Huntington-CS 930122 (2) COPPELL PUBLIC WOHKS
DATE: January 22, 1993 . ~' IL
TO= Ken Griffin, City En~r ~1
referenced project.
the above
Water Impact Fee:
80 - 5/8" x 3/4" Domestic Meter/s = 80 ESU's
2 - 1 1/2" Irrigation Meter/s = 10 ESU's
Total 90 ESU's ~ $650.00 ea = $ 58,500.00
100% due prior to Council approval of the final plat.
Waatewater Impact
80 - 5/8" x 3/4" Residential Meters = 80 ESU's
Total 80 ESU's ~ $225.00 ea = $ 18,000.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
82 Connections ~ $100.00 each = $ 8,200.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
80 Connections ~ $I00.00 each = $ 8,000.00
100% due prior to issuance of building permit.
Utility Final Xn,spection Fee
100% due prior to issuance o£ building pez~nit.
Water Meter Fee (~ota)
4-
80. - 5/8' X 3/ .. Residential Meters ~ ~
100% due prior to issuance of building permit.
Water Meter Fee (Irrigation)
ea =
2 1 1__~_~_~ Irrigation Meters @ $ 157.00 ~
100% due prior to issuance of water meters.
Water Meter Deposit
Residential - 80. meters ~ $30.00 ea.= $ 2,400.00..
100% due prior to issuance ob building permit.
Irrigation
2 meters @ $ 35.00 ea.= $ 70.00
100% due prior to issuance of water meters.
street Lighting Fee
Shall be assessed and paird prior to final acceptance of project.
Note: This fee cannot De assessed until after TU Electric
submits the lighting plan for the propsed project, once
plan is submitted $292.60 per light will be assessed.
street signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Park Fee
Residential Lots at $150.00 each ~
Units (Multi family) at $75.00 each
STREET SIGN ASSESSMENT
for Huntington Ridge
The following assessment is being made in accordance with the City
of Cop~ell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those s~gn materials required are based on
current pricing which is reviewed on a regular basis.
SiGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10 11 $584.10
Speed Limit $63.54
Yield $58.56
Stop $65.12
Street Name $11.60
Stop & Street Combo $96.85
1 11.60
5 484.25
1 11.60
OTHER
NO outlet
11.60
TOTAL $1,091.55
Cost breakdowns may be obtained from Public Works by written
request.
Revised 12/15/92
50% of the amount specified above shall be paid by the Developer~
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/dm
cc: Steven G. Goram
Director of Public Works
DEVFEE$.HLP