Grandy's-CS020904CITY OF COPPELL ENGR. DEPT. e 51'=J9
COPPELL
NO.26B
P.O. BOX 478
2~5 P~ Bhyci
Phmle: (g72)304,,3679
ID04
ENGINEERING DEP. d. RTMENT
FAX COVER SHEET
To; Marc Bentley Frm~ Teresa Turner
Fa~. 972-240.O922 Date: 9/4/2002
Phone= pmgos: 5 (including cx)ver she~)
Grandy's Addition
[] As Requested
I hive attached the letter of approval and revised fee assessment table. If
you here Imy questions, ideaee feel free to contaot me at 972-304-368t.
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLE, AEE CALL (972) 304-$679
"City oj'Coppell Eng~naerlng -Excellenc= By Design"
11:1~
CITY OF COPPELL ENGR. DEPT. ~ 5199
DEVELOPMENT FEE WORKSHEET
N0.268
(10(~ due prior to final ~cceSta~l ~ ~lopmel~t)
for ~;~nage in the City's right.of.wey.
(2~ '~ dm,~lo~meflt cost recl~ired f~ I~;vat~ ;m~.ovements)
(4% ~f de~eiopmea! c~st required for pub~;c imp~m, ements)
11:13
CITY OF COPPELL ENGR. DEPT. e 5199
DEVELOPMENT FEE WORKSHEET
N0.268
[7{)2
PROdECT:
DATE: $O~m~er 2,,t002
Water Iml~
Irrigation Meter(O:
Grnm~'s Addition Lot I Bit I. ILE¥1$ED
Fireline Meter(s):
__o ~. o FSU'a
13 ESU'~ ~ $280,00
$3,640.0~
Water Tap lnep~.-Uon faa:
Total
Connections ~ $5000 ea.
S100,00
(All othe! developments due prto¢ to issuance of rr~taf)
.~142,10
Total #: ] Ir¢iffaflon Me~r(s) Q $205.2B
Total ~: 0 Ad,animal Irfi~ation ~t~) ~ , ~0,00
~ue prior ~ Issuaace of ~ler metes)
$~5.28 __
Domestic Water Molar Deposit Fee:
Total #: I ~aatar(~) ~ $30.00 aa.
0,00~ due prio¢ to IssuanCe of wate~ me, erst
$30.O0
IrrlgnlioeAelre Meter Deposit tree:
Total ~: I Metal(s) ~ $30.00 aa,
$3000
,O S280,00 aa.
$L400,00
Tap InSpection Fee:
Total a: t Connections ~ $50.00 Ga.
ClO0~a Oue prior to issuance of buhcling permit)
Ultl~t~ Meal lnspKflon Faa {All deYalopmants):
Total i~: ~ Late ~ $S000 aa,
(IOOTa clua ~ior to issuanCe of buil~hlg !~ecmit]
Park F~ (For Re~identiM DevelepmanK Only): * Pteltmlnarypln! approved:
Single-family 0 $0,00 fief lot
Multi.lamily ~ ~0,00 per umt
(S~ paid prior to Cou~il a~ d ~al plat)
Raadway Impact
(See attacheo fee calCUlatio~$~
Street Lighting Fees:
$0.O0
$3,129.67
Pa~e 1
01×27x2~3 11:13 CITY OF COPPELL ENGR. DEPT. ~ 519~ N0.268
DEVELOPMENT FEE TABLE
Project: Gnmdy's Addition Lot I ~lk I - P~EVISED
Date: Sel~t~mbtr
TOTAL AMOI/NT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
W~tcr Impact ]:ce $3,640.00
(100% due at Issuance of Bu~ldin~ Permit)
Wa~r Tap Inspection Fee $100.00
. (100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $142,10
(100% due at Issuance Of Water Meter)
Water Meter Fee {lrtigation/Fireline) $205.2~
(100% due al Issuance of Water Meter}
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Wa~r Meter}
lrrigation/Fireline Meter Deposit $30.00
(I00% due ax Issuance of Water Meter)
Wastewate~ Impact Fcc
(100% due at lssuanee Of B uildin~t Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit}
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $3, ! 29.67 $3,129.67
'(100% due prio! to Council Approval)
S~'eet Light Fcc Information not Available
( i 00% due prior to Acceptance of Project) I
Street Sign Fcc Infon~ation not Available
{10~. % due prior to Acceptance of ProjecO
Construction Inspection Fee Information not Available
( 100% due I rior to,$ an of Consmaction)
~OTAL AMOUNT DUiK I~RIOR TO ,COUNCIL APPRO, VAL $3,129.67