Loading...
Gibbs Station 1-CS 930201 17/ ,/'~ The City With A Beautiful Future , _.~/?' /,,,--.j February l, 1993 P O Box 478 Coppell, Texas 75019 214-462-0022 Mr. Bill Anderson Dan M. Dowdey & Associates 16250 Dallas Parkway, Suite 100 Dallas, TX 75248-2684 Re: Gibbs Station Phase I Final Acceptance Dear Mr. Anderson: A final inspection of the above-referenced project has been confirmed by representatives of the City of Coppell subject to the various maintenance agreements. The drainage utility and paving has been verified and is in compliance with the City of Coppell standard requirements. Erosion protection will also be maintained until bond expiration. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter. Maturity on the Erosion Control Bond will be two years from this letter. Sincerely, Construction Inspector CC: Steve Goram, Director of Public Works Kenneth M. Griffin, P.E., City Engineer M. Shohre Daneshmand, Civil Engineer Greg Jones, Acting Building Official Chuck Young, C. W. Young Construction Co. Bill Jones, L. H. Lacy