DR9201-CS 920814 (2)GI_T¥
DATE:
TO:
FROM:
RE:
Alan D. Ratliff, City Manager ~ ~.
Steven G. Goram, Director of Public WorT
Howell and Bullock Complaint
The Street Superintendent and I went out and investigated these
locations and could not find any visible problem with the streets
or the drainage ditches. In fact, the drainage improvements are
complete and appear to be in good working order. The county has
begun their overlays in this area and have completed 95% of Howell.
During the overlay operation there was a car parked partially in
the street which couldn't be moved resulting in a small leave out
area that will be corrected when the county returns to overlay
Bullock. The preparation work for Bullock has been completed which
consisted of going in and breaking up the old asphalt surface and
reshaping the road. This has left an unfinished surface on Bullock
that will be overlaid within the next 10-14 days.
If you have any questions, please call.
SGG/bc
PWHB.SGG