ST9301A-CS 950314 Federal Emergency ManagernenffAgency
Washington, D.C. 20472
Mr. Allen Bud Beene, P.E. 141995 IN REPLY REFER TO:
Director of Public Works Case No.: 95-06-096R
Dallas County Communities: Dallas County and the
411 Elm Street, 4th Floor Cities of Carrollton,
Dallas, Texas 75202 Coppell, and Dallas, Texas
Community Nos: 480165, 480167,
480170, and 480171
Dear Mr. Beene: 316-AD/PRE
This is in regard to your recent submission of data in support of your request for a Conditional Letter of
Map Revision for the above-referenced communities. Our review of the submitted data indicates that we
do not have all the data we requested in our letter dated January 30, 1995. The required data are
described on the enclosed checklist and must be submitted before we can continue our review. Unless
otherwise directed by you in writing, the submitted data and/or fees will not be returned. We will not
begin a detailed review of the submitted data until we receive the requested data.
We have suspended processing of your request pending our receipt of the requested data. After we
receive thc requested data, we will continue our review.
When you write to us about your request, please include the case number shown above in your letter.
If you have any questions about the requested data, please call our Technical Evaluation Contractor,
Michael Baker Jr., Inc., at (703) 960-8800, and ask for Mr. David P. Preusch, P.E., the Revisions
Coordinator for your state.
Sincerely,
HM~C2ra~ 11dK~ ~ t~u;2t~oY~ PB'r~chchief
Mitigation Directorate
Enclosure
cc: Mr. Walter E. Skipwith, P.E.
Vice President
Halff Associates, Inc.
Ms. Jill Jordan
Director of Public Works
City of Dallas
Mr. Timothy M. Tumulty, P.E.
City Engineer
City of Carrollton
V/Mr. Kenneth M. Griffin,
P.E.
Assistant City Manager/Director of Public Works
City of Coppell
Federal Emergency Management Agency
Washington, D.C. 20472
Summary of Additional Data Required to Support a
Conditional Letter of Map Revision
Case No.: 95-06-096R Date: ~R ~L ~, ]9~1~
Requester: Mr. Allen Bud Beene, P.E. Community No.: 480165
Community: Dallas County, Texas
The issues listed below must be addressed before we can continue the review of your request.
We must receive the initial fee, $560, before we will begin our review. For this project to be
exempt from fees and processing costs, you must provide evidence that the project is primarily
intended for flood-loss reduction to insurable structures in the identified flood hazard area that
were in existence prior to commencement of construction of the flood-control project.
Please submit a copy of either a public notice distributed by the community stating its intent to
revise the floodway or a statement by the community that it has notified all affected property
owners.
· Please provide the following documentation as required under Section 65.12 of the National Flood
Insurance Program regulations for the increase in base (10(Y-year) flood elevation (BFE) upstream
of the Sandy Lake Road Bridge:
1. Individual legal notice to each affected property owner within and outside of the community,
explaining the effect of the proposed action on their property.
2. Certification that no structures are located in areas that would be affected by the increased
BFE.
· Ms. C. Jean Hansen signed Form 2 of the Application/Certification Forms. The expiration date
of Ms. Hansen's Professional Engineering License was December 1994. Please provide evidence
this license has been renewed, or resubmit Form 2 signed by another licensed engineer.
Please send the required data directly to our Technical Evaluation Contractor at the following address:
Michael Baker Jr., Inc.
3601 Eisenhower Avenue, Suite 600
Alexandria, Virginia 22304
(703) 960-8800
Attention: Mr. David P. Preusch, P.E.
For identification purposes, you must include the case number referenced above on all correspondence.