug"C~Ot ~[ ~ minutes to allow the air temperature to come to equilibrium with the temperature oftbe pipe walls. Pr'L,s~ut~I.iadl~pipe shall be constantly monitored by a gauge and hose arrangement separate from the hose used to introduce air into the line. Pressure in the pipe shall not be allowed to exceed 5 psi. After the temperature has stabilized and no air leaks at the plugs have been found, the air pressure shall be used to determine that time lapse required for the air pressure to drop to 2.5 psi gauge. lfthe time lapse required for the air pressure to decrease from 3.5 to 2.5 psi exceeds that shown in the following table, the pipe shall be presumed to be within acceptable limits for leakage. If the time lapsed is less than that shown in the table, the contractor shall make eorreetions to reduce the leakage to acceptable limits. Line Information Test Results Air Test Mandrel Line Station to Station Pipe size L.F. Tested Time Passed ? Passed ? A 13+00- 12+06 15" 95 12M1N YES A 12+06 - 9+23 15" 284 12MIN YES A 9+23 - 6+81 15" 240 12MIN YES A 6+81 - 1+90 15" 485 12MIN YES A 1+90- 1+47 15" 36 12M1N YES A 1+47 - 0+10 15" 146 12MIN YES B 6+42 - 2+28 12" 413 10MIN YES B 2+28 - 0+00 12" 223 10MIN YES C 4+27 - 0+00 10" 428 10MIN YES D 4+02 - 0+00 8" 404 7 M1N YES E 0+43 - 0+00 8" 40 7 MIN YES Contractor: CULLUM Date: 08-04-05 Project: VII.LAS LAKE VISTA PHASE 1 Job#: Location: KEN HONEYCUTT Tested By: Inspector: RICK ODELL City Of: COPPELL