Jefferson-CS 941101COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
November 1, 1994
Mike Martin, E.I.T.
Howard Pafford, Utilities Superintendent
Development Fees for Jefferson ~ Riverchase
The following fees
referenced project.
Water Impact Fee:
2 - 2"
2 8"
Total 71
should be assessed and collected on the above
Domestic Meter/s
Irrigation Meter/s = __
Fireline Meter/s = __
100% due prior to Council
50 ESU's
16 ESU's
5 ESU's
ESU's ~ $650.00 ea = $ 46,150.00
approval of the final plat.
Wastewater Impact
2 - 4"
Total 50
Domestic Meter/s = 50 ESU's
ESU's @ $450.00 ea = 22,500.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
4 Connections ~ $100.00 each = $ 400.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Development Fees
Page 2
Water Meter Fee (Domestic)
2 8"x4" Domestic/Fireline Meters @ $ 5.572.28 = $ 11,144.76
100% due prior to issuance of building permit for'residential only.
Ail other development fees are due prior to issuance'of meter/s.
Water Meter Fee (Irrigation)
2 - 2" Irrigation Meter/s @ $ 189.10ea
100% due prior to issuance of water meter/s.
= $378.20
Water Meter Deposit (Multi-Family or Non-Residential)
2 Meters @ $35.00 ea = $70.00
100% due prior to issuance of water meters.
Irrigation Meter Deposit
2 Meters ~ $35.00 ea = $70.00
100% due prior to issuance of water meters.
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
Residential Lots at $150.00 each = $
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
Residential Lots at $350.00 each = $
Units (Multi-Family) at $350.00 each = $
Development Fees
Page 3
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined~
Residential Lots at $1,285.00 each = $
386 Units (Multi-Family) at $1,285.00 each = $ 496,010.00
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street Sign Assessment sheet.
100% due prior to final acceptance of project.
Development Fees
Page 4
STREET SIGN ASSESSMENT
for
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required, are based on current
pricing which is reviewed on a regular basis.
SIGN
No Parking
Speed Limit
Yield
Stop
Street Name
Stop & Street Combo
UNIT PRICE
$53.10
$63.54
$58.56
$65.12
$11.60
$96.85
OUANTITY
EXTENDED PRICE
OTHER
Cost breakdowns may be
request, j
TOTAL
obtained from
Public Works
by written
DEVFEES.HLP Revised 1/14/94