Loading...
Huntington-AG 920908 (2) AGENDA REQUEST FORM .r,,. c^,.'.o,,,, L ._5 Consider approval of a pre]imlua~y plat~o~Parks of Coppell - Tract IIl,/toc. ated at the southwest corner of Parkway Boulevard and D~nton ~ap R~o_~d, at the _r~quest o~ Dan Dowdey and Associates. SUBMt-iiED EVALUATION OF ITEM: Date of Planning & Zoning Cc---~ssion Neeting: Decisioo of Planning & Zoning Coem~ssion: STAFF RFP.: Gary L. Sieb, planning Director OTHER REP.: DATE: August 20, 1992 Approved (4-1) Cross opposed, v/th the follmetng conditions: 1) single story houses, not to exceed 25 feet in height, will be built on all perimeter lots and on the high school access road, Parkway Boulevard and Denton Tap 2) wall adjacent to high school will be constructed of same color brick, 3) top of screening wall will be a minimum of 8 feet above crown of the high school drive, no side yard fences extendin8 to thiS wall will exceed that height 4) columns of screening wall will duplicate high school columns, if possible (continued on please see attached staff report for further detaila. BUDGET AldT. AMT +/- BUDGET LEGAL REVIEW BY: 5) landscaping, irrigation system, and water meter will be installed on school side of wall at developers expense 6) school will maintain all landscaping outside wall adjacent to school properly, 7) landscaping adjacent to school wall will conform to streetseape plan guidelines, 8) appearance of each side of wall adjacent to school property responsibility of each entity; construction maintenance (if wall is physically damaged) of entire wall responsibility of homeowners association, 9) concept plan for pedestrian access to high school property including additional landscaping and screening provisions will be finalized prior to final plan and plat submittal; 10) trees on building site may be moved to school site at school's expense, 11) if the hill is removed, restricted access across Parkway Boulevard between the hours of 8:00 a.m.-9:30 a.m., and 2:30 p.m.-4:00 p.m. M-F, 12) any trees removed as the result of development or construction of homes be replaced caliper inch per caliper inch, (per landscape ordinance) 13) and ensure there is a 10 foot utility easement on all non-alley lots CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT PARKS OF COPPELL, TRACT III ~ PRELIMINARY PLAT P & Z HEARING DATE: August 20, 1992 C. C. HEARING DATE: September 8, 1992 LOCATION: The southwest corner of Parkway Boulevard and Denton Tap Road. SIZE OF AREA: 26.244 Acres, containing 86 single-family lots. REQUEST: Approval of a preliminary plat of Parks of Coppell, Tract III. APPLICANT: R. T. C. (Owner) 8080 Park Lane Suite #700 Dallas, TX 75231 Dan Dowdey Associates (Engineer) Mr. Bill Anderson 16250 Dallas Parkway Suite #100 Dallas, Tx 75248 214 - 931 - 0694 HISTORY: On May 21 and again on July 16, Planning Commission denied both a zoning request and a preliminary plat on this parcel. TRANSPORTATION: Denton Tap Road is a six-lane divided thoroughfare (P6D) contained within a 100 foot right-of-way; Parkway Boulevard is a four-lane divided street (C4D) contained within an 88 foot right-of-way. ITEM 6 SURROUNDING LAND USE & ZONING: North - Andrew Brown Park & vacant land; TC South - vacant land; C East - vacant & City Hall; West - High School; C COMPREHENSIVE PLAN: The Comprehensive Plan appropriate for this area. shows Town Center uses as most ANALYSIS: If the zoning case associated with this plat is approved, then the subdivision is also recommended for approval based on issues concerning the hill, alleys, building heights, homeowners maintenance areas, etc., being formally resolved. If alleys are not required, ten foot easements need to be provided on those lots without alleys. ALTERNATIVES: I) Approve the preliminary plat 2) Deny the preliminary plat 3) Modify the preliminary plat ATTACHMENTS: 1) Preliminary Plat park$3.sff