Loading...
ST9302-UP 990226 SANDY LAKE ROAD CONSTRUCTION Progress Meeting Held The 4'h progress meeting was held on February 16, 1999. The main item of discussion was the continuation of the project has been the removal of the old TU power poles along the north side of Sandy Lake Road. The removal cannot take place until Paragon Cable has relocated their lines. Paragon Cable began their relocation on February 24, 1999 and TU Electric will be following rapidly removing the old power poles. This will allow the contractor to begin construction of the 30" water line starting at Denton Tap Road heading eastward to MacArthur Blvd. Utili~ Relocations During the lowering of the 16" water line near MacArthur Blvd., several conflicts were noted that were not apparent on the construction plans prior to the beginning of the project. To insure that disrnptio~. ~f water service wa~ kept to a minimum, the City proposed to install several gate valves on the existing !6" water line. Update #3 gave general locations of those gate valves. However, since that time, it was discovered that the 16" water line would also have to be lowered through the MacArthur Blvd. intersection. To facilitate the work, the City's utility division installed a 12" gate valve and a 16" gate valve at the intersection of MacArthur and Sandy Lake to allow isolation of the system with minimal water disruptiom The 16" gate valve work was performed from midnight until 4:00 a.m. to insure the businesses in the area had water during February 26, 1999 Ken Gri~n, Director of Engineering operating hours. The installation of the gate valves by City utility crews provided direct savings to the City of over $17,000. ,a,.s b~s been nze~t;~oned .i~-~1! of the Lone Star Gas continues to relocate their facilities. There have been several inquiries about the Lone Star Gas line ditch at the southeast corner of Denton Tap and Sandy Lake near CJ's Clubhouse Grill. In conversation with the Lone Star Gas representatives, it is anticipated that they will be completely finished with their relocations and restore the damaged surfaces by April. TU Electric should be completely finished with their relocations by the end of April. One relocation that took place on Saturday, February 6, 1999 was not planned. Those of you trying to travel through the Samuel/Sandy Lake intersection on the evening of February 6 discovered that the intersection was blocked. High winds that evening caused a TU Transmission power pole on the sonth side of Sandy Lake to fall. During the course of the fall, the TU power pole knocked down the traffic light at Samuel and Sandy Lake. Your patience enduring the stop signs at that location was appreciated. Those traffic lights have now been relocated to allow for the construction along Sandy Lake Road. Since Last Update An additional 1850 linear foot of storm drain has been installed bringing the total to 6150 linear foot. Seven inlet boxes have been constructed, chain link fences have been Project ST 93-02 Denton Tap to Mac,4rthur relocated at several locations a...ag Sandy Lake Road and the traffic signals have been relocated at Samuel, Moore and Heartz. Also, 560 feet of new 16" water line was lowered on the east end of the project near MacArthur Blvd. and, as previously stated, the City of Coppell utility crews installed two gate valves. Current Issues At the risk of being redundant for the 4th update, utility relocations continue to be the main issue with the project. The unknown conditions and surprises as we excavate to lower the existing 16" water line, and the ongo,_'ng utfl;.ty rele~tions ass~c'.'ate~ wP& Lc, r.~ Star Gas, TU Electric and Paragon Cable have created some delays in the progression of the project. However as previously stated, there is light at the end of the tunnel because most if not all of the utility relocations on this project will be complete within the next 2 to 3 months. I have a complaint - What do I do ? If I failed to mention in the prior updates let me state that I appreciate the patience already exhibited on this project by the adjacent residents and the traveling public. To date there have been 27 inquiries concerning this project. Of those 27 inquiries, only 6 have been directly related to our contractor. The remaining 21 inquiries have been directed toward activities taking place or created by the franchise utility com~an";cs relocating their lines. Those range from sight visibility problems to unsecured holes left in the ground. Several of you along Sugarberry should have received a letter from the City stating that we are aware of some property damage to fences during the construction of the storm drain adjacent to the fences. Please be assured that any damage that took place will be repaired to a condition that is as good or better than it was prior to construction. February 26. 1999 Ken Griffin. Director of Engin, eering In the Future In the coming month the contractor will begin relocating the existing 16" water line generally located near Moore Road and Sandy Lake Road. Installation. of the new 30" water main will begin at Denton Tap and move eastward to MacArthur. The important issue about the 30" water line is that it will become the main transmission line to the new elevated storage tank on the west side of Coppell. If you have not noticed it yet, the tank is located south of the Royal/Sandy Lake intersection. The tank has a 2 million gallon capacity and should help some water issues during the summer months. ~lowever, a~. always, the City;s Water Conservation Plan goes into effect May 15t~.) As part of the Sandy Lake Road project, the existing earthen channel from Mapleleaf to Sandy Lake will be regraded and lined with concrete. The construction of the concrete lined channel should begin the first week of March. This will eliminate the erosion that has taken place along the banks adjacent to the alleys. Contact Numbers · Stan Phillips, City's Project Inspector 972/745-6592 pager 214/877-3483 · Gary Pryor, Contractor's Superintendent 214/358-6581 · Ken Griffin 972/304-3686 · Mike Martin 972/304-3679 · After hours emergency Police Department 972/304-3610 E-mail addresses (Non-emergenc~) · Ken Griff'm - keriffin(~ci.coooell.tx.us · Mike Martin - mmartin~ci.coppell.tx.us · Lee Allison - lalison~kimley-horn.com City's consultant w/Kitnley-Horn Engineers · Robert Weber - robertw8~airmail.net Project Manager w/Ed Bell Construction Web site · www.ci.coppell.tx.us (under City Services) Project ST 93-02 Denton Tap to Mac,4rthur