Loading...
Jefferson-CS 941101COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: November 1, 1994 Mike Martin, E.I.T. Howard Pafford, Utilities Superintendent Development Fees for Jefferson ~ Riverchase The following fees referenced project. Water Impact Fee: 2 - 2" 2 8" Total 71 should be assessed and collected on the above Domestic Meter/s Irrigation Meter/s = __ Fireline Meter/s = __ 100% due prior to Council 50 ESU's 16 ESU's 5 ESU's ESU's ~ $650.00 ea = $ 46,150.00 approval of the final plat. Wastewater Impact 2 - 4" Total 50 Domestic Meter/s = 50 ESU's ESU's @ $450.00 ea = 22,500.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 4 Connections ~ $100.00 each = $ 400.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Water Meter Fee (Domestic) 2 8"x4" Domestic/Fireline Meters @ $ 5.572.28 = $ 11,144.76 100% due prior to issuance of building permit for'residential only. Ail other development fees are due prior to issuance'of meter/s. Water Meter Fee (Irrigation) 2 - 2" Irrigation Meter/s @ $ 189.10ea 100% due prior to issuance of water meter/s. = $378.20 Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters @ $35.00 ea = $70.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 2 Meters ~ $35.00 ea = $70.00 100% due prior to issuance of water meters. Park Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ Development Fees Page 3 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined~ Residential Lots at $1,285.00 each = $ 386 Units (Multi-Family) at $1,285.00 each = $ 496,010.00 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Development Fees Page 4 STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required, are based on current pricing which is reviewed on a regular basis. SIGN No Parking Speed Limit Yield Stop Street Name Stop & Street Combo UNIT PRICE $53.10 $63.54 $58.56 $65.12 $11.60 $96.85 OUANTITY EXTENDED PRICE OTHER Cost breakdowns may be request, j TOTAL obtained from Public Works by written DEVFEES.HLP Revised 1/14/94