Loading...
JWI Addition-CS010615cO131vEi L June t5, 2001 Camille Jurasek 143 Wyrmpage Coppell, TX 75019 RE: JWI Addition, Lot 1, Block 1, Minor Plat (Camille's Italian Restaurant) Fee Assessment Letter Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $5,537.40 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest. Meters will be ordered when these fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, , Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Rhonda Brothers, Engineering Secretary Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services SENT BY: CITY OF C0PPELL; ~_ 972 304 704~; JUL-,~.~0~ 2:~aPM; PA~E 5/5 DEVELOPMENT FEE WORKSHEET PROJECT: JWI Addie'on, Lot 1, Block ], Minor Plat (Camille's Italian Restaurant) DATE: 6/I5/01 Water Impact Fee: Domestic Meter(s): 1 - 1 inch = 2.5 ESU's In'igation Meter(s): 0 = 0 ESU'e 0 ,- 0 ESU'e Fireli~a Meter(s): 0 = 0 ESU' Total #: 2.5 ESU's ~ $450.00 ea. Adjusted Total = (100% due prior to Coum;il approval of the final plat) -$450.00 $1.125.00 $675.00 Water Tap Inspection Fee: Total #: I Connections ~ $50.00 ea. ~amily due prior lo iesuanCe of building permit) (All olher developments due prior to issuonce of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) ~ $62.74 (Single family due prior to ieeuence of building I~ermit) (Ail other developments due prior to issuance of meter) $62.74 IrHgation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) ~ $O.00 Total #: 0 Additional Irrigation Meter(s) ~} . $0.00 Total #: 0 Flreline Meter(s) ~ $0.00 (100% ~lue prior tO issuanoe of water meters) SO.O0 $0.00 $o.oo Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) ~ $35.00 aa. (l~ue prior to issuanCe of water meters) $35.00 Irrigation/Fire Meter Deposit Fee: Total 0: 0 Meter(e) ~ $30.00 ea. (100% due prior to iseuance of water meters) Wastewater Impact Fee: Total Domestic Mete~ E6U's: , , .2..5 $450.00 ea. Adjusted Total = Wastewater Tap Inspection Fee: Total #: I Conned#ns ~ $fi0.00 ea. (100% due prim' to iesuence of building permit) $0.00 -$450.00 $1,125,00 $675.00 $50.00 Utility Final Inspection Fee (All developments): Total #: 1 Lots ~ $50.00 ea. (100% due prim' to issuance of building permit) ° This is · credit because there wal an existing 3/4' water meter on site $50.00 Page 1 Project: Date: DEVELOPMENT FEE TABLE JWI Addition, Lot 1, Block 1, Minor Plat (Camille's Italian Restaurant) 6/15/01 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee ' $675.00 $675.00 (100% due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $62.74 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 ' (100% due at Issuance of Water Meter) Wastewater Impact Fee * $675.00 $675.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100 % due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $4,187.40 $4,187.40 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project II Street Sign Fee Information not Available (100% due prior to Acceptance of Project [[ Construction Inspection Fee Information not Available TOTAL $5,785.14 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $5,537.40 * See attached Development Fee Worksheet for impact fee calculation. DEVELOPMENT FEES Camille's Italian Restaurant (JWl Addition, Lot 1, Block 1) PROJECT NAME: ENGINEER: OR G NAT ON DATE: 6/15/01 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE 6/15/01 6/15/01 6/15/01 Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone Street Cut Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection TOTALS $675.00 $675.00 7/3/01 $675.00 $675.00 7/3/01 notify street dept. $4,187.40 $4,187.40 7/3/01 $50.00 $5O.OO $62.74 $35.00 Notify utility dept. when meters, taps or deposits are paid $50.00 Total Fees Fees Paid Amount Owed $5,785.14 $5,537.40 $247.74 NOTES Prior To Construction Erosion Control Approved E.P.A,-N.O.I. Recd. Const. Plan Approved Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.