Gibbs Station 1-CS 930204 COPPELL PUBLIC WORKS
project.
referenced
Water Impact Fee=
- Domestic Meter/s =
2 - I 1/2" Irrigation Meter/s =
- Fireline Meter/s
ESU's
10 ESU's
= ESU's
Total I0 ESU's ~ $650.00 ea = $6,500.00
100% due prior to Council approval of final plat.
* This calculation does not include irrigation services.
Water Tap Inspection Fee
2 Connections 6 $100.00 each = $ 200.00
100% due prior to issuance of meter.
Water Weter Fee (Irrigation)
2 - I 1/2" Irrigation Meters ~ $157.00 ea. = $314.00.
100% due prior to issuance of water meters.
Zrrigation
2 meters # $35.00 ea. = $?0.00
100% due prior to issuance of water meters.
HLP/dm
cc= Steven G. Goram, Director of Public Works
GIBBSPH1.HLP