Loading...
Grandy's-CS020904CITY OF COPPELL ENGR. DEPT. e 51'=J9 COPPELL NO.26B P.O. BOX 478 2~5 P~ Bhyci Phmle: (g72)304,,3679 ID04 ENGINEERING DEP. d. RTMENT FAX COVER SHEET To; Marc Bentley Frm~ Teresa Turner Fa~. 972-240.O922 Date: 9/4/2002 Phone= pmgos: 5 (including cx)ver she~) Grandy's Addition [] As Requested I hive attached the letter of approval and revised fee assessment table. If you here Imy questions, ideaee feel free to contaot me at 972-304-368t. IF YOU DO NOT RECEIVE ALL OF THE PAGES PLE, AEE CALL (972) 304-$679 "City oj'Coppell Eng~naerlng -Excellenc= By Design" 11:1~ CITY OF COPPELL ENGR. DEPT. ~ 5199 DEVELOPMENT FEE WORKSHEET N0.268 (10(~ due prior to final ~cceSta~l ~ ~lopmel~t) for ~;~nage in the City's right.of.wey. (2~ '~ dm,~lo~meflt cost recl~ired f~ I~;vat~ ;m~.ovements) (4% ~f de~eiopmea! c~st required for pub~;c imp~m, ements) 11:13 CITY OF COPPELL ENGR. DEPT. e 5199 DEVELOPMENT FEE WORKSHEET N0.268 [7{)2 PROdECT: DATE: $O~m~er 2,,t002 Water Iml~ Irrigation Meter(O: Grnm~'s Addition Lot I Bit I. ILE¥1$ED Fireline Meter(s): __o ~. o FSU'a 13 ESU'~ ~ $280,00 $3,640.0~ Water Tap lnep~.-Uon faa: Total Connections ~ $5000 ea. S100,00 (All othe! developments due prto¢ to issuance of rr~taf) .~142,10 Total #: ] Ir¢iffaflon Me~r(s) Q $205.2B Total ~: 0 Ad,animal Irfi~ation ~t~) ~ , ~0,00 ~ue prior ~ Issuaace of ~ler metes) $~5.28 __ Domestic Water Molar Deposit Fee: Total #: I ~aatar(~) ~ $30.00 aa. 0,00~ due prio¢ to IssuanCe of wate~ me, erst $30.O0 IrrlgnlioeAelre Meter Deposit tree: Total ~: I Metal(s) ~ $30.00 aa, $3000 ,O S280,00 aa. $L400,00 Tap InSpection Fee: Total a: t Connections ~ $50.00 Ga. ClO0~a Oue prior to issuance of buhcling permit) Ultl~t~ Meal lnspKflon Faa {All deYalopmants): Total i~: ~ Late ~ $S000 aa, (IOOTa clua ~ior to issuanCe of buil~hlg !~ecmit] Park F~ (For Re~identiM DevelepmanK Only): * Pteltmlnarypln! approved: Single-family 0 $0,00 fief lot Multi.lamily ~ ~0,00 per umt (S~ paid prior to Cou~il a~ d ~al plat) Raadway Impact (See attacheo fee calCUlatio~$~ Street Lighting Fees: $0.O0 $3,129.67 Pa~e 1 01×27x2~3 11:13 CITY OF COPPELL ENGR. DEPT. ~ 519~ N0.268 DEVELOPMENT FEE TABLE Project: Gnmdy's Addition Lot I ~lk I - P~EVISED Date: Sel~t~mbtr TOTAL AMOI/NT DUE FEES DUE PRIOR TO COUNCIL APPROVAL W~tcr Impact ]:ce $3,640.00 (100% due at Issuance of Bu~ldin~ Permit) Wa~r Tap Inspection Fee $100.00 . (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $142,10 (100% due at Issuance Of Water Meter) Water Meter Fee {lrtigation/Fireline) $205.2~ (100% due al Issuance of Water Meter} Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Wa~r Meter} lrrigation/Fireline Meter Deposit $30.00 (I00% due ax Issuance of Water Meter) Wastewate~ Impact Fcc (100% due at lssuanee Of B uildin~t Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit} Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $3, ! 29.67 $3,129.67 '(100% due prio! to Council Approval) S~'eet Light Fcc Information not Available ( i 00% due prior to Acceptance of Project) I Street Sign Fcc Infon~ation not Available {10~. % due prior to Acceptance of ProjecO Construction Inspection Fee Information not Available ( 100% due I rior to,$ an of Consmaction) ~OTAL AMOUNT DUiK I~RIOR TO ,COUNCIL APPRO, VAL $3,129.67