Huntington-CS 940603COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
June 3, 1994
Engineering Department~ ~
Public Works Staff ~ff'~
Development Fees forHuntington Ridge Replat Lot 32 Block A
The following fees should be assessed and collected
referenced project.
Water Impact Fee:
1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's
on the above
Total 1 ESU's ~ $650.00 ea = S 650.00
100% due prior to Council approval of the final plat.
Wastewater Impact (city)
1 - 5/8" x 3/4" Domestic Meter/s =
Total 1 ESU's ~ $450.00 ea =
1 ESU ' s
450.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
1 Connections ~ $100.00 each = $ 100.o0
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
1 Connections @ $100.00 each = $ 100.00
100% due prior to issuance of building permit.
(Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (All Development)
1 lots ~ $50.00/lot = $ 50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 5/8" x 3/4" Domestic Meters ~ 22.25 ea = $ 22.25
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Deposit (Residential)
1 Meters ~ $30.00 ea = $ 30.00
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-F~m{ly or Non-Residential)
Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Irrigation Meter Deposit
Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Development Fees
Page $
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
Residential Lots at $150.00 each = $
units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
1 Residential Lots at $1,285.00 each = 5~
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.