Loading...
Huntington-CS 930122PUBLIC ~ORKS The following fees referenced project. January 22, 1993 Ken Griffin, City En~i~er Public Works Staff~~~.~ Development Fees for~untington Ridge should be as~esse~ ~and collected on the above Water I~pact Fee= 80 - 5/8" x 3/4" Domestic Meter/s = 80 ESU's 2 - 1 1/2" Irrigation Meter/s = 10 ESU's Total 90 ESU's ~ $650.00 ea ~ $ 58.500.00 100% due prior to Council approval of the final plat. WastewaterImpact 80 - 5/8" x 3/4" Residential Meters = Total 80 ESU's ~ $225.00 ea = $ 100% due prior to Council approval 80 ESU's 18,000.00 of the final plat. Water Tap Inspection Fee 82 Connections 6 $100.00 each = $ 8,200.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 80 Connections ~ $100.00 each = $ 8,000.00 100% due prior to issuance of building permit. utility Final Inspection Fee ~ lots ~ $50.00/l°t , = $ 4,000.00 100% due prior to issuance of building permit. water Meter Fee (Lots) 0~9___~8" x 3/4~ Residential Meters 100% due prior to issuance of building permit. $ 1,780.00_ pater Meter Fee (Irrigation) ~ $ 157.00 ea - 1 I/2" Irrigation Meters 100% due prior to issuance of water meters. ~ater Meter Deposit Residential - 80 meters ~ $30.00 ea.. = $ 2,400.00 100% due prior to issuance ob building permit. Xrrigation ~ meters @ 100% due prior $ 35.00 ea = $ 70.00 to issuance of water meters. mtreet Lighting Fee mhall be assessed and paird prior to final acceptance of project. This fee cannot be assessed until after TU Electric submits the lighting plan for the propsed project. Once plan is submitted $292.60 per light will be assessed. m~reet Signs Fee ~ attached Street Sign Assessment sheet. ~)% due prior to final acceptance of project. Fee ~--~ Residential Lots at $150.00 each = $ 12,000.00 . _ Units (Multi family) at $75.00 each = $