Loading...
Huntington-CS 940609June 9, 1994 The City With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 "~.:~:_ --L ,JU t ]99 PUBLIC WORKS Mr. Bill Anderson Dowdey, Anderson and Associates, Inc. 16250 Dallas Parkway Suite 100 Dallas, TX 75248 Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calcuhtions for Huntington Ridge Replat Lot 32, Block A. Please provide a check made payable to the City of Coppell in the amount of $2,385.00 and forward it to Mr. Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer cc: Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: Project.' June 9, 1994 Huntington Ridge Replat Lot 32, Block A TOTAL AMOUNT FEES DUE DUE PRIOR TO COUNCIL APPROVAL Water hnpact Fee $ 650.00 $ 650.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 -0- (100% due at Issuance of Building Permit) Wastewater Impact Fee $ 450.00 $ 450.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $100.00 -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $ 50.00 4)- (100% due at Issuance of Building Pemfit) Water Meter Fee (Domestic) $ 22.25 -0- (100% due at Issuance of Building Permit) Water Meter Deposit (Residemial) $ 30.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit -0- -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee $1,285.00 $ 1,285.00 (100% due prior to Council Approval) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 2,687.25 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 2,385.00 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submiued, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM D ATE: TO: FROH : RE: June 3, 1994 Engineering Department~ ~ PublicWorksStaff ~'~ Development Fees for Huntington Ridge Replat Lot 32 Block A The following fees should be assessed and collected referenced project. Water Impact Fee: 1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's on the above Total 1 ESU's ~ $650.00 ea = S 650.00 100% due prior to Council approval of the final plat. Wastewater Impact (city) - 5/8" x 3/4" Domestic Meter/s = Total 1 ESU's ~ $450.00 ea = 1 ESU's $ 450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 1 Connections ~ $100.00 each = $ 100.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 1 Connections ~ $100.00 each = $ 100.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/10t = $ 50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) ~ - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = $ 22.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Deposit (Residential) 1 Meters ~ $30,00 ea = $ 30.00 100% due prior to issuance of building permit. Water Meter Deposit (Multi-F~m{l¥ or Non-Residential) Meters @ $35.00 ea = $ 100% due prior to issuance of water meters. Irrigation NeterDeposit __ Meters @ S35.00 ea = $ 100% due prior to issuance of water meters. For tho~s ~velo~snts having preliminary plat approval prier Co June 23, 1992 t:~e following assessment is determined= R~identisl Lots at $150.00 each , ~.. Unl~m (M~l~i family) ~t $7~.00 each ~ior to c~cil ep~vel of final plat. ~0% ~lnln~ ~h~ll be ~d by the BUilder aC ~uch ti~ as a ~uildln~ ror~ho~edevelop~entm havlngpreltmlnarypla~ approval afeerJ~ne 23, R~sldentlel Late at $350.00 each - $ ..... , Unt~ (WulCt-Fa~tly) at $350.00 each - $ $0% of 8he~ou~t a~ified~bove shall be~idbythe~velo~r~ior to C~noil apparel of final plat. For thee develop~ent~ havtng p~eltwdnaryplat app~ovaI after O~o~r I ~sidenClal ~ts at $1,285.00 e~ch - ~ ~l~s (Nul~i-F~il~ ~= $i,285.00 each - ~ 100% of ~e ~nt ~ified ~ve ~hall ~ ~td by the ~velo~r ~ior ~o ~uncil ap~vel of final pl~t. Shall ~e emeesaed ~nd p~id prior to final ~e li~htin~ plan for ~e ~med ~ject. Ones plan