Loading...
ST9301A-CS 941221 / Coppelt, Texas 75019 The City With A Beautiful Future 214-462-0022 FAX 214- 393-0948 December 21, 1994 Federal Emergency Management Agency 1725 I Street N. Washington, D.C. 20472 Attn: Mr. Alan Johnson RE: Request for Conditional Letter of Map Revision on the Elm Fork of the Trinity River - Sandy Lake Road Bridge Hydraulic Study (Project #93-01a) Dear Mr. Johnson: I have reviewed the request for a Conditional Letter of Map Revision (CLOMR) dated June 1994, as prepared by Halff Associates, Inc. for Dallas County and the City of Dallas, Texas. I have also met with Jean Hanson to discuss the particulars of the project. Based on the review and that meeting, the City of Coppell supports the request for modification to the 100-year floodplain and floodway to accommodate the proposed improvements to Sandy Lake Road, including the downstream floodplain excavation within the Cities of Dallas and Carrollton. Sincerely, Kenneth M. Griffin, P.E. Asst. City Manager/Dir. Public Works City of Coppell