Loading...
Jefferson-CS 951113COPPELL ENGxNEERING UTIL~T~EB DXV~B~ON MEMORANDUM DATE: November X3, X995 TO: Carolyn Bebermeyer, Accounting FROM: Howard Pafford, Utilities RE: Reimbursement A~n At Please submit a copy of this memo and a reimbursement check for the amount of $7,817.30 to J.P.I. Construction, Inc. 600 E. Las Colinas Blvd. suite 1800 Irving, TX 75039. This refund represents water meter assessment fees of $617.30 water impact fees in the amount of $7,200.00 for two 2" irrigation meters which have been returned to us. If you have any questions, please give me a call. and HLP/dg DAT~: ISSUED FROM SERVICE~']~ER DIVISION · TO: COST OF .~L4,'rF_.RLa~: $ NOTE: R~C~: A'I'rACI~aD YES NO BF_.FOILE FINAL INSPECTION OF T~E METER & SE'i'I~G C.~.N' BE COMPLETED, T]~ BACI~LOW PREVENT/ON DEVICE MUST BE TV_S-l'~',l') BY A CER'I'I~FI~D BACX. FLOW PREVENTION DEVICE DIVISION SU~F. RVi~OR: RTDIVIDUAL AND/OR COMPANY REP]~F-qENTATIVE: DATE: ....... ..: .-.~- ~ ; . ~'.~, , ,.. DISK 4 FORMS ISSUE DEVELOPMENT FEES PROJECT NAME: ENGINEER: REV S ON DATE: Jefferson@Riverchase Nelson Corporation 10/31/95 SENT 11/1/94 4/4/95rev. 11/1/94 4/4/95rev. 11/1/84 4/4/95rev. 6/26/95 7/3/95 7/14/95 7/17/95 7/24/95 7/31/95 8/7/95 8/14/95 8/21/95 8/28/95 ASSESSMENT Park Fee ($496,010.00) Water Impact Fee ($46,150.00) Wastewater Imp. ($22,500.00) ;Street Sign- ..... Street Light Construction Inspection Irrigation Street Escrow Overtime Inspection(8/24) Overtime Inspection (7/1) Overtime Inspection (7/8) Overtime Inspection (7/15) Overtime Inspection {7/22) Overtime Inspection (7/29) Overtime Inspection (8/5) Over~ime Inspection (8/12} Overtime Inspection (8/19) Overtime Inspection (8/26) TOTALS ASSESSED FEE $496,010,00 $56,550.00 $22,500.00 $1,833.64 $120.00 $90.00 $60.00 $180.00 $120.00 $150.00 $120.00 $180.00 $120.00 $90.00 Total Fees $578,123.54 AMOUNT PAID DATE $496,010.00 6/1/95 $56,550.00 6/1/95 $22,500.00 6/1/95 $1,833.64 6/1195 $60.00 8/3/95 $180.00 8/3/95 $120.00 8/18/95 $120.00 8/18/95 $180.00 9/5i95 $120.00 9/5i95 $90.00 10/3195 Fees Paid Amount Owed $577,763.64 $360.00 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Meint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Ufllitiea Bond Recd. Irrigation Plan Approved Eroeion Control Maint. Trap Deposit Impound Fee Boarding Fee Rabies Vaccine Permit ( ) Food ( Animat Water Meter Sales Water Meter Deposit Water Sales Date: Project Name: Project / / METER COST: 9 of Meters Sizes Meter z/_ :z-r,-¢, Cost Per Cost Total Total Cost of Meters Total Meter Inspection Fees ~__@ $100.00 ea. '~o.~.al Meter Osposits ~:~:~ ~ $ ..oo .. Note: 1) ~ 70,00- fees ~s~ ~e ~d ~d ~ inspection of ~e '~er Se~" (induing ~l~s, piping, & ~le ~e~) ~s~ be c~le~ed ~rior ~o issu~ce of ~ers. For ~es~ons rela=ed ~o ~is asses~n= con=ac= Wa~er U~li~ies Superin=en~n= a= (214) 304-3545. ~s~ ~so ~a~ pe~= for irriga~on s~st~ from Bulling Inspec~ons Dep~nt before ~ers ~ be issued. 2) Before final meter inspect. Son is c~m~le~ed, all backfl~w prevent. Son devices musk be =es~sd by a certified bae. kfl~wptevention device tester. Disk 4 Forms (Assess)