Loading...
KFC & Pizza Hut-CS 890922AYRBS ASSOCIATES September 22, 1989 City of Co!){~e~ V/ Attn: Ru~ell!)oyle 255 Pa~,gway Blvd Conill, Texas 75019 Re: As-Built Conditions of KFC Restaurants Dear Russell: The attached drawings have been modified to conform to construction records. The field changes are reflected on these drawings. All pavement was installed according to the City approved plans within a tolerance of -+0.20 ?eet. In addition these plans were developed according to the approved preliminary grading and drainage plan for the proposed Sandy Lake Shopping Center. Mr. Ardinger at the time of construction of construction of said shopping center will be adding a storm sewer system to alleviate all drainage problems. Our design was to adhere to the proposed shopping center plans to as not to create future problems. All of this was a result of the D.R.C. meetings with the City Staff and Ginn, Inc. If you should have any questions please contact me at (214) 570-5577. Sincerely, Owen Ayres and Associates, Inc. Robert A. Howman, Senior Technician RAH/jg Owen Ayres & Associates Inc. Englneem / Ptannem / Suweyom BO. Box 612409 Dallas, Texas 75261 2110 Walnut Hill Lane, Suite 134, Las Colinas Irving, Te'~as 75038 (214) 570-5577