ST9302-UP 991021 (2)NOTIC
During the next few days,
DATE
KMG
CDS ~
GDC
Coppell will be installing a 3 Lo
along the north side of Sandy PJC
front of the shopping center at AFL
corner of Samuel and Sandy
We will be closing each drivew
through. Only one driveway at
closed and each driveway will be reopened as
soon as possible.
Thank you
understanding.
· ·
mconvenlence.
for your patience and
We apologize for the
City of Coppell Engineering Dept:
972-304-3679
/
NOTICE
During the next few days, the City of
Coppell will be installing a 30" water line
along the north side of Sandy Lake Road in
front of the shopping center at the northeast
corner of Samuel and Sandy Lake Roads.
We will be closing each driveway as we pass
through. Only one driveway at a time will be
closed and each driveway will be reopened as
soon as possible.
Thank you
understanding.
· ·
mconvemence.
for your patience and
We apologize for the
City of Coppell Engineering Dept:
972-304-3679
/