Gibbs Station 1-CS 921204COPP~.T. P~BLIC WORKS
Larry Davis, Construction Inspector I1~ /
Howar. d L. Pafford, Ut£1ities SuperintendentS. ~
Part,al Walk Through for Gibbs Station (Wate~ and
Sanitary Sewer)
A partial walk through was conducted on lots 36 through 41 in
block F of the Gibbs Station subdivision. Field personnel
reported that all water/sanitary sewer components adjacent to or
in the frontage of these lots are in working order.
Please ensure that final release of this project is not granted
prior to a complete walk through being scheduled.
If you have any questions please advise.
HLP/dm
GIBBSSTA.HLP