Loading...
Grandy's-CS020305D~te ~ 051776 By HA, RRY L mN(i 1022 OR KATHR~I A. IQNEi =,, AUSTIN Ct. 3 -- ('~-~-- ~o-w,,. DEVELOPMENT FEES PROJECT NAME: Grandys' Restaurant (Denton Tap Dev.) ENGINEER: Bentley ORIGINAT ON DATE: 01/29/2002 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Roadway Impact-Zone $3,129.67 rb 03/05/2002 $2,100.00 $1,400.00 01/29/2002 01/29/2002 $3,129.67 EG or Bore Permit Overtime Inspection Water Tap Inspection $100.00 Wastewater Tap Inspection $50.00 Water Meter (Domestic) $142.10 Water Meter (Fire/Irrig) $62.25 Meter Deposit (Domestic) $30.00 Meter Deposit (Fire/Irrig) $30.00 Utility Final Inspection $50.00 Subtotal due to Eng. $3,129,67 TotaI Fees TOTALS $7,094.02 $3,129.67 Fees Paid $3,129.67 $0.00 Amount Owed $3,964.35 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint. January 29, 2002 Marc Bentley, P.E. 702 Gatcwood Drive Garland, Texas 75043 RE: Grandy's Lot l Block 1 (Grandy's/Denton Tap) Fee Assessment Letter Dear Mr. Bentley, Enclosed is a copy of the City of Coppell Development Fee Assessment Table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amouat of $3,129.67 and forward the check to the Engineering Department along with a copy of the Fee Assessment Table. This mount is the portion of the assessed fees that need to be paid prior to Council approval. Also provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. Please note that the Texas Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the issuance ora Building Permit. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 732 Deforest Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please feel free to contact me at your convenience. Sincerely, · , K~na~th M.' Oriffin, P.E: Director of Engineering/Public Works CC: Jennifer Armstrong, Finance Director Mary Beth Spletzer, Admin. Secretary, Building Inspections Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Grandy's Lot I Bll~ 1 (Grandy's) Date: January 29,2002 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $2,100.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $142. I 0 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $62.25 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (I 00% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,400.00 (100% due at Issuance of Buildin$ Permit) Wastewater Tap Inspection Fee $50.00 (I 00% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (I00% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (I 00% due prior to Council Approval) Roadway Impact Fee $3,129.67 $3,129.67 '(100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Proiect) [[ Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $7,094.02 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $3,129.67 DEVELOPMENT FEE WORKSHEET PROJECT: Grandy's Lot I Blk 1 (Grandy's) DATE: January 29,2002 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 1 - 1 1/2 inch = 5 ESU's 1 - 1 inch = 2.5 ESU's 0 = 0 ESU's = 0 ESU's Total #: 7.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 2 Connections @ $50,00 ea, (Single family due pdor to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: I Domestic Meter(s) @ $142.10 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: I irrigation Meter(s) @ $62,25 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0,00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: I Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: I Metar(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 (Due pdor to issuance of building permit) @ $280,00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50,00 ea. '(100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea, (100% due pdor to issuance of building permit) $2,100,00 $100.00 $142.10 $62,25 $0.00 $0.00 $30.00 $30;00 $1,4OO.0O $50.00 $50,00 Page 1 DEVELOPMENT FEE WORKSHEE I' Park Fee (For Residential Developments Only): * Preliminary plat approved: Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due pdor to final acceptance of development) $0.00 $0.00 $3,129.57 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROAD WAY IMPACT FEE CALCULA'i iONS PROJECT: DATE: Grandy's Lot I BIk I (Grandy's) January 29,2002 ROADWAY IMPACT FEE: Service Area * 1 Category ** Commercial Land Use ** Fast Food Building Area (sO 2,866 Development Units ** 2.87 Vehicle Miles per Development Unit ** 3.64 Fee ])er Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit~ x ~Fee per Vehicle Mile/ = $3,129.67, * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) [ AMOUNTDt.]E: $3,129.67