Loading...
Jefferson-CS 950404 (2) Coppell, Texas 75019 214-462-0022 April 4, 1995 Nelson Corporation 5999 Summersside Drive Suite 202 Dallas, Texas RE: Fee Assessment Dear Sir: REVISED/ a copy of Enclosed is a copy of the City of Coppell Development Fee the Development Fee Calculations for the Jefferson ~ Riverchase addition. Please make payment to the City of Coppell in the amount of $575.060.00 and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection fee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/Dir. Public Works/City Engineer CC: Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager CITY OF COPPELL DEVELOPMENT FEES Date: April 4, 1995 Project: Jefferson @ Riverchase TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APeaOVAL Water Impact Fee 56,550.00 56~50.00 (100% due prior to Council Approval) c~,~, ~9 Water Tap Inspection Fee ( ' 600.00~ ~)~,, -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee 22,500.00 22,500.00 (100% due prior to Council Approval) ~-~'c.~ Sewer Tap Inspection Fee -0- 41- (100% due at Issuance of Building Permit) Utility Final Inspection Fee 41- -0- (100% due at Issuance of Building Permit) ~ Water Meter Fee (Domestic) ( 41- (100% due at Issuance of Water Meter) (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation&Fire) ~-Cf. C~6~.~.~ ~ ~0ttt0 41- (100% due at Issuance of Water Meters) Irrigation Meter Deposit ~'"~.00 ~ ~0~,,- ~ 41- (100% due at Issuance of Water Meters) ~ Street Sign Fee N/A 41- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee (100%due prior to Council Approval) 496,010.00 496,01,0.00 Street Escrow N/A (100% due prior to Council Approval) Construction Inspection Fee need submittal of 1 8 ~ 3. (ot~ 41' (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $587,709.36 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $575,060.00 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. ~ -~"]{z;t ~5~, (..o COPPELL PUBLIC wORKS MEMORANDUM DATE: November 1, 1994 TO: Mike Martin, E.I.T. FROM: RE: Howard Pafford, Utilities Superintendent Development Fees for Jefferson ~ Riverchase The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 2 4"  - 2" 2 - 8" Total ~7 Domestic Meter/s = 50 ESU's Irrigation Meter/s = ~ESU's Fireline Meter/s = 5 ESU's Esu's ~ $650.00 ea : $ , · b-~lgSO'~ 100% due prior to Council approval of the final plat. Wastewater Impact 2 4" Total 50 Domestic Meter/s = 50 ESU's ESU's @ $450.00 ea = 22,500.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 Connections @ $i00.00 each = $ ~0_.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Water Meter Fee (Domestic) 2 - 8"x4" Domestic/Fireline Meters $ 5,572.28 = $ 11,144.76 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation) /73. ~ ~C{ _ 2" Irrigation Meter/s $ ~e~ 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) ~Meters @ $35.00 em = $70.00 100% due prior to issuance of water meters. Irrigation Meter Deposit {~0.0o ~ Meters @ $35.00 em = $~U~ 100% due prior to issuance of water meters. Park Fee J f~-- For those developments having preliminary plat approvaI prior to June 23, 1992 the following assessment is determined: Residential Lots at $150.00 each Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ Development Fees Page 3 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: Residential Lots at $1,285.00 each = $ 386 Units (Multi-Family) at $1,285.00 each = $ 496,010.00 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Development Fees Page 4 STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE No Parking $53.10 Speed Limit $63.54 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 OTHER QUANTITY EXTENDED PRICE TOTAL Cost breakdowns may be obtained from request. ~ Public Works by written DEVFEES.HLP Revised 1/14/94