Loading...
Gibbs Station 1-CS 930204 COPPELL PUBLIC WORKS project. referenced Water Impact Fee= - Domestic Meter/s = 2 - I 1/2" Irrigation Meter/s = - Fireline Meter/s ESU's 10 ESU's = ESU's Total I0 ESU's ~ $650.00 ea = $6,500.00 100% due prior to Council approval of final plat. * This calculation does not include irrigation services. Water Tap Inspection Fee 2 Connections 6 $100.00 each = $ 200.00 100% due prior to issuance of meter. Water Weter Fee (Irrigation) 2 - I 1/2" Irrigation Meters ~ $157.00 ea. = $314.00. 100% due prior to issuance of water meters. Zrrigation 2 meters # $35.00 ea. = $?0.00 100% due prior to issuance of water meters. HLP/dm cc= Steven G. Goram, Director of Public Works GIBBSPH1.HLP