Loading...
Huntington-CS 930122 (2) COPPELL PUBLIC WOHKS DATE: January 22, 1993 . ~' IL TO= Ken Griffin, City En~r ~1 referenced project. the above Water Impact Fee: 80 - 5/8" x 3/4" Domestic Meter/s = 80 ESU's 2 - 1 1/2" Irrigation Meter/s = 10 ESU's Total 90 ESU's ~ $650.00 ea = $ 58,500.00 100% due prior to Council approval of the final plat. Waatewater Impact 80 - 5/8" x 3/4" Residential Meters = 80 ESU's Total 80 ESU's ~ $225.00 ea = $ 18,000.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 82 Connections ~ $100.00 each = $ 8,200.00 100% due prior to issuance of building permit. (Or in the case of the irrigation meter-prior to issuance of meter). Sewer Tap Inspection Fee 80 Connections ~ $I00.00 each = $ 8,000.00 100% due prior to issuance of building permit. Utility Final Xn,spection Fee 100% due prior to issuance o£ building pez~nit. Water Meter Fee (~ota) 4- 80. - 5/8' X 3/ .. Residential Meters ~ ~ 100% due prior to issuance of building permit. Water Meter Fee (Irrigation) ea = 2 1 1__~_~_~ Irrigation Meters @ $ 157.00 ~ 100% due prior to issuance of water meters. Water Meter Deposit Residential - 80. meters ~ $30.00 ea.= $ 2,400.00.. 100% due prior to issuance ob building permit. Irrigation 2 meters @ $ 35.00 ea.= $ 70.00 100% due prior to issuance of water meters. street Lighting Fee Shall be assessed and paird prior to final acceptance of project. Note: This fee cannot De assessed until after TU Electric submits the lighting plan for the propsed project, once plan is submitted $292.60 per light will be assessed. street signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Park Fee Residential Lots at $150.00 each ~ Units (Multi family) at $75.00 each STREET SIGN ASSESSMENT for Huntington Ridge The following assessment is being made in accordance with the City of Cop~ell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those s~gn materials required are based on current pricing which is reviewed on a regular basis. SiGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $53.10 11 $584.10 Speed Limit $63.54 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 1 11.60 5 484.25 1 11.60 OTHER NO outlet 11.60 TOTAL $1,091.55 Cost breakdowns may be obtained from Public Works by written request. Revised 12/15/92 50% of the amount specified above shall be paid by the Developer~ prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/dm cc: Steven G. Goram Director of Public Works DEVFEE$.HLP