Lakeside V2-CS 960731The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-452-0022
July 31, 1996
Mr. Truman C. Edminster, P.E.
Carter Burgess Eingineering
7950 Elmbrook Drive, Suite 250
Dallas, Texas 752474951
RE: Kroger - Final Acceptance
Dear Mr. Edminister:
A final inspection of paving and utilities for the referenced project has been confu'med by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
Sincerely,
cc:
Kenneth M. Griff'm, P.E., Asst. City Manager/City Engineer
Matt Cast, Superintendent of Public Works
Per Birdsall, Interim Street Superintendent
Greg Jones, Chief Building Official
Travis Crump, Acting Fire Marshal
Doug Stevens, Engineering Technician
Terry, Mitchell, Carter & Burgess
file/ldavis/0finalac.ltr