Loading...
Huntington-CS 930125 (2)P,O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Bill Anderson Dan M. Dowdey & Associates 16250 Dallas Parkway, Suite 100 Dallas, TX 75248-2684 RE: Huntington Ridge Development Fee Assessment Dear Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the development fee calculations for Huntington Ridge. P!ea~e provide a check made payable to the City of Coppall in the amount of $87,395.35 plus 2% of the construction cost and forward it to Mr. Alan Johnson, Assistant Finance Dkector, Finance Department, along with a copy of the fee assessment list. This should be provided prior to City Council approval of the final plat. Also, please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. Please provide a copy of your paid receipt to our offices. Copies of your receipts will help us verify payment of the required fees and assure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. City Engineer cc: t~ve Goram, Director of Public Works Alan Johnson, Assistant Finance Director Oreg Jones, Acting Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMF~NT Date: January 25, 1993 Huntington Ridge Park Fee (50% due prior to Council Approval) (50% due at Issurunce of Building Permit) Water Impact Fee* (100% due prior to Council Approval) Water Tap ln~l~tlon Fee (100% due at Issuance of Building Permit) Wastewater Impact Fee (100% due prior to Council Approval) Sewer Tap Inspection Fee (100% due at Issuance of Building Permit) Utility Final l~mpection Fee (100% due at Issuance of Building Permi0 Water Meter Fee (Lots) (100% due at Issuance of Building Permi0 Water Meter Fee (Irrigation) (100% due at Issuance of Water Meters) Water Meter Deposit (100% due at Issuance of Building Permi0 Irrigation Meter Deposit (100% due at Issuance of Water Meters) Street Sign Fee (100% due prior to Council Approval) Street 1,1_~ht Fee (100 % due prior to Council Approval) Construction Inspection Fee (2% of Project Cost due prior to Preconstruction Meeting) Total TOTAL $ 12,000.00 $ 58,500.00 $ 8,200.00 $ 18,000.00 $ 8,00O.00 $ 4,000.00 $ 1,780.00 $ 314.00 $ 2,40O.00 $ 70.00 $ 1,091.55 $ 3,803.80 $118,159.35 AMOUNT DUE PR~R~ ~ APPROVAL $ 6,000.00 58,500.00 -0- 18,000.00 -o- -o- -o- -o- -o- 1,091.55 3,803.80 $ 87,395.35 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ *This amount includes 2 - 1 1/2" irrigation meters. 87,395.35 +2%inspeaionfee