Kimbel Addition-CS 970429COPPELL ENGINEERING
UTILITIES DIVISION
MEMORANDUM
DATE:
TO:
FROM:
RE:
April 29, 1997
Larry Davis, Engineering
Larry Smith, Public Works
Walk thru for Papa John's Pizza
A walk-thru on the above referenced project was conducted on
and the items below were found to be deficient.
2.
3.
4.
April 29~ 1997
Need threaded fittings between meter & double check (Irrigation Meter)
Need test results on double check valve.
Need to move large center from over top of grease trap so I can inspect.
Can over double check should be metal SSA not plastic. (replace can)
Please ensure that these items get taken care of and if you have any questions, please
give me a call.
MMC/akl
COPI~X.x, IiiNG~G
UTrt.~.s DIVISION
MIiiMORANDUM
A w~ll~-~--u on the above referenced project was conducled on
and the kerns ' ~
~e. ow were found to be de~cien£.
Plea.se ensu~ that these items get nkm c~ of and if l~u ha~ any qu~tions, please