KFC & Pizza Hut-CS 890922AYRBS
ASSOCIATES
September 22, 1989
City of Co!){~e~ V/
Attn: Ru~ell!)oyle
255 Pa~,gway Blvd
Conill, Texas 75019
Re: As-Built Conditions of KFC Restaurants
Dear Russell:
The attached drawings have been modified to conform to construction records. The field changes are
reflected on these drawings.
All pavement was installed according to the City approved plans within a tolerance of -+0.20 ?eet. In
addition these plans were developed according to the approved preliminary grading and drainage plan
for the proposed Sandy Lake Shopping Center. Mr. Ardinger at the time of construction of
construction of said shopping center will be adding a storm sewer system to alleviate all drainage
problems. Our design was to adhere to the proposed shopping center plans to as not to create future
problems. All of this was a result of the D.R.C. meetings with the City Staff and Ginn, Inc. If you
should have any questions please contact me at (214) 570-5577.
Sincerely,
Owen Ayres and Associates, Inc.
Robert A. Howman,
Senior Technician
RAH/jg
Owen Ayres & Associates Inc.
Englneem / Ptannem / Suweyom
BO. Box 612409 Dallas, Texas 75261
2110 Walnut Hill Lane, Suite 134, Las Colinas
Irving, Te'~as 75038 (214) 570-5577