Loading...
Huntington-CS 931001DEVELOPMENT FEES PROJECT NAME: ENGINEER: REVISION DATE: Huntington Ridge Dan M. Dowdey 10/1/93 SENT 1/25/93 1/25/93 1/25/93 1/25/93 1/25/93 2/24/93 6/3/93 6/25/93 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Irrigation Street Escrow Street Cut Permit Overtime Inspection Overtime Inspection Overtime Inspection Const. Insp.(Screen.Wall) Grading Inspection TOTALS ASSESSED FEE $6,000.00 $58,500.00 $18,000.00 $1,091.55 $3,803.80 $10,010.66 N/A N/A $116.00 $156.00 $130.00 $2,383.66 $2,400.00 Total Fees 02,591.67 AMOUNT PAID DATE $6,000.00 2/15/93 $58,500.00 2/15/93 $18,000.00 2/15/93 $1,091.55 2/15/93 $3,803.80 2/15/93 $10,010.66 2/15/93 $116.00 3/15/93 $156.00 6~29~93 $130.00 7/27/93 $2,383.66 6/29/93 $2,400.00 2/1/93 Fees Paid Amount Owed $102,591.67 $0.00 2/1 O/93 12/12/92 2/25/93 11/24/92 Includes irrigation impact See Stonemde.xls for additional fees Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. NOTES 8/19/93 6/24/93 2/22/93 9/7/93 Prior To Final Acceptance As-Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Escrow ($576.00)