Loading...
Kiddin' Around-CS 991216COPPELL, TEXAS75019 RO. Box 478 Coppell, Texas 75019 972~162-0022 December 16, 1999 Jeff Jones Kiddin' Around LLC. 125 Tabark Circle Coppell, TX 75019 RE: Kiddin' Around Fee Assessment Letter Dear Mr. Jones: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $4,311.84 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Depath~ient will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Kent M. Collins, P.E. Civil Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE WORKSHEET PROJECT: DATE: 12/16/1999 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 1 inch = 2.5 ESU's 1 - 1 inch = 2.5 ESU's 0 = 0 ESU's 0 = 0 ESU's Total #: 5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: I Domestic Meter(s) @ $56.44 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireli~e Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $56.44 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total 0: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigatio~EFire Meter Deposit Fee: Total #: I Meter(s) @ $30.00 ea. ( 100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 2.5 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $2,250.00 $100.00 $56.44 $56.44 $o.oo $o.oo $35.00 $30.00 $1,125.00 $50.00 $50.00 Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) SWeet Lighting Fees: Assessed for lighting in rite City's right-of-way. This fee cannot be assessed until after T.U. Electdc submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $0.00 $936.84 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 DEVELOPMENT FEE TABLE Project: Kiddin' Around Date: 12/16/1999 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $56.44 (100% due at Issuance of Water Meter) Water Meter Fee ClrrigationfFireline) $56.44 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,125.00 $1,125.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) I Park Fee $0.00 . $0.00 (100 % due prior to Council Approval) Roadway Impact Fee $936.84 $936.84 (100% due prior to Council Approval) Street Light Fee [nformatiun not Available (100% due prior tO Acceptance of Project Il Street Sign Fee Information not Available (100% due prior to Acceptance of Project Construction Inspection Fee Information not Available II rOTAL $4,689.72 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $4,311.84 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Ki~l,'lin' Around DATE: 12/16/1999 ROADWAY IMPACT WEE: ;eiwice Area * 1 ~_~tegory ** Institutional .and Use ** Day Care Clx ! of Students 80 Development Units ** 80.00 Vehicle Miles per Development Unit ** 0.37 Fee per Vehicle Mile *** $300 Roadway Impact Fee due -- (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $8,880.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent Credit for Property per Univest Agreement 89.45 % $7,943.16