Loading...
Gibbs Station 1-CS 921204COPP~.T. P~BLIC WORKS Larry Davis, Construction Inspector I1~ / Howar. d L. Pafford, Ut£1ities SuperintendentS. ~ Part,al Walk Through for Gibbs Station (Wate~ and Sanitary Sewer) A partial walk through was conducted on lots 36 through 41 in block F of the Gibbs Station subdivision. Field personnel reported that all water/sanitary sewer components adjacent to or in the frontage of these lots are in working order. Please ensure that final release of this project is not granted prior to a complete walk through being scheduled. If you have any questions please advise. HLP/dm GIBBSSTA.HLP