DR9201-CS 920626DATE:
TO=
FROM:
COPPELL PUBLIC WORKS
MEMORANDDM
June 26, 1992
Steven G. Goram, Director o~ Public ~ks
Rey Gonzales, Streets SuperintendentS_./
Howell and Bullock Drainage and Paving Improvements
(Tickler 6/26/92)
The County anticipates beginning the overlays for all the streets
currently outstanding on 7/6/92. Mike Sharp said that the weather
and multiple projects have really slowed down the contractor.
The drainage contractor will be ready for a walk thru inspection on
6/30/92. Please advise if you are available to look at this
project with me that morning.
Next status 7/1/92
rdg
IMP 1. RG