Loading...
KFC & Pizza Hut-CS 890406TheCity With A Beautiful Future April 6, 1989 Robert Howman Ayres & Associates 2110 Walnut Hill Lane Suite 134 Irving, Texas 75038 RE: Water/Sewer Fees Associated with Kentucky ~Plat Dear Mr. Howman:' P,O. aox 478 Coppell, Texas 75019 ~, 214-462-0022 I have calculated and listed below all water and sewer fees associated with the above mentioned project and at what time those fees are due. Water Availability: For 2888 sq. ft. Build~ng Space 2 $60.00/1000 sq. 50% due prio[ to Council.Approval - $8~._~.._~ 50% due at time of Building Permit ~6.~ Sewer Availability: For 2888 sq. ft. Building Space @ $60.00/1000 sq. 50% due prior to Council Approval - $~_6A .... 50% due at time of Building Permit ~6.64_~ Water Tap Fee: For 1 connection @ ~100.00 each connection $100.00 100~ due prior to Council Approval Sewer Tap Fee: For 1. connection @ $100.00 each connection 100% due prior to Council Approval $100.00 Utility Inspection Fee: For 1 Building @ $75.00 each building 100% due at time of Building Permit ft.. is $173.28 ft. ia $173.28 Al! checks to be made payable to the City of note the name of the project.and the fees befng paid If you have any questions regarding this me at 462-8495. Coppel On, matter, , please~,contac HLP/bb CC: aVe Goram, Director of Public Works yon Bowman, Planning & Zoning Coordinator Dale Jackson, Building Official CALLED TO SEE YOU WILL CALL AGAIN WANTS TO SEE YOU .ETU..EO You. CALL URGENT