Loading...
Lakeside V2-CS 960723COPPELL ENGINEERING STREET DIVISION MEMORANDUM DATE: TO: FROM: RE: July 23, 1996 Larry Davis, Construction Inspector Brent Adams, Street Division Walk thru for Krogers on Sandy Lake Rd. A walk thru on the above referenced project was conducted on July 23, 1996 and the items below were found to be deficient. I. MacArthur North Driveway Ae The curb on the northside of MacArthur's north driveway at Pavers ADA needs to be repaired. South side at the curb return the curb spalled - also seal return. Rout and seal cracks from both paver bands. II. Right Turn Lane on the Southern Most Drive on Ma~Arthur Ce Seal all curb saw cuts Rout and seal cracks on the north and south ends of the paver band. Rout and seal crack on the center line of the drive Seal all saw joints on the project Repair all loose and/or damaged white buttons. Also replace any missing white buttons. Northbound ~ac~rthu~ Left Turn Lane Rout and seal at new concrete to exisiting concrete and curbs. Rout and seal random cracks south of the manhole for 24" cross tow~ and randum cracks off of the cut out for the manhole. IV. Sandy Lake East Driveway Ae Place safe hit posts on each side marking culvert or head wall. Rout and seal random crack east of the center line pavers. Rout and seal between asphalt and concrete along Sandy Lake. Vo Sandy Lake West Driveway A. Finish radius on the west end of the driveway. B. Rout and seal between the asphalt and the concrete along Sandy Lake. C. Will pavement markings be placed on this drive? Please ensure that these items get taken care of and if you have any questions, please give me a call. BA/cg