Huntington-CS 930122PUBLIC ~ORKS
The following fees
referenced project.
January 22, 1993
Ken Griffin, City En~i~er
Public Works Staff~~~.~
Development Fees for~untington Ridge
should be as~esse~ ~and
collected on
the above
Water I~pact Fee=
80 - 5/8" x 3/4" Domestic Meter/s = 80 ESU's
2 - 1 1/2" Irrigation Meter/s = 10 ESU's
Total 90 ESU's ~ $650.00 ea ~ $ 58.500.00
100% due prior to Council approval of the final plat.
WastewaterImpact
80 - 5/8" x 3/4" Residential Meters =
Total 80 ESU's ~ $225.00 ea = $
100% due prior to Council approval
80 ESU's
18,000.00
of the final plat.
Water Tap Inspection Fee
82 Connections 6 $100.00 each = $ 8,200.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
80 Connections ~ $100.00 each = $ 8,000.00
100% due prior to issuance of building permit.
utility Final Inspection Fee
~ lots ~ $50.00/l°t , = $ 4,000.00
100% due prior to issuance of building permit.
water Meter Fee (Lots)
0~9___~8" x 3/4~ Residential Meters
100% due prior to issuance of building permit.
$ 1,780.00_
pater Meter Fee (Irrigation)
~ $ 157.00 ea
- 1 I/2" Irrigation Meters
100% due prior to issuance of water meters.
~ater Meter Deposit
Residential - 80 meters ~ $30.00 ea.. = $ 2,400.00
100% due prior to issuance ob building permit.
Xrrigation
~ meters @
100% due prior
$ 35.00 ea = $ 70.00
to issuance of water meters.
mtreet Lighting Fee
mhall be assessed and paird prior to final acceptance of project.
This fee cannot be assessed until after TU Electric
submits the lighting plan for the propsed project. Once
plan is submitted $292.60 per light will be assessed.
m~reet Signs Fee
~ attached Street Sign Assessment sheet.
~)% due prior to final acceptance of project.
Fee
~--~ Residential Lots at $150.00 each = $ 12,000.00 . _ Units (Multi family) at $75.00 each = $