Loading...
Kimbel Addition-CS 961125November 25, 1996 CharHe Wright Nortex Pizza, L.P. 829 E. woodglen Copper Canyon, TX 7~067 Minor Hat for Kimbei Addition, Lot 9-R (Papa Johng) Development Fee Assessment Dear Mr Wright: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $5,878.10 and forward to the Finance Depath~lent along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our offic so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of t~quired fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely,0 Assistant Ci~ Manager/City Engineer CC; Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FF E TABLE Project: Minor Plat for Kimbel Add!_~,~n, Lot 9-R (Papa Johns) Date: 11/25/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,375.00 $3,375.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $48.30 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigafion/Fireline) $134.93 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $1,125.00 $1,125.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Buildinl~ Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $1,378.10 $1,'378.10 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $6,326.33 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $5,878.10 DEVELOPMENT FEE WORKSHEI=T PROJECT: Minor Plat for gimbel Addition, Lot 9-R (Papa Johns) DATE: 11/25/96 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 1 inch = 2.5 ESU's I - I 1/2 inch = 5 ESU's = ESU's 0 - N/A = ESU's Total #: 7.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat} Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit} (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total 8: 1 Domestic Meter(s) @ $48.30 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: I Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $134.93 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 2.5 @$450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit} 03,375.00 $100.00 $48.3O $134.93 $0.00 $0.00 $30.00 $35.00 $1,125.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEI::T Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit {50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $1,378.10 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Minor Plat for Kim~l ~a,n~,~n, Lot 9-R (Papa Johns) 1112519g ROADWAY IMPACT FEE: Service Area * 3 Cate~or[ ** Commercial Land Use ** Fast Food Restaurant Buildin~ Size (Sq. Ft.) DeveloF~nt Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x O/chicle Miles per Development Unit) x (Fee per Vehicle Mile) = 1,262 1.262 $300 '$1,378.10 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)